February 2004 Monthly Operating Report for South Texas Project, Units 1 and 2
ML040760722
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/11/2004
From: Mallen F
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-04001694
Download: ML040760722 (14)


Text

Nuclear Operating Compas

&5 1fhtA QdzyU&Zr MHmAk T=77J1 March 11, 2004 NOC-AE-04001694 File No.: G02 10CFR50.71 STI: 31708997 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for February 2004 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for February 2004.

If you should have any questions on this matter, please contact R.L. Hill at (361) 972-7667.

F.H. Mallen General Manager, Financial Support Attachments: 1)

STPEGS Unit 1 Monthly Operating Report - February 2004

2)

STPEGS Unit 2 Monthly Operating Report - February 2004

cc:

(paper copy)

(electronic copy)

Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Jeffrey Cruz U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP L. D. Blaylock City Public Service David H. Jaffe U. S. Nuclear Regulatory Commission R. L. Balcom Texas Genco, LP A. Ramirez City of Austin C. A. Johnson AEP Texas Central Company Jon C. Wood Matthews & Branscomb C.-M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT I MONTHLY OPERATING REPORT FEBRUARY 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Approved By:

id_

E.D. HALPIN 3-10-0' Date

MONTHLY

SUMMARY

South Texas Project Unit 1 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKET NO.

50498 UNIT I

DATE Mar. 8. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: 2/1/04 - 2/29/04 GROSS HOURS IN REPORTING PERIOD:

696

2.

CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1,250.

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE 5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HOURS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

NET ELECTRICAL ENERGY GENERATED (MWH)

REACTOR SERVICE FACTOR (%/)

REACTOR AVAILABILITY FACTOR (%)

UNIT SERVICE FACTOR (%)

UNIT AVAILABILITY FACTOR (%)

UNIT CAPACITY FACTOR - Using MDC (%)

UNIT CAPACITY FACTOR - Using DER (as)

UNIT FORCED OUTAGE RATE (%)

696.0 0

696.0 0

2.693.685 8981001 100.0 100.0 100.0 100.0 103.2 103.2 0.0 1.384.9 0

1.368.8 0

5.256.819 1.748.508 96.2 962 95.1 97.1 2211 4.9 105.400.4 0

103.696.3 388.224.276 126.82.345 77.5 77.5 76.2 76.2 74.6 74.6 14.6 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-498 UNIT 1

DATE Mar. 8. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH FEBRUARY DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1290 1291 1292 1289 1289 1291 1292 1291 1289 1289 1290 1290 1290 1290 1291 1292 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 1290 18 1291 19 1290 20 1291 21 1291 22 1290 23 1290 24 1286 25 1288 26 1291 27 1292 28 1291 29 1289

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-498 UNIT I

DATE Mar. 8. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH FEBRUARY 12 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report#

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD I

I I

I I

I I

I I

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT FEBRUARY 2004 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50499 LICENSE NO. NPF-80 Approved By:

j Wk h-A E.D. HALPIN

_3 4D-ate Date

MONTHLY

SUMMARY

South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKETNO.

50-499 UNIT 2

DATE Mar. 8. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1.

REPORTING PERIOD: 2/1/04 - 2/29/04 GROSS HOURS IN REPORTING PERIOD:

696

2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3.853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1.250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1.250.6

3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None

4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE 5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HOURS 696.0 0

HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED (MWH)

NET ELECTRICAL ENERGY GENERATED (MWH)

REACTOR SERVICE FACTOR (%)

REACTOR AVAILABILITY FACTOR (%)

UNIT SERVICE FACTOR (%)

UNIT AVAILABILITY FACTOR (%)

UNIT CAPACITY FACTOR - Using MDC (%/)

UNIT CAPACITY FACTOR - Using DER (%)

UNIT FORCED OUTAGE RATE (as) 696.0 0

2.693.685 888.248 100.0 100.0 100.0 100.0 102.0 102.0 0.0 1,440.0 0

1,440.0 0

5,573.049 1,836.896 100.0 100.0 100.0 100.0 102.0 102.0 0.0 103.144.4 100.845.5 377.261.154 22.935.073 80.0 80.0 78.3 78.3 76.3 76.3 13.7

18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH):

Scheduled 22-day outage to allow refueling to begin on March 31, 2004.

19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO.

50-499 UNIT 2

DATE Mar. 8. 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH FEBRUARY DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 1276 1276 1276 1274 1276 1277 1277 1278 1276 1277 1276 1275 1276 1275 1276 1276 17 18 19 20 21 22 23 24 25 26 27 28 29 1276 1276 1276 1276 1278 1277 1276 1277 1276 1276 1277 1277 1276

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-499 UNIT 2

DATE Mar. 8 2004 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH FEBRUARY 1

2 3

4 5

No.

Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours)

Shutting Event Code Code Down Report#

Reactor THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD l_

l l

l l

l 1

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Cont. of Existing Outage 5-Reduction 9-Other 4

IEEE 805-1983 5

IEEE 803-1983 I..

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.