Tech Spec Page for Amendments 110 & 110 Correction of Completion Times for TS 3.9.6
ML040750142
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/05/2004
From:
NRC/NRR/DLPM
To:
References
TAC MC1684, TAC MC1685
Download: ML040750142 (1)


Text

RHR and Coolant Circulation - Low Water Level 3.9.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. No RHR loop Inoperation. B.1 Suspend operations that Immediately would cause Introduction of coolant Into the RCS with boron concentration less than required to meet the boron concentration of LCO 3.9.1.

AND B.2 Initiate action to restore one RHR loop to Immediately I operation.

AND B.3 Close all containment 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetrations providing direct access from containment atmosphere to outside atmosphere.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.6.1 Verify one RHR loop Is Inoperation and circulating 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> reactor coolant at a flow rate of > 1000 gpm.

SR 3.9.6.2 Verify correct breaker alignment and indicated power 7 days available to the required RHR pump that Is not In operation.

  • COMANCHE PEAK - UNITS I AND 2 3.9-12 Amendment No. 110