Transmittal of Occupational Radiation Exposure Report, Per Technical Specification 5.6.1
ML040690737
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/02/2004
From: Mecredy R
Rochester Gas & Electric Corp
To: Clark R
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML040690737 (3)


Text

Robert C. Mecredy I rVice President Always at Your Service Nuclear Operations March 2, 2004 Mr. Robert L. Clark Office of Nuclear Regulatory Regulation U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

Occupational Radiation Exposure Report Technical Specification 5.6.1 R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Clark:

In accordance with the Ginna Station Improved Technical Specification 5.6.1, which requires a tabulation of the number of personnel receiving exposures > 100 mrem/yr, the attached report is hereby submitted. Should there be any questions, please contact Nicholas C. Leoni at (585)-771-3805 for additional information.

Very truly yours, Robert C. Mecredy Attachment xc:

Mr. Robert Clark (Mail Stop 0-8-C2)

Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector An equal opportunity employer 89 East Avenue I Rochester, NY 14649 tel (585) 546-2700 www.rge.com rnO'9E An Energy East Company

Rochester Gas & Electric Corporation Ginna Station DPR-1 8 Annual Report for Occupational Radiation Exposure for 1/1/03 through 12/31/03 Number of Persons > 100 mRem Total Man-Rem

'Work and Job Function Station Utility Contractor Station Utility Contractor Inservice Inspection ENGINEERING PERSONNEL 0

0 4

0.000 0.000 0.876 MAINTENANCE PERSONNEL 0

0 7

0.000 0.000 1.733 Modifications ENGINEERING PERSONNEL 1

0 0

0.373 0.000 0.000 MAINTENANCE PERSONNEL 3

2 48 0.978 0.336 14.109 OPERATING PERSONNEL 0

0 1

0.000 0.000 0.144 Reactor Operations & Sur HEALTH PHY. PERSONNEL 5

0 18 2.188 0.000 4.977 OPERATING PERSONNEL 10 0

0 1.426 0.000 0.000 Refueling ENGINEERING PERSONNEL I

0 0

0.286 0.000 0.000 HEALTH PHY. PERSONNEL 0

0 4

0.000 0.000 0.826 MAINTENANCE PERSONNEL 1

3 0

0.185 0.538 0.000 OPERATING PERSONNEL 2

0 27 0.753 0.000 8.129 Routine Maintenance ENGINEERING PERSONNEL 2

7 5

0.443 3.282 1.074 HEALTH PHY. PERSONNEL 6

0 6

1.501 0.000 1.750 MAINTENANCE PERSONNEL 14 8

26 3.628 1.734 4.378 OPERATING PERSONNEL 4

1 0

0.475 0.162 0.000 SUPERVISORY PERSONNEL 0

0 1

0.000 0.000 0.127 Tuesday, February 03, 2004 Page I of 2

S.r Number of Persons > 100 mRem Total Mlan-Rem Work and Job Function Station Utility Contractor Station Utility Contractor Special Maintenance ENGINEERING PERSONNEL 0

3 1

0.000 2.218 0.164 HEALTH PHY. PERSONNEL I

0 1

0.365 0.000 0.334 MAINTENANCE PERSONNEL I

0 4

0.295 0.000 0.858 W'aste Processing ENGINEERING PERSONNEL 2

0 0

0.280 0.000 0.000 HEALTH PHY. PERSONNEL 0

0 11 0.000 0.000 2.020 Sub Totals ENGINEERING PERSONNEL 6

10 10 1.382 5.500 2.114 HEALTH PHY. PERSONNEL 12 0

40 4.054 0.000 9.907 MAINTENANCE PERSONNEL 19 13 85 5.086 2.608 21.078 OPERATING PERSONNEL 16 1

28 2.654 0.162 8.273 SUPERVISORY PERSONNEL 0

0 1

0.000 0.000 0.127 53 24 164 13.176 8.270 41.499 Grand Total Note:

Workers are listed only under one Work and Job Function Tuesday, February 03, 2004 Page 2 of 2