ML040650506
| ML040650506 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 03/04/2004 |
| From: | Macon W NRC/NRR/DLPM/LPD3 |
| To: | Crane C Exelon Generation Co |
| Macon W, NRR/DLPM,415-3965 | |
| Shared Package | |
| ML040480396 | List: |
| References | |
| TAC MB8198, TAC MB8199 | |
| Download: ML040650506 (1) | |
Text
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 3 of 4)
Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES OR REFERENCED OTHER REOUIRED FROM SPECIFIED CHANNELS PER REOUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REOUIREMENTS VALUE
- 3. High Pressure Core Spray (HPCS) System
- a. Reactor Vessel Water 1.2.3.
4"'
B SR 3.3.5.1.1 2 -83 inches Level-Low Low.
SR 3.3.5.1.2 Level 2 410,5(.)
SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6
- b. Drywell Pressure-High 1.2.3 4(bl B
SR 3.3.5.1.2 5 1.77 psig SR 3.3.5.1.4 SR 3.3.5.1.5 SR 3.3.5.1.6
- c. Reactor Vessel Water 1.2.3.
2 C
SR 3.3.5.1.1 s 66.5 inches Level-High. Level 8 SR 3.3.5.1.2 4(a)5(.)
SR 3.3.5.1.4 SR 3.3.5.1.5
- d. HPCS Pump Discharge 1.2.3.
1 D
SR 3.3.5.1.2 2 113.2 psig Pressure-High SR 3.3.5.1.4 (Bypass) 4M,50)
- e.
HPCS System Flow 1,2.3.
1 D
SR 3.3.5.1.2 2 1380 gpm and Rate-Low (Bypass)
SR 3.3.5.1.3 s 2194 gpm 4(a),5(s)
- f. Manual Initiation 1.2,3.
1 C
SR 3.3.5.1.5 NA 4X',5Ia'
- 4. Automatic Depressurizat1on System (ADS) Trip System A
- a. Reactor Vessel Water 1,2(c,.3(c 2
E SR 3.3.5.1.1 2 -147.0 Level-Low Low Low, SR 3.3.5.1.2 Inches Level 1 SR 3.3.5.1.4 SR 3.3.5.1.5
- b.
Drywell Pressure-High 1.2tc).3(c) 2 E
SR 3.3.5.1.2 s 1.77 psig SR 3.3.5.1.4 SR 3.3.5.1.5
- c. ADS Initiation Timer 1,2k).3-1 F
SR 3.3.5.1.2 5 118 seconds SR 3.3.5.1.4 SR 3.3.5.1.5 (continued)
I (a) When associated ECCS subsystemis) are required to be OPERABLE per LCO 3.5.2.
(b) Also required to initiate the associated DG.
(c) With reactor steam dome pressure > 150 psig.
LaSalle I and 2 3.3.5.1-10 Amendment No. 165/151