March 3, 2004 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
REVISION OF SCHEDULE FOR THE CONDUCT OF REVIEW OF THE DONALD C. COOK NUCLEAR PLANT, UNIT 1 AND 2 LICENSE RENEWAL APPLICATION
Dear Mr. Nazar:
Enclosed is a revised schedule for the review of the Donald C. Cook Nuclear Plant, Units 1 and 2, license renewal application. This schedule has been revised to reflect the 22-month review plan. Because no hearing was requested and granted, the milestones associated with time to conduct a hearing was removed from the schedule. If you have any questions on the revised review schedule, please contact me by telephone at 301-415-1471 or via electronic mail at jhe@nrc.gov.
Sincerely,
/RA/
Johnny Eads, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvements Programs Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316
Enclosure:
As stated cc w/encl: See next page
March 3, 2004 Mr. Mano K. Nazar Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
REVISION OF SCHEDULE FOR THE CONDUCT OF REVIEW OF THE DONALD C. COOK NUCLEAR PLANT, UNIT 1 AND 2 LICENSE RENEWAL APPLICATION
Dear Mr. Nazar:
Enclosed is a revised schedule for the review of the Donald C. Cook Nuclear Plant, Units 1 and 2, license renewal application. This schedule has been revised to reflect the 22-month review plan. Because no hearing was requested and granted, the milestones associated with time to conduct a hearing was removed from the schedule. If you have any questions on the revised review schedule, please contact me by telephone at 301-415-1471 or via electronic mail at jhe@nrc.gov.
Sincerely,
/RA/
Johnny Eads, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvements Programs Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
See next page Document Name: C:\\ORPCheckout\\FileNET\\ML040650264.wpd Accession No: ML040650264 OFFICE LA:RLEP Student Engineer PM:RLEP SC:RLEP NAME MJenkins D. Chen JEads SLee DATE 2/27/04 3/1/04 3/1/04 3/3/04 OFFICIAL RECORD COPY
DISTRIBUTION: Dated: March 3, 2004 Accession No: ML040650264 HARD COPY RLEP RF J. Eads E-MAIL:
PUBLIC J. Craig D. Matthews F. Gillespie C. Grimes RidsNrrDe E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair S. Black B. Boger D. Thatcher R. Pettis G. Galletti C. Li J. Moore R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
S. Duraiswamy Y. L. (Renee) Li RLEP Staff J. Stang J. Strasma, RIII OPA
Enclosure D.C. COOK, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW SCHEDULE MILESTONE SCHEDULE ACTUAL Receive license renewal application 11/03/03 11/03/2003 Federal Register Notice (FRN) published for receipt & availability 11/10/03 11/10/2003 FRN published for acceptance/rejection 12/10/03 12/10/2003 FRN published for opportunity for hearing 12/10/03 12/10/2003 Deadline for filing hearing requests and petitions for intervention 01/12/04 01/12/2004 Scoping and screening methodology audit complete 01/16/04 01/16/2004 FRN published for intent/environmental scoping meeting 02/06/04 02/06/2004 Environmental scoping meeting 03/09/04 Environmental scoping period ends 04/06/04 Environmental requests for additional information (RAIs) issued 05/05/04 Environmental RAIs responses received 06/04/04 Draft supplemental environmental impact statement (SEIS) issued 09/24/04 Public meeting to discuss Draft SEIS 11/03/04 End of Draft SEIS comment period 12/15/04 Safety evaluation report (SER) with open items issued 12/21/04 Advisory Committee on Reactor Safeguards (ACRS) Subcommittee 01/05 meeting on SER with open items SER open items responses received 02/16/05 Final SEIS issued 05/13/05 SER issued 05/30/05 ACRS Full Committee meeting on SER 07/05 ACRS letter issued 07/05 Staff Recommendation to Director, NRR 08/31/05 Decision - Director, NRR (license issued, if approved) 09/09/05
Donald C. Cook Nuclear Plant, Units 1 and 2 cc:
Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, MI 48913 Township Supervisor Lake Township Hall P.O. Box 818 Bridgman, MI 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, MI 49127 David W. Jenkins, Esquire Indiana Michigan Power Company One Cook Place Bridgman, MI 49106 Mayor, City of Bridgman P.O. Box 366 Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, MI 48909 Mr. John A. Zwolinski Director, Design Engineering and Regulatory Affairs Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107 Michigan Department of Environmental Quality Waste and Hazardous Materials Div.
Hazardous Waste & Radiological Protection Section Nuclear Facilities Unit Constitution Hall, Lower-Level North 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741 David A. Lochbaum Nuclear Safety Engineer Union of Concern Scientists 1707 H Street NW, Suite 600 Washington, DC 20036 Michael J. Finissi, Plant Manager Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Mr. Joseph N. Jensen, Site Vice President Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Mr. Fred Emerson Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, DC 20006-3708 Richard J.Grumbir Project Manager, License Renewal Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107