March 2, 2004 Mr. T. Palmisano Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS

Dear Mr. Palmisano:

In a letter dated September 26, 2003, your staff responded to NRC Regulatory Issue Summary (RIS) 2003-14, "Preparation and Scheduling of Operator Licensing Examinations," for the Monticello Nuclear Generating Plant. Initial license examinations were requested during the weeks of May 9, 2005, and December 4, 2006. Because of heavy workload, the examination requested for May 9 was rescheduled to the week of May 2, 2005, per a telephone conversation between myself and Mr. G. Lashinsky, of your staff. A chief examiner has been assigned to that examination. Because the number of candidates anticipated in that examination exceeds 10, we have also scheduled the week of May 9 to ensure adequate time to administer the examination. Please inform us if the number of candidates decreases below 10 as this will impact the examination schedule. The examination requested for December 2006 will be scheduled as we approach that date.

On-site validation of the examinations will occur at Monticello Nuclear Generating Plant approximately 3 weeks before the examination administration date. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examinations at a mutually acceptable date.

As indicated in your RIS response letter, your staff will develop the examinations. A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination informing them of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. D. McNeil of my staff at 630-829-9737.

T. Palmisano In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc:

J. Cowan, Executive Vice President and Chief Nuclear Officer Manager, Regulatory Affairs J. Rogoff, Esquire, Vice President, Counsel and Secretary Nuclear Asset Manager, Xcel Energy, Inc.

Commissioner, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)

Commissioner, Minnesota Pollution Control Agency D. Gruber, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office

T. Palmisano In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc:

J. Cowan, Executive Vice President and Chief Nuclear Officer Manager, Regulatory Affairs J. Rogoff, Esquire, Vice President, Counsel and Secretary Nuclear Asset Manager, Xcel Energy, Inc.

Commissioner, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)

Commissioner, Minnesota Pollution Control Agency D. Gruber, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office DOCUMENT NAME: G:\\DRS\\ML040640694.wpd To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS RIII:DRS RIII:DRS NAME MABies:sd DMcNeil RDLanksbury DATE 02/24/04 11/24/03 03/2/04 OFFICIAL RECORD COPY

T. Palmisano ADAMS Distribution:

WDR DFT SXM1 LMP DCT RidsNrrDipmIipb GEG HBC SXB3 DRPIII DRSIII PLB1 JRK1 M. A. Bies (concurrence copy)