Inspection/Activity Plan
ML040640505
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/03/2004
From:
NRC/RGN-II
To:
Shared Package
ML040640482 List:
References
IR-04-001
Download: ML040640505 (2)


Text

Page 1 of 2 Turkey Point 03/03/2004 09:03:18 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/154 - TI 2515/154 - SPENT FUEL MC&A 2 3, 4 IP 2515/154 Spent Fuel Material Control and Accounting at Nuclear Power Plants 02/01/2004 05/29/2004 Safety Issues DRP/BR3 - PROBLEM IDENTIFICATION AND RESOLUTION 4 3, 4 IP 71152B Identification and Resolution of Problems 03/08/2004 03/12/2004 Baseline Inspections 3, 4 IP 71152B Identification and Resolution of Problems 03/22/2004 03/26/2004 Baseline Inspections EB1SSDPC - SSDPC PRE-INSPECTION VISIT 2 3, 4 IP 7111121 Safety System Design and Performance Capability 05/17/2004 05/21/2004 Baseline Inspections EB1SSDPC - SAFETY SYS DESIGN & PERF. CAPABILITY 5 3, 4 IP 7111121 Safety System Design and Performance Capability 06/07/2004 06/11/2004 Baseline Inspections 3, 4 IP 7111121 Safety System Design and Performance Capability 06/21/2004 06/25/2004 Baseline Inspections 2515/153 - TI 2515/153 RPV CONTAINMT SUMP BLOCKAGE 2 3 IP 2515/153 Reactor Containment Sump Blockage (NRC Bulletin 2003-01) 09/01/2004 11/03/2004 Safety Issues PS-SEC - SECURITY 2 3, 4 IP 7113001 Access Authorization 06/28/2004 07/02/2004 Baseline Inspections 3, 4 IP 7113002 Access Control 06/28/2004 07/02/2004 Baseline Inspections 3, 4 IP 71151 Performance Indicator Verification 06/28/2004 07/02/2004 Baseline Inspections EB2 HEAD - REACTOR HEAD REPLACEMENT 1 3 IP 71007 Reactor Vessel Head Replacement Inspection 09/13/2004 09/17/2004 Other Routine EB2-ISI - INSERVICE INSPECTION-U3 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/04/2004 10/08/2004 Baseline Inspections PS-RP - RADIATION PROTECTION 1 3, 4 IP 71007 Reactor Vessel Head Replacement Inspection 10/04/2004 10/08/2004 Other Routine 3, 4 IP 7112101 Access Control to Radiologically Significant Areas 10/04/2004 10/08/2004 Baseline Inspections EB2 HEAD - CONTAINMENT WELDING REPAIR 1 3 IP 71007 Reactor Vessel Head Replacement Inspection 10/18/2004 10/22/2004 Other Routine EB2SGISI - STEAM GENERATOR INSERVICE INSPECTION-U3 1 3 IP 7111108P Inservice Inspection Activities - PWR 10/25/2004 10/28/2004 Baseline Inspections EB2 HEAD - CONCRETE REPAIR 1 3 IP 71007 Reactor Vessel Head Replacement Inspection 10/25/2004 10/29/2004 Other Routine 2515/152 - U-3 2515/152: RPV LOWER HEAD PENETRATION 1 3 IP 2515/152 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02) 10/25/2004 11/01/2004 Safety Issues EB2-MODS - MODIFICATIONS/10CFR50.59 3 3, 4 IP 7111102 Evaluation of Changes, Tests, or Experiments 01/10/2005 01/14/2005 Baseline Inspections 3, 4 IP 7111117B Permanent Plant Modifications 01/10/2005 01/14/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Turkey Point 03/03/2004 09:03:18 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL PREP - INITIAL EXAM PRE-INSPECTION VISIT 3 3 V23209 TURKEY POINT/EXAMS AT POWER FACILITIES 02/07/2005 02/11/2005 Not Applicable EB2 HEAD - REACTOR HEAD REPLACEMENT 1 4 IP 71007 Reactor Vessel Head Replacement Inspection 02/14/2005 02/18/2005 Other Routine OL EP - EMERGENCY EXERCISE 2 3, 4 IP 7111401 Exercise Evaluation 02/14/2005 02/18/2005 Baseline Inspections 3, 4 IP 71151 Performance Indicator Verification 02/14/2005 02/18/2005 Baseline Inspections OL EXAM - LICENSED OPERATOR - INITIAL EXAM 3 3 V23209 TURKEY POINT/EXAMS AT POWER FACILITIES 02/21/2005 03/04/2005 Not Applicable EB2-ISI - INSERVICE INSPECTION-U4 1 4 IP 7111108P Inservice Inspection Activities - PWR 03/07/2005 03/11/2005 Baseline Inspections EB2 HEAD - CONTAINMENT WELDING REPAIR 1 4 IP 71007 Reactor Vessel Head Replacement Inspection 03/14/2005 03/18/2005 Other Routine EB2 HEAD - CONCRETE REPAIR 1 4 IP 71007 Reactor Vessel Head Replacement Inspection 03/21/2005 03/25/2005 Other Routine PS-RP - RADIATION PROTECTION 3 3, 4 IP 71007 Reactor Vessel Head Replacement Inspection 04/18/2005 04/22/2005 Other Routine 3, 4 IP 7112101 Access Control to Radiologically Significant Areas 04/18/2005 04/22/2005 Baseline Inspections 3, 4 IP 7112102 ALARA Planning and Controls 04/18/2005 04/22/2005 Baseline Inspections 3, 4 IP 7112202 Radioactive Material Processing and Transportation 04/18/2005 04/22/2005 Baseline Inspections 3, 4 IP 71151 Performance Indicator Verification 04/18/2005 04/22/2005 Baseline Inspections PS-RP - RADIATION PROTECTION 2 3, 4 IP 71007 Reactor Vessel Head Replacement Inspection 05/16/2005 05/20/2005 Other Routine 3, 4 IP 7112101 Access Control to Radiologically Significant Areas 05/16/2005 05/20/2005 Baseline Inspections 3, 4 IP 7112102 ALARA Planning and Controls 05/16/2005 05/20/2005 Baseline Inspections 3, 4 IP 7112202 Radioactive Material Processing and Transportation 05/16/2005 05/20/2005 Baseline Inspections 3, 4 IP 71151 Performance Indicator Verification 05/16/2005 05/20/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.