Turkey Point Inspection / Activity Plan 03/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2004 09:03:18 Report 22 2

2515/154

- TI 2515/154 - SPENT FUEL MC&A Safety Issues 02/01/2004 05/29/2004 Spent Fuel Material Control and Accounting at Nuclear Power Plants IP 2515/154 3,4 4

DRP/BR3

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 03/08/2004 03/12/2004 Identification and Resolution of Problems IP 71152B 3,4 Baseline Inspections 03/22/2004 03/26/2004 Identification and Resolution of Problems IP 71152B 3,4 2

EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 05/17/2004 05/21/2004 Safety System Design and Performance Capability IP 7111121 3,4 5

EB1SSDPC - SAFETY SYS DESIGN & PERF. CAPABILITY Baseline Inspections 06/07/2004 06/11/2004 Safety System Design and Performance Capability IP 7111121 3,4 Baseline Inspections 06/21/2004 06/25/2004 Safety System Design and Performance Capability IP 7111121 3,4 2

2515/153

- TI 2515/153 RPV CONTAINMT SUMP BLOCKAGE Safety Issues 09/01/2004 11/03/2004 Reactor Containment Sump Blockage (NRC Bulletin 2003-01)

IP 2515/153 3

2 PS-SEC

- SECURITY Baseline Inspections 06/28/2004 07/02/2004 Access Authorization IP 7113001 3,4 Baseline Inspections 06/28/2004 07/02/2004 Access Control IP 7113002 3,4 Baseline Inspections 06/28/2004 07/02/2004 Performance Indicator Verification IP 71151 3,4 1

EB2 HEAD

- REACTOR HEAD REPLACEMENT Other Routine 09/13/2004 09/17/2004 Reactor Vessel Head Replacement Inspection IP 71007 3

1 EB2-ISI

- INSERVICE INSPECTION-U3 Baseline Inspections 10/04/2004 10/08/2004 Inservice Inspection Activities - PWR IP 7111108P 3

1 PS-RP

- RADIATION PROTECTION Other Routine 10/04/2004 10/08/2004 Reactor Vessel Head Replacement Inspection IP 71007 3,4 Baseline Inspections 10/04/2004 10/08/2004 Access Control to Radiologically Significant Areas IP 7112101 3,4 1

EB2 HEAD

- CONTAINMENT WELDING REPAIR Other Routine 10/18/2004 10/22/2004 Reactor Vessel Head Replacement Inspection IP 71007 3

1 EB2SGISI

- STEAM GENERATOR INSERVICE INSPECTION-U3 Baseline Inspections 10/25/2004 10/28/2004 Inservice Inspection Activities - PWR IP 7111108P 3

1 EB2 HEAD

- CONCRETE REPAIR Other Routine 10/25/2004 10/29/2004 Reactor Vessel Head Replacement Inspection IP 71007 3

1 2515/152

- U-3 2515/152: RPV LOWER HEAD PENETRATION Safety Issues 10/25/2004 11/01/2004 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02)

IP 2515/152 3

3 EB2-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 01/10/2005 01/14/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 3,4 Baseline Inspections 01/10/2005 01/14/2005 Permanent Plant Modifications IP 7111117B 3,4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Turkey Point Inspection / Activity Plan 03/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2004 09:03:18 Report 22 3

OL PREP

- INITIAL EXAM PRE-INSPECTION VISIT Not Applicable 02/07/2005 02/11/2005 TURKEY POINT/EXAMS AT POWER FACILITIES V23209 3

1 EB2 HEAD

- REACTOR HEAD REPLACEMENT Other Routine 02/14/2005 02/18/2005 Reactor Vessel Head Replacement Inspection IP 71007 4

2 OL EP

- EMERGENCY EXERCISE Baseline Inspections 02/14/2005 02/18/2005 Exercise Evaluation IP 7111401 3,4 Baseline Inspections 02/14/2005 02/18/2005 Performance Indicator Verification IP 71151 3,4 3

OL EXAM

- LICENSED OPERATOR - INITIAL EXAM Not Applicable 02/21/2005 03/04/2005 TURKEY POINT/EXAMS AT POWER FACILITIES V23209 3

1 EB2-ISI

- INSERVICE INSPECTION-U4 Baseline Inspections 03/07/2005 03/11/2005 Inservice Inspection Activities - PWR IP 7111108P 4

1 EB2 HEAD

- CONTAINMENT WELDING REPAIR Other Routine 03/14/2005 03/18/2005 Reactor Vessel Head Replacement Inspection IP 71007 4

1 EB2 HEAD

- CONCRETE REPAIR Other Routine 03/21/2005 03/25/2005 Reactor Vessel Head Replacement Inspection IP 71007 4

3 PS-RP

- RADIATION PROTECTION Other Routine 04/18/2005 04/22/2005 Reactor Vessel Head Replacement Inspection IP 71007 3,4 Baseline Inspections 04/18/2005 04/22/2005 Access Control to Radiologically Significant Areas IP 7112101 3,4 Baseline Inspections 04/18/2005 04/22/2005 ALARA Planning and Controls IP 7112102 3,4 Baseline Inspections 04/18/2005 04/22/2005 Radioactive Material Processing and Transportation IP 7112202 3,4 Baseline Inspections 04/18/2005 04/22/2005 Performance Indicator Verification IP 71151 3,4 2

PS-RP

- RADIATION PROTECTION Other Routine 05/16/2005 05/20/2005 Reactor Vessel Head Replacement Inspection IP 71007 3,4 Baseline Inspections 05/16/2005 05/20/2005 Access Control to Radiologically Significant Areas IP 7112101 3,4 Baseline Inspections 05/16/2005 05/20/2005 ALARA Planning and Controls IP 7112102 3,4 Baseline Inspections 05/16/2005 05/20/2005 Radioactive Material Processing and Transportation IP 7112202 3,4 Baseline Inspections 05/16/2005 05/20/2005 Performance Indicator Verification IP 71151 3,4 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.