Inspection/Activity Plan, Vogtle for 03/01/2004 - 09/30/2005
ML040640349
Person / Time
Site: Vogtle  
Issue date: 03/03/2004
From:
NRC/RGN-II
To:
Shared Package
ML040640332 List:
References
IR-04-001
Download: ML040640349 (2)


Text

Vogtle Inspection / Activity Plan 03/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2004 10:30:33 Report 22 2

PB2-154

- SPENT FUEL MC&A Safety Issues 03/28/2004 06/26/2004 Spent Fuel Material Control and Accounting at Nuclear Power Plants IP 2515/154 1, 2 1

EB2-HS

- HEAT SINK Baseline Inspections 04/12/2004 04/16/2004 Heat Sink Performance IP 7111107B 1, 2 2

PB2-150

- RPV & VHP INSPECTION Safety Issues 04/18/2004 05/12/2004 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-0 IP 2515/150 2

2 PB2-152

- RPV LOWER HEAD INSPECTION Safety Issues 04/18/2004 05/12/2004 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02)

IP 2515/152 2

2 PB2-153

- CONTAINMENT SUMP BLOCKAGE INSPECTION Safety Issues 04/18/2004 05/12/2004 Reactor Containment Sump Blockage (NRC Bulletin 2003-01)

IP 2515/153 2

2 EB2-ISI

- INSERVICE INSPECTION-U2 Baseline Inspections 04/26/2004 04/30/2004 Inservice Inspection Activities - PWR IP 7111108P 2

2 PS-RP

- RADIATION PROTECTION Baseline Inspections 04/26/2004 04/30/2004 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 04/26/2004 04/30/2004 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 04/26/2004 04/30/2004 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 04/26/2004 04/30/2004 Performance Indicator Verification IP 71151 1, 2 2

PS-RP

- RADIATION PROTECTION Baseline Inspections 05/03/2004 05/07/2004 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 05/03/2004 05/07/2004 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 05/03/2004 05/07/2004 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 05/03/2004 05/07/2004 Performance Indicator Verification IP 71151 1, 2 2

PS-SEC

- SECURITY Baseline Inspections 05/24/2004 05/28/2004 Access Authorization IP 7113001 1, 2 Baseline Inspections 05/24/2004 05/28/2004 Access Control IP 7113002 1, 2 2

PS-SEC

- SOUTH. NUC. CORP.ACCESS AUTH. BIRMINGHA Baseline Inspections 05/24/2004 05/28/2004 Access Authorization IP 7113001 1, 2 4

EB1-TFP

- TRIENNIAL FIRE PROTECTION PRE-INSP VISIT Baseline Inspections 07/26/2004 07/30/2004 Fire Protection IP 7111105T 1, 2 4

EB1-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 08/16/2004 08/20/2004 Fire Protection IP 7111105T 1, 2 Baseline Inspections 08/30/2004 09/03/2004 Fire Protection IP 7111105T 1, 2 2

OL EP

- EMERGENCY EXERCISE Baseline Inspections 09/20/2004 09/24/2004 Exercise Evaluation IP 7111401 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Vogtle Inspection / Activity Plan 03/01/2004 - 09/30/2005 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2004 10:30:33 Report 22 2

OL EP

- EMERGENCY EXERCISE Baseline Inspections 09/20/2004 09/24/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 09/20/2004 09/24/2004 Performance Indicator Verification IP 71151 1, 2 1

PB2-FP

- FLOOD PROTECTION Baseline Inspections 10/04/2004 10/08/2004 Flood Protection Measures IP 7111106 1, 2 4

EB2-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 10/18/2004 10/22/2004 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 10/18/2004 10/22/2004 Permanent Plant Modifications IP 7111117B 1, 2 4

PB2-PI&R

- BIENNIAL PI&R Baseline Inspections 11/01/2004 11/05/2004 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 11/15/2004 11/19/2004 Identification and Resolution of Problems IP 71152B 1, 2 1

EB2-ISI

- INSERVICE INSPECTION-U1 Baseline Inspections 03/14/2005 03/18/2005 Inservice Inspection Activities - PWR IP 7111108P 1

1 OL EP

- EP INSPECTION Baseline Inspections 06/27/2005 07/01/2005 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 06/27/2005 07/01/2005 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 06/27/2005 07/01/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 06/27/2005 07/01/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 06/27/2005 07/01/2005 Performance Indicator Verification IP 71151 1, 2 2

EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 07/18/2005 07/22/2005 Safety System Design and Performance Capability IP 7111121 1, 2 2

OL RQ

- REQUAL INSPECTION Baseline Inspections 08/08/2005 08/12/2005 Licensed Operator Requalification Program IP 7111111B 1, 2 5

EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 08/15/2005 08/19/2005 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 08/29/2005 09/02/2005 Safety System Design and Performance Capability IP 7111121 1, 2 3

PS-RP

- RP PUBLIC BASELINE Baseline Inspections 08/29/2005 09/02/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 08/29/2005 09/02/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 08/29/2005 09/02/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 08/29/2005 09/02/2005 Radiological Environmental Monitoring Program IP 7112203 1, 2 Baseline Inspections 08/29/2005 09/02/2005 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.