Page 1 of 3 Browns Ferry 03/03/2004 14:20:47 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2-BF1 - UNIT 1 IGSCC SPECIAL PROGRAM 2 1 IP 55050 Nuclear Welding General Inspection Procedure 03/01/2004 03/05/2004 Other Routine EB2-ISI - UNIT 3 INSERVICE INSPECTION 2 3 IP 7111108G Inservice Inspection Activities - BWR 03/08/2004 03/11/2004 Baseline Inspections OL PREP - INITIAL OPERATOR LICENSE EXAM PREP 3 1 V23214 BROWNS FERRY/EXAMS AT POWER FACILITIES 03/29/2004 04/02/2004 Not Applicable EB2-BF1 - ELEC CONDUIT / HVAC / SEISMIC II/I INSP 1 1 IP 62002 Inspection Of Structures, Passive Components, And Civil Engineering Features At Nuclear P 04/05/2004 04/09/2004 Other Routine OL EXAM - INITIAL OPERATOR LICENSE EXAM 3 1 V23214 BROWNS FERRY/EXAMS AT POWER FACILITIES 04/26/2004 04/30/2004 Not Applicable EB1-ELEC - CABLE AMPACITY, INSTALLATION INSP 4 1 IP 37550 Engineering 05/03/2004 05/08/2004 Core ISFSI - ISFSI CONSTRUCTION 1 1, 2, 3 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI 05/10/2004 05/14/2004 Other Routine EB2-HS - HEAT SINK 1 2, 3 IP 7111107B Heat Sink Performance 05/17/2004 05/21/2004 Baseline Inspections 2515/154 - SPENT FUEL MAT. CONTROL & ACCOUNTABILITY 1 1, 2, 3 IP 2515/154 Spent Fuel Material Control and Accounting at Nuclear Power Plants 05/23/2004 05/29/2004 Safety Issues EB2-BF1 - CRD PIPING & INST TUBING SPECIAL PROGRAM 1 1 IP 37550 Engineering 06/01/2004 06/04/2004 Core EB2-BF1 - INST TUBE, SMALL BORE PIPE SPECIAL PROG 2 1 IP 62002 Inspection Of Structures, Passive Components, And Civil Engineering Features At Nuclear P 06/01/2004 06/04/2004 Other Routine OL EP - EMERGENCY PREPAREDNESS 1 1, 2, 3 IP 7111402 Alert and Notification System Testing 06/07/2004 06/11/2004 Baseline Inspections 1, 2, 3 IP 7111403 Emergency Response Organization Augmentation Testing 06/07/2004 06/11/2004 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/07/2004 06/11/2004 Baseline Inspections 1, 2, 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/07/2004 06/11/2004 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 06/07/2004 06/11/2004 Baseline Inspections EB2-BF1 - UNIT 1 IGSCC SPECIAL PROGRAM 2 1 IP 55050 Nuclear Welding General Inspection Procedure 06/07/2004 06/12/2004 Other Routine EB2-BF1 - INST TUBE, SMALL BORE PIPE SPECIAL PROG 1 1 IP 50090 Pipe Support And Restraint Systems 06/21/2004 06/24/2004 Other Routine EB1-BF1 - SPECIAL PROGRAM SPLICES, FUSES 3 1 IP 37550 Engineering 07/12/2004 07/16/2004 Core This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Browns Ferry 03/03/2004 14:20:47 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2-BF1 - UNIT 1 IGSCC SPECIAL PROGRAM 2 1 IP 55050 Nuclear Welding General Inspection Procedure 07/12/2004 07/17/2004 Other Routine LIC RENE - FIRST LICENSE RENEWAL INSPECTION 4 1, 2, 3 IP 71002 License Renewal Inspection 07/19/2004 07/23/2004 License Renewal Insp EB2-BF1 - U1 SPECIAL PROGRAM (SP) - COATINGS 1 1 IP 37551 Onsite Engineering 08/08/2004 08/12/2004 Core PS-RP - RAD PROT ALARA & UNIT 1 RESTART REVIEWS 2 1, 2, 3 IP 7112102 ALARA Planning and Controls 09/07/2004 09/10/2004 Baseline Inspections PS-SEC - SECURITY 2 1, 2, 3 IP 7113001 Access Authorization 09/13/2004 09/17/2004 Baseline Inspections 1, 2, 3 IP 7113002 Access Control 09/13/2004 09/17/2004 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 09/13/2004 09/17/2004 Baseline Inspections EB1-BF1 - CABLE INSTALLATION, FLEX CONDUIT U1 SP 2 1 IP 37551 Onsite Engineering 09/20/2004 09/25/2004 Core EB1-BF1 - EQ, THERMAL OVERLOADS U1 SPECIAL PROG 3 1 IP 37550 Engineering 10/04/2004 10/08/2004 Core EB1-BF1 - ELECTRICAL PROGRAMS 2 1 IP 37550 Engineering 11/01/2004 11/05/2004 Core LIC RENE - SECOND LICENSE RENEWAL INSPECTION 4 1, 2, 3 IP 71002 License Renewal Inspection 11/15/2004 12/03/2004 License Renewal Insp EB1-BF1 - FIRE PROTECTION - UNIT 1 PROGRAM REVIEW 3 1 IP 37550 Engineering 11/27/2004 12/03/2004 Core 1 IP 64704 Fire Protection Program 11/27/2004 12/03/2004 Other Routine EB1SSDPC - SSDPC PRE-INSPECTION VISIT 2 2, 3 IP 7111121 Safety System Design and Performance Capability 12/13/2004 12/17/2004 Baseline Inspections EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY 5 2, 3 IP 7111121 Safety System Design and Performance Capability 01/10/2005 01/14/2005 Baseline Inspections 2, 3 IP 7111121 Safety System Design and Performance Capability 01/24/2005 01/28/2005 Baseline Inspections EB2-ISI - UNIT 2 INSERVICE INSPECTION 1 2 IP 7111108G Inservice Inspection Activities - BWR 02/28/2005 03/04/2005 Baseline Inspections PS-RP - RAD PROTECTION OCCUPATIONAL - WEEK 1 2 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 02/28/2005 03/04/2005 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 02/28/2005 03/04/2005 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 02/28/2005 03/04/2005 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 02/28/2005 03/04/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Browns Ferry 03/03/2004 14:20:47 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-RP - RAD PROTECTION OCCUPATIONAL - WEEK 2 2 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 03/14/2005 03/18/2005 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 03/14/2005 03/18/2005 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 03/14/2005 03/18/2005 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 03/14/2005 03/18/2005 Baseline Inspections EB2-MR - MAINTENANCE RULE 1 2, 3 IP 7111112B Maintenance Effectiveness 04/18/2005 04/22/2005 Baseline Inspections OL EP - EMERGENCY EXERCISE 2 1, 2, 3 IP 7111401 Exercise Evaluation 06/06/2005 06/10/2005 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/06/2005 06/10/2005 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 06/06/2005 06/10/2005 Baseline Inspections OL PREP - INITIAL OPERATOR LIC EXAM PREP 3 1 V23214 BROWNS FERRY/EXAMS AT POWER FACILITIES 09/19/2005 09/23/2005 Not Applicable This report does not include INPO and OUTAGE activities.