ML040640255

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan
ML040640255
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/03/2004
From:
NRC/RGN-II
To:
Shared Package
ML040640148 List:
References
Download: ML040640255 (3)


Text

Page 1 of 3 Farley 03/03/2004 10:32:11 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PB2-152 - RPV LOWER HEAD PENETRATIONS 2 2 IP 2515/152 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02) 03/13/2004 04/11/2004 Safety Issues PB2-153 - RX CONTAINMENT SUMP BLOCKAGE 2 2 IP 2515/153 Reactor Containment Sump Blockage (NRC Bulletin 2003-01) 03/13/2004 04/11/2004 Safety Issues EB2-ISI - INSERVICE INSPECTION-U2 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/22/2004 03/26/2004 Baseline Inspections PB2-154 - SPENT FUEL MC&A 2 1, 2 IP 2515/154 Spent Fuel Material Control and Accounting at Nuclear Power Plants 03/28/2004 06/26/2004 Safety Issues EB2-150 - RPV & VHP NOZZLES 1 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-0 03/29/2004 04/02/2004 Safety Issues LIC RENE - FIRST LICENSE RENEWAL INSPECTION 5 1, 2 IP 71002 License Renewal Inspection 05/10/2004 05/14/2004 License Renewal Insp PS-SEC - SOUTH. NUC. CORP. ACCESS AUTH -BIRMINGHA 2 1, 2 IP 7113001 Access Authorization 05/24/2004 05/28/2004 Baseline Inspections PS-SEC - SECURITY 2 1, 2 IP 7113001 Access Authorization 06/07/2004 06/11/2004 Baseline Inspections 1, 2 IP 7113002 Access Control 06/07/2004 06/11/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 06/07/2004 06/11/2004 Baseline Inspections PB2-FP - FLOOD PROTECTION 1 1, 2 IP 7111106 Flood Protection Measures 07/12/2004 07/16/2004 Baseline Inspections EB2-ISFS - ISFSI PAD CONSTRUCTION 1 1, 2 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI 07/19/2004 07/23/2004 Other Routine EB2-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 08/09/2004 08/13/2004 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 08/09/2004 08/13/2004 Baseline Inspections OL EP - EMERGENCY EXERCISE 2 1, 2 IP 7111401 Exercise Evaluation 08/16/2004 08/20/2004 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/16/2004 08/20/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/16/2004 08/20/2004 Baseline Inspections LIC RENE - SECOND LICENSE RENEWAL INSPECTION 4 1, 2 IP 71002 License Renewal Inspection 09/13/2004 09/17/2004 License Renewal Insp 1, 2 IP 71002 License Renewal Inspection 09/27/2004 10/01/2004 License Renewal Insp EB2 HEAD - REACTOR HEAD REPLACEMENT 1 1 IP 71007 Reactor Vessel Head Replacement Inspection 09/27/2004 10/01/2004 Other Routine This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Farley 03/03/2004 10:32:11 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PB2-152 - RPV LOWER HEAD PENETRATIONS 2 1 IP 2515/152 Reactor Pressure Vessel Lower Head Penetration Nozzles (NRC Bulletin 2003-02) 10/02/2004 10/28/2004 Safety Issues PB2-153 - RX CONTAINMENT SUMP BLOCKAGE 2 1 IP 2515/153 Reactor Containment Sump Blockage (NRC Bulletin 2003-01) 10/02/2004 10/28/2004 Safety Issues PS-RP - RP OCCUPATION BL RX HEAD REPLACEMENT W-1 3 1, 2 IP 71007 Reactor Vessel Head Replacement Inspection 10/04/2004 10/08/2004 Other Routine 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/04/2004 10/08/2004 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/04/2004 10/08/2004 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/04/2004 10/08/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/04/2004 10/08/2004 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U1 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/11/2004 10/15/2004 Baseline Inspections PS-RP - RP OCCUPATION BL RX HEAD REPLACEMENT W-2 2 1, 2 IP 71007 Reactor Vessel Head Replacement Inspection 10/18/2004 10/22/2004 Other Routine 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 10/18/2004 10/22/2004 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 10/18/2004 10/22/2004 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 10/18/2004 10/22/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/18/2004 10/22/2004 Baseline Inspections OL PREP - INITIAL EXAM PREP 2 1 V23227 FARLEY/EXAMS AT POWER FACILITIES 12/06/2004 12/10/2004 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23227 FARLEY/EXAMS AT POWER FACILITIES 01/10/2005 01/14/2005 Not Applicable EB1-TFP - TRIENNIAL FIRE PROTECTION PRE-INSP VISIT 4 1, 2 IP 7111105T Fire Protection 02/28/2005 03/04/2005 Baseline Inspections EB1-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP 7111105T Fire Protection 03/21/2005 03/25/2005 Baseline Inspections 1, 2 IP 7111105T Fire Protection 04/04/2005 04/08/2005 Baseline Inspections BR2-FP - FLOOD PROTECTION 1 1, 2 IP 7111106 Flood Protection Measures 06/26/2005 06/30/2005 Baseline Inspections EB2-MODS - MODIFICATIONS/10CFR50.59 1 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 07/18/2005 07/22/2005 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 07/18/2005 07/22/2005 Baseline Inspections EB2-PI&R - BIENNIAL PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 08/08/2005 08/12/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Farley 03/03/2004 10:32:11 Inspection / Activity Plan Report 22 03/01/2004 - 09/30/2005 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2-PI&R - BIENNIAL PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 08/22/2005 08/26/2005 Baseline Inspections EB2-MR - MAINTENANCE RULE 1 1, 2 IP 7111112B Maintenance Effectiveness 08/08/2005 08/12/2005 Baseline Inspections OL EP - EP INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 08/22/2005 08/26/2005 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 08/22/2005 08/26/2005 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/22/2005 08/26/2005 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/22/2005 08/26/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/22/2005 08/26/2005 Baseline Inspections EB2-ISI - INSERVICE INSPECTION-U2 1 2 IP 7111108P Inservice Inspection Activities - PWR 09/19/2005 09/23/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.