FPL Energy Seabrook Station FPL Energy P.O. Box 300 Seabrook, NH 03874 Seabrook Station (603) 773-7000 FEB 18 2004 Docket No. 50-443 NYN-04019 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station 2003 Annual Report of Challenges to Pressurizer Power-Operated Relief Valves and Pressurizer Safety Valves Seabrook Station Technical Specification 6.8.1.2.c requires an annual report of challenges to pressurizer power-operated relief valves and pressurizer safety valves. In accordance with this requirement, FPL Energy Seabrook, LLC hereby reports that during 2003, there were no challenges to the Seabrook Station pressurizer power-operated relief valves and pressurizer safety valves.

Should you have any questions concerning this matter, please contact Mr. Michael Makowicz, Plant Engineering Manager, at (603) 773-7770.

Very truly yours, FPL Energy Seabrook, LLC

/nes M. Peschel Drgulatory Programs Manager cc:

H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector j1co an FPL Group company