ML040620475

From kanterella
Jump to navigation Jump to search
Submittal of 2003 Steam Generator Tube Inspection Results Report
ML040620475
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/26/2004
From: Nietmann K
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML040620475 (1)


Text

Kevin J. Nietmann Plant General Manager Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 410 495-4787 Fax Constellation I

Energy Group February 26, 2004 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 2003 Steam Generator Tube Inspection Results Report

REFERENCE:

(a)

Calvert Cliffs Nuclear Power Plant Units I and 2 Technical Specification 5.6.9.b Reference (a) requires that we report, on an annual basis, the results of the steam generator tube inservice inspection conducted in the past year. Inservice inspections were not performed on either Unit I or Unit 2 during 2003. Unit 2 was not inspected due to steam generator replacement. Unit I was not scheduled for inspection in 2003.

Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, KJN/CAN/bjd cc:

J. Petro, Esquire J. E. Silberg, Esquire R. J. Laufer, NRC G. S. Vissing, NRC H. J. Miller, NRC Resident Inspector, NRC R. 1. McLean, DNR 104-7