Letter Sequence Draft RAI |
---|
|
|
MONTHYEARML0402804902004-01-28028 January 2004 Facsimile Transmission, Draft Request for Additional Information Project stage: Draft RAI ML0406110432004-03-0101 March 2004 Draft Request for Additional Information Project stage: Draft RAI ML0408501622004-03-23023 March 2004 Draft Request for Additional Information Project stage: Draft RAI ML0416604062004-06-14014 June 2004 Draft RAI, Amendment Request for Seabrook Station (Seabrook) Dated 10/06/2003, Revise Seabrooks Technical Specifications for Full Implementation of an Alternate Source Term Project stage: Draft RAI ML0421900422004-08-0606 August 2004 Draft Request for Additional Information, Amendment Request Dated 10/06/2003 to Revise Technical Specifications for Full Implementation of Alternate Source Term Project stage: Draft RAI ML0433603572004-12-0101 December 2004 Unnit No. 1 - Draft Request for Additional Information Project stage: Draft RAI ML0501203742005-01-12012 January 2005 Safety Evaluation Input for Proposed License Amendment for Implementation of Alternative Source Term at Seabrook Station Project stage: Approval ML0503203732005-02-24024 February 2005 Issuance of License Amendment 100 Alternative Source Term Project stage: Approval ML0506002522005-02-24024 February 2005 Technical Specification Page Re Alternative Source Term Project stage: Other ML0510301382005-04-15015 April 2005 Correction of the Safety Evaluation to Amendment 100 Regarding the Alternative Source Term Project stage: Approval 2004-06-14
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML23053A0502023-02-22022 February 2023 Cover Memo and Response to C-10 Questions Regarding 3Q2022 Inspection Report ML22306A0202022-11-0202 November 2022 Cover Memo and Response to C-10 Questions Regarding 2Q2022 Inspection Report ML21242A2242021-08-26026 August 2021 C-10 Research & Education Foundation Memo Dated 8/26/21 Re Questions Regarding the 2021 Second Quarter Integrated Inspection Report (05000443/2021002) ML21062A1462021-04-21021 April 2021 Memo to File: Final Ea/Fonsi of 2012 and 2015 Decommissioning Funding Plans for Seabrook Station Unit 1 Independent Spent Fuel Storage Installation (2012 and 2015) ML19057A3832019-03-0404 March 2019 Renewal of Full-Power Operating License for Seabrook Station, Unit No. 1 ML19058A2162019-03-0404 March 2019 Update to Proposed Issuance of a Final No Significant Hazards Consideration Determination and License Amendment Regarding Which a Hearing Has Been Requested (CAC No. MF8260; EPID L-2016-LLA-0007) ML18226A2052018-09-28028 September 2018 Redacted, Submission of Alkali-Silica Reaction License Amendment Request Draft Safety Evaluation to Support Advisory Committee on Reactor Safeguards Review of Seabrook License Renewal (CAC No. MF8260; EPID L-2016-LLA-0007) ML18243A4522018-08-31031 August 2018 License Renewal Application Memorandum ML17278A1662017-10-0505 October 2017 Teleconference Meeting Summary Dated August 28, 2017 with Massachusetts Attorney General'S Office and Massachusetts Emergency Management Agency ML17254A7522017-09-0606 September 2017 Alkali-Silica Reaction Issue Technical Team Charter Revision 2 ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16056A3342016-03-0101 March 2016 Memorandum to File Regarding Transcript for 10 CFR 2.206 Petition from C-10 Research & Education Foundation Regarding Seabrook Station, Unit 1 ML15096A1682015-07-27027 July 2015 Memorandum to File from John Lamb, DORL, NRR No Significant Hazards Consideration Analysis and Categorical Exclusion Related to Proposed Exemption ML14014A3782014-02-19019 February 2014 Alkali-Silica Reaction (ASR) Issue Technical Team Charter, Revision 1 ML13193A0742013-07-16016 July 2013 Request for Additional Information - Seabrook Station Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (Tac No. MF0837) ML13128A5212013-06-10010 June 2013 Memo Position Paper -Assessment of Aci 318-71 as Design Basis for Category I Concrete Structures Affected by Alkalisilica Reaction at Seabrook Station. ML13154A5052013-06-0404 June 2013 Rai'S Following Ifib Analysis of NextEra Energy'S 2013 Decommissioning Funding Status Reports for Seabrook ML13099A2152013-04-18018 April 2013 Forthcoming Meeting with Nextera Energy Seabrook, LLC (Nextera) Regarding a Pre-Submittal for a Fixed Incore Detector License Amendment Request ML13066A4882013-03-21021 March 2013 Summary of Meeting Held on February 21, 2013, Between the NRC and NextEra Energy Seabrook, LLS Regarding License Renewal Application, Seabrook Station ML12242A3702012-09-0505 September 2012 Request for Deviation from the Reactor Oversight Process Action Matrix to Provide Increased Oversight of the Alkali-Silica Reaction Issue at Seabrook ML12236A3852012-08-23023 August 2012 Memo Summary of NextEra Energy Seabrook Drop in Visit and Slides, August 22, 2012 ML12222A0392012-08-0909 August 2012 8/16/2012 Cancellation Notice of Forthcoming Conference Call with NextEra Energy and Florida Power and Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Proto ML12213A0612012-08-0101 August 2012 8/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol ML12164A9012012-06-22022 June 2012 Summary of Telephone Conference Call Held on 5/24/12, Between the NRC and NextEra Energy Seabrook, LLC Concerning the Drai Pertaining to the Seabrook Station LRA ML13196A2202012-06-0606 June 2012 Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities Related to the National Marine Fisheries Service'S Final Rule to List the Atlantic Sturgeon ML12174A0152012-06-0404 June 2012 Draft Letter from J. Clifford, Region I to R. Nelson, NRR; Subject: Request for Technical Assistance, Seabrook Station Alkali-Silica Reaction ML12174A0122012-06-0404 June 2012 Draft Letter from J. Clifford, Region I to R. Nelson, NRR; Subject: Request for Technical Assistance, Seabrook Station Alkali-Silica Reaction ML12173A4632012-06-0404 June 2012 Draft Letter from D. Roberts, Region I to R. Nelson, NRR; Subject: Request for Technical Assistance, Seabrook Station Alkali-Silica Reaction ML12174A0172012-06-0404 June 2012 Draft Letter from J. Clifford, Region I to R. Nelson, NRR; Subject: Request for Technical Assistance, Seabrook Station Alkali-Silica Reaction ML12173A4622012-06-0404 June 2012 Draft Letter from D. Roberts, Region I to J. Jolicoeur, NRR; Subject: Request for Technical Assistance, Seabrook Station Alkali-Silica Reaction ML1208600492012-03-23023 March 2012 Corrected Notice of Forthcoming Meeting with NextEra Energy Seabrook, LLC (NextEra) Regarding Seabrook Station Concrete Degradation ML12054A7312012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 3 ML12054A7292012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 5 ML12054A7282012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 5 ML12054A7272012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 4 ML12054A7042012-02-16016 February 2012 DRAFT- from Darrell Roberts to John Jolicoeur Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 2 ML12054A7112012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 6 ML12054A7122012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 7 (2) ML12054A7142012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 8 Comment ML12054A7132012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 8 2010817 ML12054A7302012-02-16016 February 2012 DRAFT- from James Clifford to Robert Nelson Request for Technical Assistance Seabrook Station ALKALI-SILICA Reaction, Draft 3. Resolved ML11354A1182011-12-22022 December 2011 12/8/2011 Summary of Meeting Between NRC Staff and the Nuclear Energy Institute to Discuss Current License Renewal Topics ML11343A4482011-12-0909 December 2011 NextEra Drop in Meeting Summary and Slides from 11-14-2011 Meeting with Region-I ML11327A0722011-11-30030 November 2011 Summary of Telephone Conference Call Held on November 22, 2011, Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook, LLC, Concerning the Response to the Request for Additional Information Pertaining to the Seabrook St ML11304A1662011-11-0404 November 2011 Summary of Tele Conf Call Held on 3/3/11, Between the USNRC and NextEra Energy Seabrook, Llc. Concerning Clarification of Information Pertaining to the Seabrook Station Request for Additional Information Responses ML11304A1512011-11-0404 November 2011 Summary of Tele Conf Call Held on 4/8/11 Between USNRC and NextEra Energy Seabrook, Llc. Concerning Clarification of Information Pertaining to the Seabrook Station Request for Additional Information Responses ML11304A1092011-11-0404 November 2011 Summary of Tele Conf Call Held on 5/31/11, Between the USNRC and Nextera Energy Seabrook, Llc., Concerning Clarification of Information Pertaining to the Seabrook LRA ML11277A0462011-10-26026 October 2011 Summary of Public Meetings Conducted to Discuss the Dseis Related to the Review of the Seabrook Station License Renewal Application ML11280A0452011-10-17017 October 2011 Summary of Telephone Conference Call Held on May 5, 2011, Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook, LLC, Concerning Clarification of Information Pertaining to the Seabrook Station LRA 2023-02-22
[Table view] |
Text
March 1, 2004 MEMORANDUM TO: Darrell J. Roberts, Acting Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Lee A. Licata, Project Manager, Section 2 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
SEABROOK STATION, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MC1097)
The attached draft request for information (RAI) was transmitted on March 1, 2004, to Mr.
Michael OKeefe of FPL Energy, LLC(the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by NRR and to support a conference call with the licensee to discuss the RAI.
This RAI is related to the licensees amendment request for Seabrook Station (Seabrook) dated October 6, 2003 The proposed amendment would revise Seabrooks Technical Specifications for full implementation of an alternate source term.
Review of the RAI would allow the licensee to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.
Docket No. 50-443
Attachment:
Draft RAI
March 1, 2004 MEMORANDUM TO: Darrell J. Roberts, Acting Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Lee A. Licata, Project Manager, Section 2 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
SEABROOK STATION, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MC1097)
The attached draft request for information (RAI) was transmitted on March 1, 2004, to Mr.
Michael OKeefe of FPL Energy, LLC(the licensee). This draft RAI was transmitted to facilitate the technical review being conducted by NRR and to support a conference call with the licensee to discuss the RAI.
This RAI is related to the licensees amendment request for Seabrook Station (Seabrook) dated October 6, 2003 The proposed amendment would revise Seabrooks Technical Specifications for full implementation of an alternate source term.
Review of the RAI would allow the licensee to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.
Docket No. 50-443
Attachment:
Draft RAI DISTRIBUTION PUBLIC DRoberts LBrown RDenning PDI-2 Reading LLicata VNerses ACCESSION NO.: ML040611043 OFFICE PDI-2/PM PD1-2/PM SPSB-C/SC NAME LLicata VNerses RDenning (Concurrence received via email DATE 03/01/2004 03/01/04 1 March 2004 OFFICIAL RECORD COPY
DRAFT REQUEST FOR ADDITIONAL INFORMATION RELATED TO ALTERNATE SOURCE TERM AMENDMENT REQUEST SEABROOK STATION DOCKET NO. 50-443 By letter dated October 6, 2003, FPL Energy Seabrook, LLC (Seabrook or the licensee) submitted an amendment request for Seabrook. The proposed amendment would revise Seabrooks Technical Specifications for full implementation of an alternate source term (AST).
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee provided that supports the proposed amendment and requests the following additional information to clarify the submittal:
- 1. Provide the 1998 through 2002 hourly meteorological data used in the ARCON96 calculations and joint wind speed, wind direction and atmospheric stability distributions (jfd) used in the PAVAN calculations. If these data have already been provided on the docket, please cite an appropriate reference. Please specify if the jfd data are formatted as discussed on page 14 of Enclosure 2 to NYN-03061 (Enclosure 2) provided by letter dated October 6, 2003 or if they are the reformatted data input to the PAVAN calculations.
- 2. Page 15 of Enclosure 2 states that the exit velocity from the MSSVs is greater than the 95 percentile wind speed for the first 21/2 hours of the events during which a release is postulated to occur. What are the estimated exit velocities, flow rates, and pressures as a function of time for the MSSVs and ARVs during this interval? What is the basis for the estimates? The 95 percentile wind speeds are estimated to be 16.72 and 16.81 miles per hour. How were these values estimated?
3 With regard to the ARCON96 relative concentration (X/Q) estimates provided in Table 1.8.1-2 of Enclosure 2, were all of the calculations based upon the same assumptions, other than 1) the differences noted in Table 1.8.1-1, 2) reduction by a factor of two when either the east or west intake was the postulated receptor location, or 3) when the diesel building intakes were the assumed receptors and the X/Q value is a weighted average of the two intakes? In the third case, are the input values given in Table 1.8.1-1 for the more limiting intake and inputs for the less limiting intake not provided? Are the inflow rates assumed to be equal? Were any releases assumed to be diffuse or to have a vent flow? If so, what were the inputs? Are values provided in Table 1.8.1-2 applicable to loss of offsite power and single failure scenarios?
ATTACHMENT