ML040570071
| ML040570071 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/13/2004 |
| From: | Jones T Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-2004-039 | |
| Download: ML040570071 (3) | |
Text
--
e FPL FEB 13 ZZZ4 L-2004-039 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - January 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the January 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, Terry ones Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
an FPL Group company
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-250 Turkey Point Unit 3 02/02/2004 Linda Tudor (305) 246-6408 Reporting Period January, 2004 OPERATING DATA REPORT Deslan Electrical Ratina (MWe-Net) 1 720 1 -
Maximum Dependable Capacity (MWe-Net) 693
__.rni Month Year-to-date Cumulative No. of hours reactor was critical 744 744 203277.2 No. of hours generator was on line (service hours) 744 744 200884.5 Unit reserve shutdown hours 0
0 121.8 Net Electrical Energy (MWH) 541058 541058 131345703 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G -Operational Error (Explain)
H -Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
Summary Of Monthly Operatinp Experience Unit 3 operated at essentially 100% power for the month of January 2004.
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-251 Turkey Point Unit 4 02/02/04 Linda Tudor (305) 246-6408 Reporting Period January, 2004 Design Electrical Rating (MWe-Net) 720 i
Maximum Dependable Capacity (MWe-Net) 693
-;;A.;
Month Year-to-date Cumulative No. of hours reactor was critical 744 744 200163.8 No. of hours generator was on line (service hours) 744 744 195722.4 Unit reserve shutdown hours 0
0 577.2 Net Electrical Energy (MWH) 541279 541279 129062847 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other I - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
Summarv Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of January 2004.