ML040570071

From kanterella
Jump to navigation Jump to search
January 2004 Monthly Operating Report for Turkey Point, Units 3 and 4
ML040570071
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/13/2004
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2004-039
Download: ML040570071 (3)


Text

--

e FPL FEB 13 ZZZ4 L-2004-039 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - January 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the January 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry ones Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-250 Turkey Point Unit 3 02/02/2004 Linda Tudor (305) 246-6408 Reporting Period January, 2004 OPERATING DATA REPORT Deslan Electrical Ratina (MWe-Net) 1 720 1 -

Maximum Dependable Capacity (MWe-Net) 693

__.rni Month Year-to-date Cumulative No. of hours reactor was critical 744 744 203277.2 No. of hours generator was on line (service hours) 744 744 200884.5 Unit reserve shutdown hours 0

0 121.8 Net Electrical Energy (MWH) 541058 541058 131345703 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G -Operational Error (Explain)

H -Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summary Of Monthly Operatinp Experience Unit 3 operated at essentially 100% power for the month of January 2004.

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-251 Turkey Point Unit 4 02/02/04 Linda Tudor (305) 246-6408 Reporting Period January, 2004 Design Electrical Rating (MWe-Net) 720 i

Maximum Dependable Capacity (MWe-Net) 693

-;;A.;

Month Year-to-date Cumulative No. of hours reactor was critical 744 744 200163.8 No. of hours generator was on line (service hours) 744 744 195722.4 Unit reserve shutdown hours 0

0 577.2 Net Electrical Energy (MWH) 541279 541279 129062847 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other I - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summarv Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of January 2004.