= En tergy Entergy Nuclear Vermont Yankee, LLC Entergy Nuclear Operations, Inc.
185 Old Ferry Road Brattleboro, VT 05302-0500 February 18, 2004 BVY 04-20 U.S. Nuclear Regulatory Commission A1TN: Document Control Desk Washington, DC 20555
Subject:
Vermont Yankee Nuclear Powrer Station License No. DPR-28 (Docket No. 50-271)
Suppliemiit to Fourth-Interval Inservice Inspection (ISI) Program Plan -
Withdrawal of Relier Rcquest PT-I On April 1, 2003, Vermont Yankee Nuclear Power Station (VY) submitted to the NRC a revised Inservice Inspection (ISI) Program' as required by I0CFR50.55a(a)(3)(i).
The subject submittal contained a number of relief requests for NRC review and approval. One of those relief requests, "PT-I" regarding the use of a system leakage test in lieu of the Class 3 'Interval' hydrostatic test, requested an alternative similar to Code Case N-498-1. Subsequent to that submittal, the NRC isstied Revision 13 to Regulatory Guide 1.1472 which identified that Code Case N-498-4 had been conditionally accepted for use. VY has reviewed Code Case N-498-4 and the conditions placed upon its acceptability and has determined that tile use of this code case is acceptable. Accordingly, VY hereby withdrawals Relief Request PT-I and will adopt tile conditionally approved Code Case N-498-4 into our Pressure Test program.
The attachment identifies that there are no commitments contained within this letter.
If you have any questions on this transmittal, please contact Mr. Thomas B. Silko at (802) 258-4146.
Sincerely, Robert J. Wardzin Director, NucIV/Saf
,1e Attachment cc:
USNRC Region I Administrator USNRC Resident Inspector - VY USNRC Project Manager - VY Vermont Department of Public Service I Reference VY Letter to USNRC, BVY 03-28, "Fourth-lnterval Inservice Inspection Program Plan and Fourth-Intcrval Inservice Inspection Pressure Test Program and Request for Approval of ISI Relief Requests," dated April 1, 2003.
2 Reference USNRC Regulatory Guide 1.147, Revision 13, "Inservice Inspection Code Case Acceptability, ASME Section Xl, Division I," dated June 2003.
ADQ7
Docket No. 50-271 BVY 04-20 Attachment I Vermont Yankee Nuclear Power Station Supplement to Fourth-Interval Inservice Inspection (ISI) Program Plan -
Withdrawal of Relief Request PT-I List of Commitments
SUMMARY
OF VERMONT YANKEE COMMITMENTS BVVY NO.: 04-20 The following table identifies commitments made in this document by Vermont Yankee. Any other actions discussed in the submittal represent intended or planned actions by Vermont Yankee. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Licensing Manager of any questions regarding this document or any associated commitments.
COMMITMENT l
COMMITTED DATE I
OR "OUTAGE" None I
N/A 4
+
4 4
4