Request for Approval to Use a Later OM Code for Inservice Testing of Pressure Relief Devices
ML040550404
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/16/2004
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-04-018
Download: ML040550404 (4)


Text

M liKewaunee Nuclear Power Plant Committed to NucearExcellenceP Operated by Nuclear Management Company, LLC February 16, 2004 NRC-04-018 1 OCFR50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 Request For Approval To Use A Later OM Code For Inservice Testing Of Pressure Relief Devices The Federal Register, Vol. 67, No. 187 dated Thursday, September 26, 2002 incorporates by reference the 1997 Addenda, 1998 Edition through 2000 Addenda of the ASME Code for Operation and Maintenance of Nuclear Power Plants (OM Code) for Inservice Testing (IST) programs. Currently the Kewaunee Nuclear Power Plant is committed to the 1989 Edition of the ASME Section Xl Code that invokes the 1987 Edition and 1988 Addenda of the OM Code.

The NMC requests approval for the Kewaunee Nuclear Power Plant, pursuant to 10 CFR 50.55a(f)(4)(iv), to use the later edition and addenda of the OM Code that has been approved for use by the NRC for pressure relief devices subject to IST requirements for the remainder of the third 10-year IST interval. Mandatory Appendix I, Inservice Testing of Pressure Relief Devices in Light-Water Reactor Nuclear Power Plants, of the later edition and addenda of the OM Code, contains the requirements for IST of pressure relief devices. The Kewaunee Nuclear Power Plant will use all related requirements of the respective edition and addenda in Mandatory Appendix I as required by 10 CFR 50.55a(f)(4)(iv) for the use of subsequent editions and addenda of the OM Code. presents this request in accordance with template 3 of the September 30, 2002 NEI White Paper, "Standard Format For Requests From Commercial Reactor Licensees Pursuant to 10 CFR 50.55a."

N4901Highway42

  • Kewaunee,Wisconsin54216-9511 W

I Telephone: 920.388.2560

Document Control Desk Page 2 If there are any questions or if additional information is required, please contact Gerald Riste at (920) 388-8424 or Tim Smith at (920) 388-8660.

Thomas Coutu Site Vice-President - Kewaunee Nuclear Power Plant Nuclear Management Company, LLC TMS cc-Administrator, Region Ill, USNRC Project Manager, Kewaunee Nuclear Power Plant, USNRC Senior Resident Inspector, Kewaunee Nuclear Power Plant, USNRC Electric Division, PSCW Enclosure

1)

Proposed Use of Subsequent ASME Code Edition and Addenda In Accordance with 10 CFR 50.55a(f)(4)(iv)

ENCLOSURE 1 NUCLEAR MANAGEMENT COMPANY, LLC KEWAUNEE NUCLEAR PLANT DOCKET 50-305 February 16, 2004 Letter from Thomas Coutu (NMC)

To Document Control Desk (NRC)

Proposed Use of Subsequent ASME Code Edition and Addenda In Accordance with 10 CFR 50.55a(f)(4)(iv) 1 Page Follows

Proposed Use of Subsequent ASME Code Edition and Addenda In Accordance with 10 CFR 50.55a(f)(4)(iv) at Kewaunee Nuclear Power Plant

1.

ASME Code Component(s) Affected Pressure relief devices subject to Inservice Testing (IST) requirements.

2.

Applicable Code Edition and Addenda

1989 Edition of the ASME Section Xl Code ASME OMa-1 988 Part 10 Inservice Testing of Valves in Light-Water Reactor Power Plants ASME OM-1 987, Part 1 Requirements for Inservice Performance Testing of Nuclear Power Plant Pressure Relief Devices

3.

Proposed Subsequent Code Edition and Addenda 1998 Edition through 2000 Addenda of the ASME Code for Operation and Maintenance of Nuclear Power Plants (OM Code), Appendix I, Inservice Testing of Pressure Relief Devices in Light-Water Reactor Nuclear Power Plants.

The Federal Register, Vol. 67, No. 187 dated Thursday, September 26, 2002 (67 FR 60520) incorporates by reference the 1997 Addenda, 1998 Edition through 2000 Addenda of the ASME Code for Operation and Maintenance of Nuclear Power Plants (OM Code) for Inservice Testing (IST) programs.

Mandatory Appendix I will be applied to all pressure relief devices subject to Inservice Testing (IST) requirements.

4.

Related Requirements There are no modifications or limitations listed in 10 CFR 50.55a(b) that apply to the use of Mandatory Appendix I. Review of the Federal Register 67 FR 60520 through 67 FR 60542 did not identify any pertinent information related to pressure relief devices or Mandatory Appendix I.

5.

Duration of Proposed Request The NMC requests approval for the Kewaunee Nuclear Power Plant, pursuant to 10 CFR 50.55a(f)(4)(iv), to use the later edition and addenda of the OM Code that has been approved for use by the NRC for pressure relief devices subject to IST requirements for the remainder of the third 10-year IST interval.