. Exe I; n.M Exelon Generation Company, LLC LaSalle County Station 2601 North 21 Road Marseilles, IL 61341-9757 www.exeloncorp.com Nuclear February 13, 2004 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374
Subject:
Monthly Operating Report for January 2004 Enclosed is the Exelon Generation Company (EGC), LLC, Monthly Operating Report for LaSalle County Station covering the period from January 1 through January 31, 2004. This report is submitted in accordance with Technical Specification 5.6.4.
Should you have any questions concerning this letter, please contact Mr. Glen T. Kaegi, Regulatory Assurance Manager, at (815) 415-2800.
Respectfully, Glen T. Kaegi Regulatory Assurance Manager LaSalle County Station Enclosure cc:
Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - LaSalle County Station
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-373 I
.4 LdQdII
I February 05. 2004 Stevie DuPont (815) 415-2197 REPORTING PERIOD:
January 2004 1.
2.
Design Electrical Rating Maximum Dependable Capacity (MWe-Net)
jj00 1111 00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 291.38 288.03 0.00 315,540.00 Yr-to-Date 291.38 288.03 0.00 315,540.00 Cumulative 124,667.34 122,421.38 1.00 123.597,734.0.
UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date 5: Scheduled (Hours)
Reason I Down 2 Comments LIRIO 01/13/2004 S
455.98 C
I Scheduled Refueling Outage
SUMMARY
- Unit I started the month of January in Coastdown. Shutdown was commenced on January 12 for a scheduled refueling outage (LIRIO). The main generator output breaker was opened on January13 and the unit was taken off-line. The unit was shutdown for the remainder of the month of January. The unit is expected to startup on February 7.2004.
I 2
- Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:..
I Manual 2
Manual Trip/Scram 3
AutomatIc Trip/Scram 4
Continuation 5
Other (Explain)
UNIQUE REPORTING REQUIREMENTS FOR UNIT ONE
- 1. Challenges other than routine surveillance testing to Safety/Relief Valve Operations - None.
Page 1 of 2
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-374 LaSalle 2 February 05, 2004 Stevie DuPont (815) 415-2197 January2004 1.
2.
Design Electrical Rating Maximum Dependable Capacity (MWe-Net) jjj00 1111 00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 858,325.00 Yr-to-Date 744.00 744.00 0.00 858,325.00 Cumulative 116,667.26 115,536.93 0.00 117,892,817.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date 5: Scheduled (Hours)
Reason I Down 2 Comments
SUMMARY
- Unit 2 operated at full power during the month of January without exception.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manuai
- 2 Manual TriplScram 3
AutomatIc TrlplScram 4
Continuation 5
Other (Explain)
UNIQUE REPORTING REQUIREMENTS FOR UNIT rwo
- 1. Challenges other than routine surveillance testing to Safety/Relief Valve Operations'- None.
Page 2 of 2