Request for Additional Information - Third 10-Year Inservice Inspection Interval Program Plan Snubber Testing Program
ML040510313
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/20/2004
From: Richard Guzman
NRC/NRR/DLPM/LPD1
To: Shriver B
Susquehanna
Guzman R, NRR/DLPM 415-1030
References
TAC MC1185, TAC MC1186
Download: ML040510313 (6)


Text

February 20, 2004 Mr. Bryce L. Shriver Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard, NUCSB3 Berwick, PA 18603-0467

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) - SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (SSES 1 AND 2) - THIRD 10-YEAR INSERVICE INSPECTION INTERVAL PROGRAM PLAN RE: SNUBBER TESTING PROGRAM (TAC NOS. MC1185 AND MC1186)

Dear Mr. Shriver:

In reviewing your submittal of September 16, 2003, relating to Relief Request No. 3RR-03, the U.S. Nuclear Regulatory Commission staff has determined that additional information described in the enclosure to this letter is needed to complete its review. These questions were discussed with your staff during a teleconference on February 4, 2004. As agreed to by your staff, we request you respond by April 30, 2004.

If you have any questions, please contact me at 301-415-1030.

Sincerely,

/RA/

Richard V. Guzman, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

RAI cc w/encl: See next page

February 20, 2004 Mr. Bryce L. Shriver Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard, NUCSB3 Berwick, PA 18603-0467

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION (RAI) - SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (SSES 1 AND 2) - THIRD 10-YEAR INSERVICE INSPECTION INTERVAL PROGRAM PLAN RE: SNUBBER TESTING PROGRAM (TAC NOS. MC1185 AND MC1186)

Dear Mr. Shriver:

In reviewing your submittal of September 16, 2003, relating to Relief Request No. 3RR-03, the U.S. Nuclear Regulatory Commission staff has determined that additional information described in the enclosure to this letter is needed to complete its review. These questions were discussed with your staff during a teleconference on February 4, 2004. As agreed to by your staff, we request you respond by April 30, 2004.

If you have any questions, please contact me at 301-415-1030.

Sincerely,

/RA/

Richard V. Guzman, Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosure:

RAI cc w/encl: See next page DISTRIBUTION:

Public OGC CBixler, Rgn-1 DTerao RGuzman PDI-1 R/F RLaufer MOBrien ALee ACRS BPham Accession Number: ML040510313

  • See previous concurrence OFFICE PDI-1/PM PDI-2/LA EMEB/SC*

PDI-1/SC NAME RGuzman MOBrien DTerao PTam for RLaufer DATE 2/19/04 2/19/04 2/17/04 2/19/04 OFFICIAL RECORD COPY

Enclosure REQUEST FOR ADDITIONAL INFORMATION RELATING TO RELIEF REQUEST NO. 3RR-03 OF THE THIRD 10-YEAR INSERVICE INSPECTION INTERVAL PROGRAM PLAN FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 DOCKET NOS. 50-387 AND 50-388 1.

In Relief Request No. 3RR-03, the licensee, PPL Susquehanna, LLC (PPL), presented the American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code requirements (ASME Code) in the 1989 Edition,Section XI, Paragraphs IWF-5200(a) and IWF-5300(a), IWF-5200(b) and IWF-5300(b), and IWF-5200(c) and IWF-5300(c), for snubber visual examination, functional testing, and attachments, respectively. Under the Basis for Relief section of their September 16, 2003, submittal, PPL states that the Technical Requirments Manual (TRM) snubber program maintains the same confidence level of quality and safety as that of OMa-1988, Part 4, for the visual examination, functional testing, and the examination of snubber attachments (including lugs, bolting, pins, and clamps). However, PPL does not provide an adequate basis for this statement.

a.

Discuss how the TRM snubber program maintains the required confidence level for the snubber surveillance activities.

b.

For snubber attachments, identify each specific ASME Code requirement in Subsection IWF for which the relief applies, and provide the basis on which to conclude that the TRM program will be able to meet the intent of such requirements.

2.

Under the Proposed Alternate Examination section of the submittal, PPL states, it should be noted that snubber welded attachments will be performed in accordance with the ASME Section XI Subsections IWB, IWC, and IWD welded attachment examination requirements. This sentence is not clear.

a.

Clarify the intent of this statement. Will the inservice inspection of snubber welded attachments be performed in accordance with ASME Code,Section XI, Subsection IWB, IWC, and IWD? Present adequate information to support your proposed alternative.

b.

Provide a detailed explanation of how Subsection IWB, IWC, and IWD requirements are related to the acceptability of the TRM program, as an alternative examination requirement for snubber attachments.

3.

The staff has determined that the following areas of the TRM Bases are needed to complete the review of proposed Relief Request 3RR-03.

a.

TRM Bases page TRM/B-3.7-25 states that potentially damaging transients are determined from a review of operational data and a visual inspection of the system (Condition D), but does not specify the technical requirement surveillance (TRS) inspection requirements after the determination of a potentially damaging transient. Please provide a detailed description and basis with regard to how and when you will perform inspections of all snubbers attached to sections of systems that experience these transients. (e.g. if applicable, provide your commitment to perform these inspections in your response letter).

b.

Provide a detailed discussion of the functional testing requirements of snubbers, including the number of representative samples of snubbers required to be tested, and the condition under which a successful testing program can be achieved.

Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:

Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Aloysius J. Wrape, III General Manager - Nuclear Assurance PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Terry L. Harpster General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Robert A. Saccone General Manager - Nuclear Engineering PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Walter E. Morrissey Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Crowthers Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Dale F. Roth Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Herbert D. Woodeshick Special Office of the President PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq Assoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Supervisor - Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Richard W. Osborne Allegheny Electric Cooperative, Inc.

212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266 Director - Bureau of Radiation Protection Pennsylvania Department of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:

Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803