January 2004 Monthly Operating Report for St. Lucie, Units 1 and 2
ML040490567
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/10/2004
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2004-042
Download: ML040490567 (3)


Text

0 F=PL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 February 10, 2004 I,

L-2004-042 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the January 2004 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Ver William effers, Vice President St. Lucie Plant Jr.

WJ/KWF Attachment I 6q' an FPL Group company

L-2004-042 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-335 St. Lucie I February 09, 2004 W. D. Mead, Jr.

(772) 467-7293

. January 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 638,464.00 Yr-to-Date Cumulative 744.00 194,288.00 744.00 192,454.30 0.00 0.00 638,464.00 157,739,411.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason I Down 2 Comments

SUMMARY

Unit I operated at essentially full power through the entire month of January. In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the Power Operated Relief Valves (PORV) or the safety valves during the report period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

S L-2004-042 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-389 St. Lucie 2 February 09. 2004 W. D. Mead, Jr.

(772) 467-7293 January 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 633,100.00 Yr-to-Date 744.00 744.00 0.00 633,100.00 Cumulative 156,780.57 154,866.47 0.00 127,680,076.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Reason Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Down 2 Comments

SUMMARY

Unit 2 operated at essentially full power through the entire month of January. In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the Power Operated Relief Valves (PORV) or the safety valves during the report period.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)