- e. 'C Exelon Nuclear Telephone 717.456.7014 N1lea Peach Bottom Atomic Power Station www.exeloncorp.com Nuc a 1848 Lay Road Delta, PA 17314-9032 February 5, 2004 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278
Subject:
Monthly Operating Report for January 2004 In accordance with Technical Specifications, Section 5.6.4, "Monthly Operating Reports," we are submitting this Monthly Operating Report for Peach Bottom Atomic Power Station, Units 2 and 3.
Additionally Peach Bottom has implemented the relaxation designated in NRC Generic Letter 97-02, "Revised Contents of the. Monthly Operating Report," which allowed a reduction in information that was being submitted in the Monthly Operating Report. These changes are and will be reflected in this and future reports.
Should you have any questions concerning this letter, please contact Mr. Chester Lewis at (717) 456-3245.
Respectfully,
(~J hn A. Stone I lant Manager each Bottom Atomic Power Station JAS/GLSIPRR/CSL:cmg Enclosures cc:
H. J. Miller, Administrator, Region I, USNRC C. Smith, USNRC, Senior Resident Inspector, PBAPS ccn 04-14010 E
I. INTRODUCTION Peach Bottom Atomic Power Station is composed of two Boiling Water Reactors and Steam Turbine/Generators located in Delta, Pennsylvania. Unit Two and Unit Three both have a Maximum Dependable Capacity of 1112 MWe Net. The Station is jointly owned by Exelon Nuclear and Public Service Electric and Gas. The Nuclear Steam Supply Systems are General Electric Company Boiling Water Reactors. The Architect/Engineer and Primary Construction Contractor was Bechtel Corporation. The Susquehanna River is the condenser cooling water source. The plant is subject to license numbers DPR-44 and DPR-56, issued October 25, 1973, and July 2, 1974, for Unit Two and Unit Three respectively, pursuant to Docket Numbers 50-277 and 50-278. The dates of initial Reactor criticality for Units Two and Three were September 16, 1973, and August 7, 1974, respectively. Commercial generation of power began on February 18, 1974, for Unit Two, and September 1, 1974, for Unit Three.
II.
SUMMARY
OF OPERATING EXPERIENCE A. Unit TWO Unit 2 began the month of January at 100% of maximum allowable power (3496 MWth).
At 0051 on January 17th, Unit 2 reduced power to 79%, due to an accumulation of ice at the outer intake structure. The Unit returned to maximum allowable CTP (3496 MWth) by 1220 on January 17th Unit 2 ended the month of January at 100% of maximum allowable power (3496 MWth).
B. Unit THREE Unit 3 began the month of January at 100% power.
At 2102 on January 11h, Unit 3 reduced load by 5 MWe, due to problems with the 3D Monicore computer. Following resolution of the problems, the Unit returned to full power by 2300 on January 1 1 th i ith.~~~~~~t At 0051 on January 17th, Unit 3 reduced power to 85%, due to an accumulation of ice at the outer intake structure. The Unit returned to 100% power by 0922 on January 17th.
At 2352 on January 2 9th, Unit 3 reduced power i 9% for planned testing of the turbine stop valves.
The Unit returned to full power by 0407 on Janua \\30'h.
Unit 3 ended the month of January at 100% power.
III. OPERATING DATA STATISTICS A. Peach Bottom Unit TWO Operating Data Report for January 2004 DOCKET NO.:
DATE:
COMPLETED BY:
TELEPHONE:
50-277 February 2, 2004 Chip Lewis (717) 456-3245 OPERATING STATUS REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD:
CURRENTLY AUTHORIZED POWER LEVEL (MWth):
- 1.
DESIGN ELECTRICAL RATING (MWe-Net):
- 2.
MAX. DEPENDABLE CAPACITY (MWe-Net):
January 2004 744 3496 1138 1112 UNIT 2 OPERATING STATUS PARAMETER
- 3.
NUMBER OF HOURS THE REACTOR WAS CRITICAL
- 4.
HOURS GENERATOR ON-LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY GENERATED THIS MONTH 744 744 0
YTD 744 744 0
CUMULATIVE 190,510.5
- 186,057.9 0.
851,218.5 851,218.5 184,002,756.6
III. OPERATING DATA STATISTICS B. Peach Bottom Unit THREE Operating Data Report for January 2004 DOCKET NO.:
DATE:
COMPLETED BY:
TELEPHONE:
50-278 February 2, 2004 Chip Lewis (717) 456-3245 OPERATING STATUS REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD:
- CURRENTLY AUTHORIZED POWER LEVEL (MWth):
- 1.
DESIGN ELECTRICAL RATING (MWe-Net):
- 2.
MAX. DEPENDABLE CAPACITY (MWe-Net):
January 2004 744 3496 1138 1112 UNIT 3 OPERATING STATUS PARAMETER
- 3.
NUMBER OF HOURS THE REACTOR WAS CRITICAL
- 4.
HOURS GENERATOR ON-LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY GENERATED THIS MONTH YTD 744 744 744 744 CUMULATIVE 189,014.4 185,069.0 0
0 0
852,575.5 852,575.5.
181,906,340.6
IV. OPERATING DATA STATISTICS A. Unit TWO Shutdowns for January 2004 No. for Year Date Type (1)
Duration (Hours)
Reason (2
Method of
- Shutting Down (3)
Corrective Actions/Comments No Unit TWO shutdoivns for January 2004 B. Unit THREE Shutdowns for January 2004 No. for Year Type Date (1)
Duration (Hours)
Reason (2)
Method of Shutting Down (3)
Corrective Actions/Comments No Unit THREE shutdownsfor January 2004 Legend (1) Type:
F - Forced S -Scheduled (2) Reason:
A. - Equipment Failure (Explain)
B. - Maintenance or Test C. - Refueling D. - Regulatory Restriction E. - Operator Training/License Examination F. - Administrative G. - Operational Error (Explain)
H. - Other (Explain)
(3) Method of Shutting Down:
- 1. - Manual
- 2. - Manual Trip/Scram
- 3. - Automatic Trip/Scram 4.- Continuation
- 5. - Other (Explain)