January 2004 Monthly Operating Report for Wolf Creek Generating Station
ML040490541
Person / Time
Site: Wolf Creek 
(NPF-042)
Issue date: 02/11/2004
From: Moles K
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, RA 04-0023
Download: ML040490541 (3)


Text

WOLF CeREEK

  • NUCLEAR OPERATING CORPORATION Kevin J. Moles Manager Regulatory Affairs FEB 1 1204 RA 04-0023 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Docket No. 50-482: January 2004 Monthly Operating Report Gentlemen:

Attached to this letter is the January 2004, Monthly Operating Report for the Wolf Creek Generating Station. This submittal is being made in accordance with the requirements of Wolf Creek Generating Station Technical Specification 5.6.4, 'Monthly Operating Reports." This submittal also follows the guidance of Generic Letter 97-02, "Revised Contents of the Monthly Operating Report." If you have any questions regarding this report, please contact me at (620) 364-4126, or Ms. Jennifer Yunk at (620) 364-4272.

Very truly your KJM/rlginJ.

KJM/rIg Attachment cc:

J. N. Donohew (NRC), w/a D. N. Graves (NRC), w/a B. S. Mallett (NRC), w/a Senior Resident Inspector (NRC), w/a P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/FIHCNVET

Attachment to RA 04-0023 Page 1 of 2 OPERATING DATA REPORT Report Number: 227 DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-482 Wolf Creek Generating Station February 11, 2004 J. L. Yunk (620) 364-4272 REPORT MONTH: January 2004 I 1. I Design Electrical Rating (MWe - Net):

l 1170

2. 1 Maximum Dependable Capacity (MWe - Net):

1166 This Month Year to Date Cumulative

3.

Number of Hours Reactor Critical:

744.00 744.00 138,520.67

4.

Number of Hours Generator On-Line:

744.00 744.00 137,285.85

5.

Unit Reserve Shutdown Hours:

0.00 0.00 339.80

6.

Net Electrical Energy Generated (MWH) 883,896.00 883,896.00 155,852,267.00 Wolf Creek Generating Station Monthly Operating Report January 2004 Page 1 of 2

-.07.

Attachment to RA 04-0023 Page 2 of 2 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-482 Wolf Creek Generating Station February 11, 2004 J. L. Yunk (620) 364-4272 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS/COMMENTS No.

Date S: SCHEDULED (Hours)

(1)

(2)

NA NA i

NA NA NA NA NA

SUMMARY

The plant operated at or near 100% power from January 1, 2004 through January 31, 2004.

(1) REASON:

A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINTENANCE OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

(2) METHOD: 1. MANUAL

2. MANUAL SCRAM
3. AUTOMATIC SCRAM
4. CONTINUATION
5. OTHER Wolf Creek Generating Station Monthly Operating Report January 2004 Page 2 of 2