Text

'Entergy Entergy Nuclear Northeast Indian Point Energy Center 295 Broadway, Suite 1 PO. Box 249 Buchanan, NY 10511-0249 Tel 914 734 5340 Fax 914 734 5718 Fred Dacimo Vice President, Operations February 12, 2004 Indian Point, Unit Nos. 2 and 3 Docket Nos. 50-247 and 50-286 NL-04-017

[1 OCFR50.36]

Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-P1-17 Washington, DC 20555-0001

Subject:

Monthly Operating Report for January 2004

Reference:

1)

NRC Generic Letter 97-02, 'Revised Contents of the Monthly Operating Report," dated May 15, 1997

Dear Sir:

In accordance with Technical Specification 5.6.4, Entergy Nuclear Operations, Inc. (Entergy) hereby submits the Monthly Operating Report for the month of January 2004 for Indian Point Units 2 and 3. This submittal is in accordance with the new INPO Consolidated Data Entry (CDE) process, which uses the NRC Generic Letter 97-02 reduced data format (Reference 1).

There are no new commitments contained in this correspondence.

Should you or your staff have any questions regarding this matter, please contact Mr. Patric W. Conroy, Manager, Licensing, Indian Point Energy Center at (914) 734-6668.

Fred R. Dacimo Vice President, Operations Indian Point Energy Center

,5, ,

I Docket Nos. 50-247 and 50-286 NL-04-017 Page 2 of 2 Attachments cc:

Mr. Hubert J. Miller Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Patrick D. Milano, Project Manager Project Directorate I Division of Reactor Projects I U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555-0001 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 38 Buchanan, NY 10511-0038 Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Paul Eddy State of New York Public Service Commission 3 Empire Plaza Albany, NY 12223

OPERATING DATA REPORT NL-04-01 7 DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-247 Indian Point Unit 2 February 09, 2004 Tom Orlando (914) 736-8340 REPORTING PERIOD:

January 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 993.00 956.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 738,791.00 Yr-to-Date 744.00 744.00 0.00 738,791.00 Cumulative 183,910.48 179,914.95 0.00 152,889,077.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason I Down 2 Comments I

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

SUMMARY

Indian Point Unit No. 2 was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross electrical energy generation of 763,159 MWH.

Page 1 of 1

OPERATING DATA REPORT NL-04-01 7 DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-286 Indian Point Unit 3 February 09, 2004 Tom Orlando (914) 736-8340 REPORTING PERIOD:

January 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 979.00 979.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 742,700.00 Yr-to-Date 744.00 744.00 0.00 742,700.00 Cumulative 154,848.99 151,901.18 0.00 136,388,012.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason I Down 2 Comments 1

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

SUMMARY

Indian Point Unit No. 3 was synchronized to the grid for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross electrical energy generation of 765,885 MWH.