ML040480026

From kanterella
Jump to navigation Jump to search
Reactor and Senior Reactor Operator Initial Examinations North Anna Power Station - 50-338/2004-301 and 50-339/2004-301
ML040480026
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 02/12/2004
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
50-338/04-301, 50-339/04-301
Download: ML040480026 (5)


See also: IR 05000338/2004301

Text

February 12, 2004

Virginia Electric and Power Company

ATTN: Mr. David A. Christian

Senior Vice President and

Chief Nuclear Officer

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS

NORTH ANNA POWER STATION - 50-338/2004-301 AND 50-339/2004-301

Dear Mr. Christian:

In a telephone conversation on February 10, 2004, between Mr. Joe Scott, Supervisor of

Nuclear Training (Operations) and Mr. Edwin Lea, Senior Operations Engineer, arrangements

were made for the administration of licensing examinations at the North Anna Power Station,

Units 1 and 2 during the weeks of June 21 and June 28, 2004. The on-site preparatory week is

scheduled for the week of June 7, 2004.

As agreed during the telephone conversation, your staff will prepare the examination based on

the guidelines in Draft Revision 9 of NUREG-1021, "Operator Licensing Examination Standards

for Power Reactors." The NRC regional office will discuss with your staff any changes that

might be necessary before the examination is administered. Your staff will also provide copying

services for administering the exam.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by April 6, 2004. The written examinations, operating tests, and the supporting

reference materials identified in Attachment 2 of ES-201 will be due by May 7, 2004. Pursuant

to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the

outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready-to-use. Any delay in receiving the required

examination and reference materials, or the submittal of inadequate or incomplete materials,

may cause the examination to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

2

VEPCO

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0018, which expires on June 30, 2006. The

public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for

reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at

BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,

NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Joe Scott has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Edwin Lea at (404) 562-4567,

(Internet E-mail: exl2@nrc.gov ), or myself at (404) 562-4638, (Internet E-mail: mee@nrc.gov).

Sincerely,

/RA/

Michael E. Ernstes, Chief

Operator Licensing and

Human Performance Branch

Division of Reactor Safety

Docket Nos. 50-338, 50-339

License Nos. NPF-4, NPF-7

cc: (See page 3)

3

VEPCO

cc contd:

Chris L. Funderburk, Director

Nuclear Licensing and

Operations Support

Virginia Electric and Power Company

Electronic Mail Distribution

Jack M. Davis

Site Vice President

North Anna Power Station

Electronic Mail Distribution

Executive Vice President

Old Dominion Electric Cooperative

Electronic Mail Distribution

County Administrator

Louisa County

P. O. Box 160

Louisa, VA 23093

Lillian M. Cuoco, Esq.

Senior Counsel

Dominion Resources Services, Inc.

Electronic Mail Distribution

Attorney General

Supreme Court Building

900 East Main Street

Richmond, VA 23219

Mr. H. Ashley Royal

Manager Nuclear Training

North Anna Power Station

P. O. Box 402

Mineral, VA 23117

4

VEPCO

Distribution:

S. Monarque, NRR

C. Evans (Part 72 Only)

L. Slack, RII EICS

RIDSNRRDIPMLIPB

PUBLIC

OFFICE

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

/RA/

/RA/

/RA/

NAME

ELea:pmd

MErnstes

KLandis

DATE

2/12/04

2/12/04

2/12/04

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

PUBLIC DOCUMENT

YES

NO

OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML040480026.wpd