ML040430563

From kanterella
Jump to navigation Jump to search
January 2004 Monthly Operating Report for Brown Ferry Nuclear Plant
ML040430563
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/12/2004
From: Abney T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML040430563 (9)


Text

February 12, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN, P1-35 Washington, D.C. 20555-0001 Gentlemen:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - JANUARY 2004 MONTHLY OPERATING REPORT The enclosure provides the January 2004 Monthly Operating Report (MOR) as required by BFN Technical Specifications, Section 5.6.4.

If you have any questions concerning this report, please call me at (256) 729-2636.

Sincerely, Original signed by:

T. E. Abney Manager of Licensing and Industry Affairs Enclosure cc: See page 2

U.S. Nuclear Regulatory Commission Page 2 February 12, 2004 Enclosure cc (Enclosure):

(Via NRC Electronic Distribution)

Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9)

Office of Nuclear Reactor Regulation 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Regional Administrator U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 Atlanta, Georgia 30303-8931

U.S. Nuclear Regulatory Commission Page 3 February 12, 2004 JEW:BAB Enclosure cc (Enclosure):

D. K. Baker, BR 3H-C A. S. Bhatnagar, PAB 1E-BFN M. J. Burzynski, BR 4X-C J. E. Maddox, LP 6A-C R. F. Marks, PAB 1C-BFN D. C. Olcsvary, LP 6A-C J. R. Rupert, NAB 1A-BFN K. W. Singer, LP 6A-C M. D. Skaggs, POB 2C-BFN E. J. Vigluicci ET 11A-K NSRB Support, LP 5M-C EDMS-K S:lic/submit/subs/MOR January 03.doc

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

MONTHLY OPERATING REPORT JANUARY 2004 UNIT 1 DOCKET NUMBER 50-259 LICENSE NUMBER DPR-33 UNIT 2 DOCKET NUMBER 50-260 LICENSE NUMBER DPR-52 UNIT 3 DOCKET NUMBER 50-296 LICENSE NUMBER DPR-68

OPERATING DATA REPORT Docket No. 50-259 Unit Name BFN Unit 1 Date February 4, 2004 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2004

1. Design Electrical Rating (Net MWe): 1065
2. Maximum Dependable Capacity (MWe-Net) 0 Month Yr-to-Date Cumulative*
3. Number of Hours Reactor was Critical 0 0 59521
4. Hours Generator On-Line 0 0 58267
5. Unit Reserve Shutdown Hours 0 0 0
6. Net Electrical Energy Generated (MWh) 0 0 53,796,427
  • Excludes hours under Administration Hold (June 1, 1985 to Present)

OPERATING DATA REPORT Docket No. 50-260 Unit Name BFN Unit 2 Date February 4, 2004 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2004

1. Design Electrical Rating (Net MWe): 1120
2. Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
3. Number of Hours Reactor was Critical 744 744 157,078
4. Hours Generator On-Line 744 744 154,395
5. Unit Reserve Shutdown Hours 0 0 0
6. Net Electrical Energy Generated (MWh) 847,248 847,248 154,369,196 E-2

OPERATING DATA REPORT Docket No. 50-296 Unit Name BFN Unit 3 Date February 4, 2004 Completed By J. E. Wallace Telephone (256) 729-7874 Reporting Period January 2004

1. Design Electrical Rating (Net MWe): 1120
2. Maximum Dependable Capacity (MWe-Net) 1118 Month Yr-to-Date Cumulative
3. Number of Hours Reactor was Critical 744 744 114,468
4. Hours Generator On-Line 744 744 113,031
5. Unit Reserve Shutdown Hours 0 0 0
6. Net Electrical Energy Generated (MWh) 839,292 839,292 116,147,895 E-3

UNIT SHUTDOWNS REPORT MONTH: JANUARY 2004 DOCKET NO: 50-259 UNIT NAME: BFN-1 DATE: February 4, 2004 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No. Date Type Duration Reason1 Method of Cause and Corrective Action to Prevent Recurrence F: Forced (Hours) Shutting S: Scheduled Down Reactor2 1 06/01/85 S 744 F 4 Administrative hold to resolve various TVA and NRC concerns.

1 2 Reason: Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation Outage E-Operator Training / License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 1 has been on administrative hold since June 1, 1985.

E-4

UNIT SHUTDOWNS REPORT MONTH: JANUARY 2004 DOCKET NO: 50-260 UNIT NAME: BFN-2 DATE: February 4, 2004 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No. Date Type Duration Reason1 Method of Cause and Corrective Action to Prevent Recurrence F: Forced (Hours) Shutting S: Scheduled Down Reactor2 N/A 1 2 Reason: Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation Outage E-Operator Training / License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 2 has operated at or near 100 percent available power E-5

UNIT SHUTDOWNS REPORT MONTH: JANUARY 2004 DOCKET NO: 50-296 UNIT NAME: BFN-3 DATE: February 4, 2004 COMPLETED BY: J. E. Wallace TELEPHONE: (256) 729-7874 No. Date Type Duration Reason1 Method of Cause and Corrective Action to Prevent Recurrence F: Forced (Hours) Shutting S: Scheduled Down Reactor2 N/A 1 2 Reason: Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation Outage E-Operator Training / License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

Unit 3 has operated at or near 100 percent available power.

E-6