I r
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 Re: 10 CFR 2.202 January 29, 2004 10CFR 50.4 U.S. Nuclear Regulatory Commission Serial No.:
02-136D Attention: Document Control Desk NL&OS/MAE:
RO Washington, D.C. 20555-0001 Docket Nos.:
50-338 50-339 License Nos.:
NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS I AND 2 REVISION PROVIDED FOR THE ORDER FOR INTERIM SAFEGUARDS AND SECURITY COMPENSATORY MEASURES DATED FEBRUARY 25, 2002 On February 25, 2002, the Nuclear Regulatory Commission (NRC) issued an Order for Interim Safeguards and Security Compensatory Measures (the Order) to all operating nuclear power reactor licensees. Virginia Electric and Power Company (Dominion) submitted an answer to the Order on March 15, 2002 (Serial No.02-136). Dominion provided additional information in letters dated May 9, 2002 and July 15, 2002 (Serial Nos. 02-136A and 02-136B, respectively), and notified the NRC of compliance with the Order in an August 29, 2002 letter (Serial No. 02-136C).
The purpose of this letter is to revise our response to interim compensatory measure (ICM) B.4.e, as a result of recent station modifications.
If you have any questions, please contact Ms. Margaret Earle at (804) 273-2768.
Very truly yours, Eugene S. Grecheck Vice President - Nuclear Support Services Attachment Commitments made by this letter: As discussed in the attachment.
ATTACHMENT CONTAINS SAFEGUARDS INFORMATION.
UPON SEPARATION THIS PAGE IS DECONTROLLED.
cc:
U. S. Nuclear Regulatory Commission ATTN: Mr. Glenn Tracy Mail Stop 0-6H16 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Robert E. Martin (w/o Attachment)
Mail Stop 0-8G9 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Secretary, Office of the Secretary of the Commission (w/o Attachment)
U. S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, D. C. 20555
/Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Assistant General Counsel for Materials Litigation and Enforcement (w/o Attachment)
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 U. S. Nuclear Regulatory Commission Region II Regional Administrator P. 0. Box 2257 Atlanta, Georgia 30303-3415 Mr. S. R. Monarque (w/o Attachment)
NRC Project Manager North Anna Power Station Mr. M. T. Widmann (w/o Attachment)
NRC Senior Resident Inspector North Anna Power Station ATTACHMENT CONTAINS SAFEGUARDS INFORMATION.
UPON SEPARATION THIS PAGE IS DECONTROLLED.
Serial No: 02-136D Docket Nos.: 50-338/339 COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO
)
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Eugene S. Grecheck who is Vice President-Nuclear Support Services of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this5 q day of *I RhR
, 2004.
My Commission Expires:
3 131 1 D4 Notary Public (SEAL)
ATTACHMENT CONTAINS SAFEGUARDS INFORMATION.