ML040410604
| ML040410604 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/10/2004 |
| From: | Luehman J NRC/OE |
| To: | |
| Dixon-Herrity, J | |
| References | |
| EA-04-009 EN-04-005 | |
| Download: ML040410604 (3) | |
Text
February 10, 2004 EN-04-005 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:
TXU Energy (EA-04-009)
Comanche Peak Steam Electric Station Docket No. 50-445
Subject:
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation associated with a White Significance Determination Process (SDP) finding will be issued on or around February 13, 2004, to TXU Energy as a result of inspections at the Comanche Peak Steam Electric Station. This White finding, an issue with low to moderate increased importance to safety, involved the failure to identify and correct an indicated flaw in a steam generator tube during Refueling Outage 1RF08, a violation of 10CFR50, Appendix B, Criterion XVI. Failure to remove the tube from service resulted in a steam generator tube leak in September 2002. Accordingly, a Notice of Violation associated with the White finding is being issued.
It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:
Mailing of Final Significance Determination February 13, 2004 Telephone Notification of Licensee February 13, 2004 The State of Texas will be notified.
Contacts: J. Dixon-Herrity, OE, 415-1980 J. Luehman, OE, 415-2741
Distribution:
OWFN Chairman Diaz Comm. McGaffigan Comm. Merrifield SECY OCA PA IP OWFN EDO DEDR DEDE OE OGC NRR OI SP TWFN OCFO OP CENTER NMSS NSIR OIG OCIO RES ACRS Regional Offices RI RII RIII RIV MAIL ADAMS ADAMS Accession No.: ML040410604 OFFICE OE-ES OE NAME JDixon-Herrity JLuehman DATE 2/10/04 2/10/04