ML040370279

From kanterella
Jump to navigation Jump to search
EA-03-208 Ltr 02/06/04 Perry Re Notice of Nonpublic Meeting to Be Held on 03/02/04 in Region III Offices
ML040370279
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/06/2004
From: Dave Hills
NRC/RGN-III/DRS/MEB
To: Kanda W
FirstEnergy Nuclear Operating Co
References
EA-03-208
Download: ML040370279 (4)


Text

February 6, 2004 EA-03-208 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company P. O. Box 97, A210 10 Center Road Perry, OH 44081

Dear Mr. Kanda:

This letter confirms the discussion between Ms. P. Lougheed of this office and Mr. V. Higaki of your staff to have a predecisional enforcement conference on Tuesday, March 2, 2004, at 9:00 a.m. (CST) in the Region III Office, Lisle, Illinois. This meeting was rescheduled from February 4, 2004, based on your request. The purpose of this meeting is to discuss an apparent violation of the Technical Specification overtime requirement on March 12 and March 13, 2001, when apparently FENOC employees and employees of a FENOC contractor deliberately failed to obtain prior approval for overtime and deliberately falsified information on related time cards. The meeting will be closed to public attendance but will be transcribed, because it involves the findings of an Office of Investigations report that has not been publicly disclosed.

In accordance with 10 CFR Part 2.790 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Additional details regarding the apparent violation were provided in our December 19, 2003, letter to you (ADAMS Accession number ML033560448).

If you have any questions regarding this meeting, please contact me at (630) 829-9733.

Sincerely,

/RA/

David Hills, Chief Mechanical Engineering Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 See Attached Distribution

February 6, 2004 EA-03-208 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company P. O. Box 97, A210 10 Center Road Perry, OH 44081

Dear Mr. Kanda:

This letter confirms the discussion between Ms. P. Lougheed of this office and Mr. V. Higaki of your staff to have a predecisional enforcement conference on Tuesday, March 2, 2004, at 9:00 a.m. (CST) in the Region III Office, Lisle, Illinois. This meeting was rescheduled from February 4, 2004, based on your request. The purpose of this meeting is to discuss an apparent violation of the Technical Specification overtime requirement on March 12 and March 13, 2001, when apparently FENOC employees and employees of a FENOC contractor deliberately failed to obtain prior approval for overtime and deliberately falsified information on related time cards. The meeting will be closed to public attendance but will be transcribed, because it involves the findings of an Office of Investigations report that has not been publicly disclosed.

In accordance with 10 CFR Part 2.790 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Additional details regarding the apparent violation were provided in our December 19, 2003, letter to you (ADAMS Accession number ML033560448).

If you have any questions regarding this meeting, please contact me at (630) 829-9733.

Sincerely,

/RA/

David Hills, Chief Mechanical Engineering Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 See Attached Distribution

  • See Previous Concurrence DOCUMENT NAME: ML040370279.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII C RIII N

RIII NAME

  • ADunlop:tr
  • MRing
  • BClayton DHills DATE 02/04/04 02/04/04 02/05/04 02/04/04 OFFICIAL RECORD COPY

W. Kanda cc:

G. Leidich, President - FENOC K. Cimorelli, Acting Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health

W. Kanda cc:

G. Leidich, President - FENOC K. Cimorelli, Acting Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health ADAMS Distribution:

F. Congel (FJC), OE J. Dixon-Herrity, OE D. Dambly (DCD), OGC S. Lewis, OGC G. Caputo, OI AJM DFT SPS1 RidsNrrDipmIipb GEG HBC RJP C. Pederson, DRS C. Weil, RIII R. Paul, OI:RIII W. Franz, OI:RIII DRPIII DRSIII PLB1 JRK1