Notice of Meeting with Nuclear Management Company LLC to Discuss the Performance of Point Beach Nuclear Plant, as a follow-up to the IP 95003 Supplemental Inspection
ML040370163
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/05/2004
From: Anton Vegel
Division Reactor Projects III
To: Vanmiddlesworth G
Nuclear Management Co
References
IR-03-007
Download: ML040370163 (3)


Text

February 5, 2004 Mr. Gary Van Middlesworth Vice President - Nuclear Assessment Programs Acting Site-Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516

SUBJECT:

PUBLIC MEETING TO DISCUSS PERFORMANCE OF THE POINT BEACH NUCLEAR PLANT

Dear Mr. Van Middlesworth:

This letter confirms the discussion between Mr. Mike Kunowski of the NRC staff and Ms. Fritzie Flentje of the Nuclear Management Company (NMC) to have a meeting at 9:00 a.m. (CST) on Friday, February 20, 2004, at the Holiday Inn, 4601 Calumet Avenue, in Manitowoc, Wisconsin.

From July 28 to December 16, 2003, the NRC conducted an inspection in accordance with NRC Inspection Procedure (IP) 95003, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs, or One Red Input.

The inspection was conducted to review your corrective actions for two Red inspection findings associated with the auxiliary feedwater system. In addition, the IP 95003 supplemental inspection took a diagnostic look at your corrective action, emergency preparedness, and engineering programs. The results of the inspection were discussed at a public meeting on December 16, 2003, and are documented in Inspection Report 05000266/2003007; 05000301/2003007, issued with a letter sent to you, dated February 4, 2004.

The purpose of the meeting is for NRC senior managers, the Executive Director for Operations, and the Regional Administrator, to discuss with senior NMC officials the NRCs overall assessment of Point Beach performance, as a follow-up to the IP 95003 supplemental inspection. The meeting will include a discussion of NMCs assessment of Point Beach performance and NMCs plans to address the identified performance issues. The meeting is open to the public and there will be an opportunity for the public to speak with NRC representatives before the meeting is adjourned.

G. Van Middlesworth If you have any questions regarding this meeting, please contact me at (630) 829-9620.

Sincerely,

/RA/

Anton Vegel, Chief Branch 7 Division of Reactor Projects cc: R. Kuester, President and Chief Executive Officer, We Generation J. Cowan, Executive Vice President Chief Nuclear Officer D. Cooper, Senior Vice President, Group Operations D. Weaver, Nuclear Asset Manager Plant Manager Regulatory Affairs Manager Training Manager J. Rogoff, Vice President, Counsel & Secretary K. Duveneck, Town Chairman Town of Two Creeks Chairperson Public Service Commission of Wisconsin J. Kitsembel, Electric Division Public Service Commission of Wisconsin State Liaison Officer DOCUMENT NAME: C:\ORPCheckout\FileNET\ML040370163.wpd o receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME MKunowski:dtp AVegel SReynolds DATE 02/05/04 02/05/04 02/05/04 OFFICIAL RECORD COPY

G. Van Middlesworth ADAMS Distribution:

WDR DFT DWS DWW Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 SRI Point Beach DRPIII DRSIII PLB1 JRK1