ML040370137
| ML040370137 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 02/06/2004 |
| From: | Dave Hills NRC/RGN-III/DRS/MEB |
| To: | |
| References | |
| EA-03-208 | |
| Download: ML040370137 (2) | |
Text
February 6, 2004 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS NOT OPEN TO PUBLIC ATTENDANCE Name of Licensee:
FirstEnergy Nuclear Operating Company (FENOC)
Name of Facility:
Perry Nuclear Power Plant EA No:
EA-03-208 Docket No.:
50-440 Date and Time of Meeting:
Tuesday, March 2, 2004, at 9:00 a.m. (CST)
Location of Meeting:
U. S. Nuclear Regulatory Commission Region III 801 Warrenville Road Lisle, Illinois 60532-4351 Purpose of Meeting:
The meeting, which was rescheduled from February 4, 2004, is a Predecisional Enforcement Conference to discuss an apparent willful violation of the Technical Specification overtime requirement on March 12 and March 13, 2001, when apparently FENOC employees and employees of a FENOC contractor failed to obtain prior approval for overtime and falsified information on related time cards. The apparent violation is discussed in an NRC letter to FENOC, dated December 19, 2003 (ADAMS Accession No. ML033560448).
NRC Attendees:
G. Grant, Deputy Regional Administrator R. Caniano, Deputy Director, Division of Reactor Safety D. Hills, Chief, Mechanical Engineering Branch Others as designated Licensee Attendees:
W. Kanda, Vice President - Nuclear, Perry T. Rausch, Plant Manager J. Messina, Director, Nuclear Services Department V. Higaki, Manager, Regulatory Affairs Others as designated NOTE:
Attendance at this meeting by NRC personnel, other than those listed above, should be made known to David Hills at 630/829-9733 by COB February 26, 2004.
Approved by: /RA/
David E. Hills, Chief Mechanical Engineering Branch Division of Reactor Safety See Attached Distribution
Notice of Significant Licensee Meeting Distribution:
W. Travers, EDO S. Collins, DEDR J. Dyer, NRR L. Chandler, OGC D. Dambly (DCD), OGC G. Caputo, OI H. Bell, OIG F. Congel (FJC), OE J. Dixon-Herrity, OE D. Weaver, (DWW), Region III Coordinator, OEDO W. Ruland (WHR), Project Directorate, Division of Licensing Project Management, NRR S. Sands, Project Manager, Project Directorate, Division of Licensing Project Management, NRR J. Caldwell, RIII G. Grant, RIII R. Powell, SRI, Perry Nuclear Plant, Unit 1 B. Clayton, RIII C. Weil, RIII R. Paul, OI:RIII W. Franz, OI:RIII D. Holody, RI C. Evans, RII G. Sanborn, RIV R. Lickus (RML2), State Liaison Officer, RIII PMNS RIII Public Affairs (VTM, RJS2)
J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA R. Franovich, NRR S. Lewis, OGC OEMAIL OEWEB OAC: RIII RIDSNRRDIPMLIPB DRSIII DRPIII ADAMS(PARS)
SECY OCA PAO
- See Previous Concurrence DOCUMENT NAME: C:\\MYFILES\\Copies\\Per 030204 DRS SLM.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME
- ADunlop:tr
- MRing
- BClayton DHills DATE 02/04/04 02/04/04 02/05/04 02/06/04 OFFICIAL RECORD COPY