IR 05000247/2003007

From kanterella
(Redirected from ML040340518)
Jump to navigation Jump to search
Memo from David Silk to Peter Eselgroth Subject: Feeder to Indian Point Unit 2 & 3 Integrated Inspection Reports Nos. 05000247-03-007 & 05000286-03-006
ML040340518
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 05/27/2003
From: David Silk
NRC/RGN-I/DRS/OSB
To: Eselgroth P
Reactor Projects Branch 2
Shared Package
ML040340502 List:
References
FOIA/PA-2003-0379, IR-03-006, IR-03-007
Download: ML040340518 (6)


Text

May 27, 2003 MEMORANDUM TO: Peter W. Eselgroth, Chief Projects Branch 2 Division of Reactor Projects THRU: Richard J. Conte, Chief /RA!

Operational Safety Branch Division of Reactor Safety FROM: David M. Silk /RAI Senior Emergency Preparedness Inspector Operational Safety Branch Division of Reactor Safety SUBJECT: FEEDER TO INDIAN POINT UNIT 2 & 3 INTEGRATED INSPECTION REPORT NOS. 50-247/03-007 & 50-286/03-006 The attached report is an integrated feeder for the Indian Point Units 2 and 3 Inspection Report Nos. 50-247/03-007 and 50-286/03-006, and contains the results of an in-office emergency preparedness inspection conducted by David Silk during May 19 - 20, 2003, utilizing the applicable attachment from the baseline inspection program procedure 7111404, Emergency Action Level and Emergency Plan Changes.

Attachment: Feeder to Indian Point Units 2 and 3 Integrated Inspection Report Nos. 50-247/03-007 & 50-286/03-006 cc w/attachment: (VIA E-MAIL)

W. Lanning, DRS R. Crlenjak, DRS W. Cook, DRP P. Habighorst, SRI - Indian Point Unit 2 P. Drysdale, SRI - Indian Point Unit 3 R. Martin, DRP DRS File

P. Eselgroth 2 DOCUMENT NAME: G:\OSB\SILK\EP04IP2&3Revl.WPD After declaring this document "An Official Agency Record" it will not be released to the Public.

To receive a copy of this document, indicate in the box: C- = Copy without attachmentlenclosure E = Copy with attachmentlenciosure N =No copy OFFICE RI/DRS RI/DRS L l NAME DSilk RConte DATE 05/21/03 05/23/03 OFFICIAL RECORD COPY

SUMMARY OF FINDINGS IR 05000247/03-007 & 05000286/03-006 on 05/19-20/2003; Indian Point Units 2 and 3; Emergency Plan Changes.

This inspection was conducted by a region based inspector and an emergency preparedness specialist from NRR. The significance of issues is indicated by their color (Green, White, Yellow, Red) using IMC 0609 "Significance Determination Process" (SDP). Findings for which the SDP does not apply are indicated by "No Color" or by the severity level of the applicable violation. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described at its Reactor Oversight Process website at http://www.nrc.pov/NRR/OVERSIGHT/ASSESS/index.html.

Cornerstone: Emergency Preparedness

1EP4 Emergency Action Level and Emergency Plan Changes Inspection Scope During an in-office inspection during May 19 - 20, 2003, inspectors reviewed recent changes to EP-related documents as stated in the attachment. A thorough review was conducted of aspects of the plan related to the risk significant planning standards (RSPS), such as classifications, notifications and protective action recommendations. A general review was conducted for non-RSPS portions. These changes were reviewed against 10 CFR 50.54(q) to ensure that the changes do no decrease the effectiveness of the plan, and that the changes as made continue to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E. All of the changes made to the emergency plan or implementing procedures are subject to future inspections to ensure that the result of the changes continues to meet NRC regulation Findings No findings of significance were identifie PARTIAL LIST OF PERSONS CONTACTED Licensee N/A ITEMS OPENED, CLOSED, AND DISCUSSED ODened: None Closed: None Discussed: None LIST OF BASELINE INSPECTIONS PERFORMED 71114-04 Emergency Action Level and Emergency Plan Changes LIST OF ACRONYMS USED EP Emergency Preparedness RSPS Risk Significant Planning Standard LIST OF DOCUMENTS REVIEWED Indian Point Energy Center Emergency Plan, Rev 03-01 IP-EP-115, Emergency Plan Forms, Rev 1, 2 IP-EP-1 30, Emergency Notifications and Mobilization, Rev 0 IP-EP-250, Emergency Operations Facility, Rev 0 IP-EP-251, Alternate Emergency Operations Facility, Rev 1 IP-EP-255, Emergency Operations Facility Management and Liaisons, Void IP-EP-260, Joint News Center, Rev 0 IP-EP-310, Dose Assessment, Rev I IP-EP-410, Protective Action Recommendations, Rev 1 IP-EP-510, Meteorological, Radiological & Plant Data Acquisition System, Rev 1 IP-EP-520, Modular Emergency Assessment & Notification System (MEANS), Rev I IP-EP-610, Emergency Termination and Recovery, Rev I IP-EP-620, Estimation of Total Population Exposure, Rev 1 IP-1002, Emergency Notification and Communication, Rev 29, Void (IP2)

IP-1010, Central Control Room, Rev 9, 10 (IP2)

IP-10 1, Joint News, Void (IP2)

IP-1015, Radiological Monitoring Outside the Protected Area, Rev 11 (IP2)

IP-1019, Coordination of Corporate Response, Void (IP2)

IP-1030, Emergency Operations Facility, Void (IP2)

IP-1038, Offsite Emergency Notifications, Void (IP3)

IP-2001, ED, POM, Shift Managers Procedure, Rev 18 (IP3)

IP-2005, CR Offsite Communicator, Void (IP3)

IP-2300, Emergency Activation of the Emergency Operations Facility, Void (IP3)

IP-2302, EOF Technical Advisor & Information Liaison, Void (IP3)

IP-2303, EOF Radiological Assessment Team Leader, Void (IP3)

IP-2304, EOF Dose Assessment Health Physicist, Void (IP3)

IP-2305, EOF Midas Operator, Void, (IP3)

IP-2306, EOF Security Officer, Void (IP3)

IP-2307, EOF Clerk, Void (IP3)

IP-2308, EOF Direct Line Communicator, Void (IP3)

IP-2309, EOF Offsite Communicator, Void (IP3)

IP-2310, EOF Onsite Radiological Communicator, Void (IP3)

IP-231 1, EOF Offsite Radiological Communicator, Void (IP3)