Drywel 1 3.6.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY t
SR 3.6.5.1.1 Verify bypass leakage is less than or equal to the bypass leakage limit.
However, during the first unit startup following drywell bypass leak rate testing performed in accordance with this SR, the acceptance criterion is leakage
< 10% of the bypass leakage limit.
24 months following 2 consecutive tests with bypass leakage greater than the bypass leakage limit until 2 consecutive tests are less than or equal to the bypass leakage limit QAN 48 months following a test with bypass leakage greater than the bypass leakage limit AND
NOTE-----
SR 3.0.2 is not applicable for extensions > 12 months.
120 months, except that the next drywell bypass leak rate test performed after the November 24, 1993 test shall be performed no later than November 23, 2008 (continued) 'I GRAND GULF 3.6-53 Amendment No. 1°6*, 164
- W!lth Correction Lcttcr of 9/16/96
Drywel 1 3.6.5.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.5.1.2 Visually inspect the exposed accessible Once prior to interior and exterior surfaces of the performance of drywell.
each Type A test required by SR 3.6.1.1.1 SR 3.6.5.1.3 Verify drywell air lock leakage by 24 months performing an air lock barrel leakage test at 2 3 psid.
I GRAND GULF 3.6-53a Amendment No. 1-64 l
Programs and Manuals 5.5 5.5 Programs and Manuals (continued) 5.5.11 Technical Specifications (TS) Bases Control Program This program provides a means for processing changes to the Bases of these Technical Specifications.
- a.
Changes to the Bases of the TS shall be made under appropriate administrative controls and reviews.
- b.
Licensees may make changes to Bases without prior NRC approval provided the changes do not require either of the following:
- 1. A change in the TS incorporated in the license; or
- 2. A change to the updated FSAR or Bases that requires NRC approval pursuant to 10 CFR 50.59.
- c.
The Bases Control Program shall contain provisions to ensure that the Bases are maintained consistent with the UFSAR.
- d.
Proposed changes that do not meet the criteria of either Specification 5.5.11.b.1 or Specification 5.5.11.b.2 above shall be reviewed and approved by the NRC prior to implementation.
Changes to the Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 50.71(e).
5.5.12 10 CFR 50. Appendix J. Testina Program This program establishes the leakage rate testing program of the containment as required by 10 CFR 50.54(o) and 10 CFR *50, Appendix J, Option B, as modified by approved exemptions. This program shall be implemented in accordance with the Safety Evaluation issued by the Office of Nuclear Reactor Regulation dated April 26, 1995 (GNRI-95/00087) as modified by the Safety Evaluation issued for Amendment No. 135 to the Operating License, except that the next Type A test performed after the November 24, 1993 Type A test shall be performed no later than November 23, 2008.
Consistent with standard scheduling practices for Technical Specifications required surveillances, intervals for the recommended surveillance frequency for Type A, B and C testing may be extended by up to 25 percent of the test interval, not to exceed 15 months.
GRAND GULF 5.0-16 Amendment No..4-7-, l