ML040330236
| ML040330236 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 01/29/2004 |
| From: | NRC/NRR/DLPM |
| To: | |
| References | |
| TAC MB8140 | |
| Download: ML040330236 (1) | |
Text
ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) 6.8.4 The following programs shall be established, implemented, and maintained:
- a.
Primary Coolant Sources Outside Containment A program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels. The systems include the HPCI, CS, RHR, RCIC, Containment Hydrogen Recombiner, H2/02 analyzer, Post-Accident Sampling, Control Rod Drive Hydraulic (Scram Discharge portion) systems. The program shall include the following:
- 1. Preventive maintenance and periodic visual inspection requirements, and
- 2. A service pressure leak test for each system at refueling cycle intervals or less.
- b.
In-Plant Radiation Monitoring A program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions.
This program shall include the following:
- 1. Training of personnel,
- 2. Procedures for monitoring, and
- 3. Provisions for maintenance of sampling and analysis equipment.
- c.
Deleted HOPE CREEK 6-16 Amendment No. 149