February 2, 2004 Mr. Garry L. Randolph Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT, UNIT 1 - REVIEW OF LICENSEES COPY OF THE FACILITY OPERATING LICENSE (TAC NO. MC0786)
Dear Mr. Randolph:
A comparison review of your copy (i.e., the licensees copy) of Facility Operating License No.
NPF-30 for the Callaway Plant with respect to the License Authority File copy contained at the Nuclear Regulatory Commission has been completed. This review included the following appendices to the license: Appendix A (Technical Specifications), Appendix B (Environmental Protection Plan), and Appendix C (Additional Conditions). The enclosed table shows the differences found between the License Authority File and your copy of the license that need to be corrected. In some cases, an error was found in both the License Authority File and your copy of the license.
The corrections shown in the enclosed table are divided into the following two categories: (1) the error in the licensees copy of the license can be corrected without an amendment because the licensees copy is being changed to be the same as the License Authority File, or (2) the error, in both the License Authority File and the licensees copy of the license, has to be corrected through an amendment to the license. You are requested to correct the Category 1 errors within three months of the receipt of this letter. For the Category 2 errors, because these two errors are not significant, you are requested to propose the correcting amendments within 18 months of the receipt of this letter. The second enclosure is a copy of Appendix C, the additional conditions on the license, from the License Authority File.
Sincerely,
/RA/
Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosures:
- 1. Table
- 2. Appendix C cc w/encls: See next page
Mr. Garry L. Randolph February 2, 2004 Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT, UNIT 1 - REVIEW OF LICENSEES COPY OF THE FACILITY OPERATING LICENSE (TAC NO. MC0786)
Dear Mr. Randolph:
A comparison review of your copy (i.e., the licensees copy) of Facility Operating License No.
NPF-30 for the Callaway Plant with respect to the License Authority File copy contained at the Nuclear Regulatory Commission has been completed. This review included the following appendices to the license: Appendix A (Technical Specifications), Appendix B (Environmental Protection Plan), and Appendix C (Additional Conditions). The enclosed table shows the differences found between the License Authority File and your copy of the license that need to be corrected. In some cases, an error was found in both the License Authority File and your copy of the license.
The corrections shown in the enclosed table are divided into the following two categories: (1) the error in the licensees copy of the license can be corrected without an amendment because the licensees copy is being changed to be the same as the License Authority File, or (2) the error, in both the License Authority File and the licensees copy of the license, has to be corrected through an amendment to the license. You are requested to correct the Category 1 errors within three months of the receipt of this letter. For the Category 2 errors, because these two errors are not significant, you are requested to propose the correcting amendments within 18 months of the receipt of this letter. The second enclosure is a copy of Appendix C, the additional conditions on the license, from the License Authority File.
Sincerely,
/RA/
Jack Donohew, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-483 DISTRIBUTION:
PUBLIC
Enclosures:
- 1. Table PDIV-2 Reading
- 2. Appendix C RidsNrrDlpmPdiv (HBerkow)
RidsNrrPMJDonohew cc w/encls: See next page RidsNrrLaEPeyton RidsOgcRp RidsACRSACNWMailCenter RidsRegion4MailCenter (D. Graves)
SBloom JHarris ACCESSION NO.: ML040310007 Pkg: ML040310008 Encl 2: ML040480250 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME JDonohew EPeyton SDembek DATE 01/22/04 01/22/04 01/22/04 OFFICIAL RECORD COPY
ENCLOSURE 1 TABLE LICENSE AUTHORITY FILE COMPARISON REVIEW OF OPERATING LICENSE AND ITS APPENDICES COMPARISON WITH LICENSEES COPY OF LICENSE CALLAWAY PLANT, UNIT 1 Item Category Page No.
Specific Part of Operating License Difference from License Authority File License 1
1 3
License item 2.C.(2),
Technical Specifications and Environmental Protection Plan.
Add the phrase ", both of which are attached hereto" after Appendix B in the first sentence and replace the phrase "The licensee" by the word "UE" in the beginning of the second sentence.
2 1
7 License item 2.C.(15),
Additional Conditions.
Add Item 2.C.(15), Additional Conditions, to the copy of the license, as it is stated in the License Authority File.*
3 1
8 License item 2.E on the Commission-approved physical security, guard training and qualification, and safeguards contingency plans.
Delete the word "Physical" from the phrase, in the second sentence, "are entitled Callaway Physical Security Plan, with revisions submitted through November 17, 1987".
4 1
9, Appendix C, to the license.
Change the title of Appendix C to "Additional Conditions" and remove the brackets and the phrase that states the appendix was added by the licensee.
Appendix C to the License Authority File is the table entitled "Additional Conditions."
Item Category Page No.
Specific Part of Operating License Difference from License Authority File 5 1
Appendix C Replace Appendix C in the licensees copy of the license copy with the Appendix C in the License Authority File. The Commissions orders on Callaway can be considered a separate appendix to the license because, as stated in Item 2.C of the license, the licensee is subject to the conditions of the license and the orders of the Commission.**
Technical Specifications 6
2 5.0-27 Containment Leakage Rate Testing Program in TS 5.5.16.
Propose an amendment to correct both the licensees TSs and the License Authority File, which both have the following phrase in 5.5.16.e: "The provisions or Technical Specification SR 3.0.2 do not apply..." The word "or" should be "of."
7 2
5.0-29 Radioactive Effluent Release Report in TS 5.6.3.
Propose an amendment to correct both the licensees TSs and the License Authority File, which both have a period (".") in the phrase:
"submitted prior to May 1 of each year. in accordance with 10 CFR 50.36a." The period should be deleted.
The words in 2.C.(15) of the License Authority File are the following:
(15)
Additional Conditions The Additional Conditions contained in Appendix C, as revised through Amendment No. 133, are hereby incorporated into this license. UE shall operate the facility in accordance with the Additional Conditions.
A copy of Appendix C in the License Authority File is Enclosure 2 to the letter.
COPY OF APPENDIX C TO FACILITY OPERATING LICENSE NO. NPF-30 FROM NRC LICENSE AUTHORITY FILE ENCLOSURE 2
Callaway Plant, Unit 1 cc:
Professional Nuclear Consulting, Inc.
19041 Raines Drive Derwood, MD 20855 John ONeill, Esq.
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, N.W.
Washington, D.C. 20037 Mr. Mark A. Reidmeyer, Regional Regulatory Affairs Supervisor Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 U.S. Nuclear Regulatory Commission Resident Inspector Office 8201 NRC Road Steedman, MO 65077-1302 Mr. Chris Younie Manager, Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251 Manager - Electric Department Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, MO 65102 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Mr. Ronald A. Kucera Deputy Director for Public Policy Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839 Mr. Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130 Mr. Lee Fritz, Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, MO 65151 Mr. David E. Shafer Superintendent, Licensing Regulatory Affairs AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Mr. Keith D. Young Manager, Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Mr. Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570