4.
Richard L. Anderson Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3883 Fax 570.542.1504 RLAnderson@ppiweb.com I
I
__~ ~~~*,
s TM January 12, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP 1-17 Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA- 005712 The December 2003 Monthly Operating Reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours, Richard L. Anderson JJH/cmrnm cc: NRC Region I NRC Sr. Resident Inspector, Mr. S. Hansell NRC Project Manager, Mr. R V. Guzman 5Z' -
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 01/1212004 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susguehanna Steam Electric Station (UI)
- 2. Reporting Period:
December 2003
- 3.
Design Electrical Rating (Net MWe):
1115
- 4. Maximum Dependable Capacity (Net MWe):
1105
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
827,671 Yr.-to-Date 8760 8,620.3 8,585.7 0
9.359,909 Cumulative 180,289 150,484.8
. 148,239.5 0
152.613,438 NOTES:
Page 1 of 1
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 01/12/04 J. J. Hennings (570) 542-3747 REPORT MONTH CIUC W
No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3
No shutdowns this month.
Summary: There were no power reductions greater than 20% this month.
1.
F. Forced S. Scheduled 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F-Administrative G - Operational Error (Explain) 3.
Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page I of 1
SUSOUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Date:
01/12/04 Completed by: J. J. Iennings Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 01/12/04 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 1. Unit Name:
Susguehanna Steam Electric Station (U2)
- 2. Reporting Period:
December 2003
- 3. Design Electrical Rating (Net MWe):
1182
- 4.
Maximum Dependable Capacity (Net MWe):
1140
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
This Month 744 744 744 0
873,510 Yr.-to-Date 8760 7,746.4 7.701.9 0
8,654,657 Cumulative
.165,529 143,895.8 141,908.6 0
148,765,651 NOTES:
Page 1 of I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 01/12/04 J. J. Hennings (570) 542-3747 REPORT MONTH December 2003 No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor 3
No shutdowns this month.
Summary: There were no power reductions greater then 20% this month.
1.
2.
3.
F. Forced S. Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other Page 1 of 1
r -
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Completed by:
J. J. Hennings Date:
01/12/2004 Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.