FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road PO. Box 97 Perry Ohio 44081 January 14, 2003 PY-CEIINRR-2762L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the December 2003 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector jERc

OPERATING DATA REPORT UNIT:

Perry DATE:

1112/04 1.

2.

3.

4.

5.

6.

7.

Docket: 50440 Unit Name:

Perry Nuclear Power Plant Reporting Period: December 2003 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1260 1235 8.

9.

10.

11.

Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

ThisMonth Yr-to-Date Cumulative 744.0 7.341.2 112.244.7 744.0 7.241.0 109,511.3 0.0 0.0 0.0 935.145.0 8,553.201.0 125,128.412.0 Page 1

UNIT SHUTDOWNS REPORT MONTH - December 2003 II I DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 1/1 2/04 CONTACT: T. PhelDs TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

l 3

l I.

I

~~~~~~~~~~~~~~~~~~~~~~~~I.

I

~~~~~~~~~~~~I I

1 1

11 1~~~~~~~~~~~~~~~

X I

SUMMARY

The Perry Plant was on line the entire month of December.

1. TYPE:

F: Forced S: Scheduled

2. REASON:

A-Equipment Failure (explain)

B - Maintenance or Test C - Refueling I

D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2