December 2003 Monthly Operating Report for LaSalle County Station Units 1 and 2
ML040210491
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/15/2004
From: Kaegi G
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML040210491 (3)


Text

I -

l~

ExeIenim Exelon Generation Company, LLC LaSalle County Station 2601 North 21"Road Marseilles, IL 61341-9757 www.exeloncorp.com Nuclear January 15, 2004 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374

Subject:

Monthly Operating Report for December 2003 Enclosed is the Exelon Generation Company (EGC), LLC, Monthly Operating Report for LaSalle County Station covering the period from December 1 through December 31, 2003. This report is submitted in accordance with Technical Specification 5.6.4.

Should you have any questions concerning this letter, please contact Mr. Glen T. Kaegi, Regulatory Assurance Manager, at (815) 415-2800.

Respectfully, Iz 

Glen T. Kaegi Regulatory Assurance Manager LaSalle County Station Attachment cc:

Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - LaSalle County Station 5ez7~wf

OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME U

DATE Ja COMPLETED BY SUt TELEPHONE (8

REPORTING PERIOD:

D-373 iSalle I nuary 12, 2004 evie Du Pont

15) 415-2197 December 2003 1.

2.

Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 1,154.00 1,111.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 824,678.00 Yr-to-Date 8,730.77 8,716.45 0.00 9,739,033.00 Cumulative 124,375.97 122,133.35 1.00 123,282,194.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments 1

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

SUMMARY

The unit started the month of December operating at reduced power (797 MWe) due to recovery from the November 27, 2003, manual scram. The unit was returned to full power on December 2. The unit operated at full power for the remainder of the month with the following exceptions: On December 6, power was reduced to 897 MWe for control rod pattern adjustment. The unit was returned to full power on December 7. On December 10, power was reduced to 487 MWe to mitigate a loss of feedwater heater event caused by the inadvertent opening of the 1 B Turbine Driven Reactor Feed pump minimum flow valve. The valve controller was repaired and the unit was returned to full power on December 12. On December 21 power was reduced to 870 MWe for control rod pattern adjustment. The unit was returned to full power on December 21.

UNIQUE REPORTING REQUIREMENTS FOR UNIT ONE

1. Challenges other than routine surveillance testing to Safety/Relief Valve Operations - None.

Page 1 of 2

OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME Ea DATE Jai COMPLETED BY StE TELEPHONE (81 REPORTING PERIOD:

-374 Salle 2 nuary 12, 2004 wvie Du Pont

15) 415-2197 December 2003 1.

2.

Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 1,154.00 1,111.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 848,159.00 Yr-to-Date 7,886.68 7,763.54 0.00 8,709,051.00 Cumulative 115,923.26 114,792.93 0.00 117,034,492.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments 1

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

3 4

5 Manual TriplScram Automatic Trip/Scram Continuation Other (Explain)

SUMMARY

The unit operated during the month at full power with the following exceptions: On December 12, power was reduced to 940 MWe for inspection of the 2B Turbine Driven Reactor Deed pump minimum flow valve. The unit was returned to full power on December 12. On December 13, power was reduced to 590 MWe to repair steam leaks in the feedwater heater bays. Packing for two valves was repaired and the unit was returned to full power on December 15.

UNIQUE REPORTING REQUIREMENTS FOR UNITT WO

1. Challenges other than routine surveillance testing to Safety/Relief Valve Operations - None.

Page 2 of 2