ML040200146
| ML040200146 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/13/2004 |
| From: | Bezilla M FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 1-1341 | |
| Download: ML040200146 (1) | |
Text
FENOC 5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President - Nuclear Fax: 419-321-7582 SAFEGUARDS INFORMATION UNAUTHORIZED DISCLOSURE MAYBE SUBJECT TO CIVAL AND CRIMINAL SANCTIONS Docket Number 50-346 License Number NPF-3 Serial Number 1-1341 January 13, 2004 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001
Subject:
Industrial Security Plan (Revision 21/Change 3)
Ladies and Gentlemen:
In accordance with provisions of 10CFR50.54(p), the Davis-Besse Nuclear Power Station (DBNPS) hereby submits the Industrial Security Plan, Revision 21/Change 3 (Attachment 1). A report of the changes made to the document is included with each copy.
Attachment I contains Safeguards Information and pursuant to 10CFR 73.21 is to be withheld from public disclosure.
Should you have any questions or require additional information, please contact Mr. Gregory A. Dunn, Manager - Regulatory Affairs, at (419) 321-8450.
Very truly yours, AW'B/s X
4 Attachments cc:
Regional Administrator, NRC Region III DB-l NRC/NRR Senior Project Manager w/o DB-I NRC Senior Resident Inspector w/o Utility Radiological Safety Board w/o SAFEGUARDS INFORMATION UNAUTHORIZED DISCLOSURE MAYBE SUBJECT TO CIVAL AND CRIMINAL SANCTIONS WHEN SEPARATED FROM ATTACHMENTS, HANDLE THIS DOCUMENT AS DECONTROLLED II -