MISCELLANEOUS CORRESPONDENCE FOR THE MONTICELLO INITIAL EXAMINATION - SEP 2003
a Q-Monticello Nuclear Generating Plant Operated by Nuclear Management Company, LLC Committed to September 20, 2001 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
.~
MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DP,R-22 Response to Regulatory Issue Summary 2001-1 7: Preparation and Scheduling of Operator Licensing Examinations In response to the request of Regulatory Issue Summary 2001-17, Preparation and Scheduling of Operator Licensing Examinations, the Monticello Nuclear Plant submits the information requested in Attachment 1.
Please contact Dirk Foster, Operations Training Supervisor for Initial Training, at 763-271 -2604 if you require further information.
Jeffrey S. Forb&
Site Vice President Attachment (1) c:
Regional Administrator - Ill, NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC Minnesota Dept. of Commerce J E Silberg J:\\LICENSE\\NRC M i s t Correspondence\\Re$ponse to RIS 2001 -17.doc 2807 West CounQ Road 75 Monticello, Minnesota 55362-9637 Telephone: 763.295.5151 Fax: 763.295.1454 7-9 2 8-rn$7
.~
/(8-2000)
OPERATOR LICENSING EXAMINATION DATA EXPIRES: 07/31(2002 Estimated burden per res onse to comply with this voluntary information collection request: 7 hour8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />. ?his information collection is used to plan budgets ana resources ior operator examinations. Send comments regalding burden estimate to the Records Management Branch 6-6 6) US, Nuclear Regulatory Commission. Washington. DC 20555-0 01. 0; by internet e-mail 10 bjsl@nrc oav and to the Desk Office-Offrce of Information and Re ulatory Affairs, PiEOb-10202. (3150-0131).
'bffice of Management and Judget Washington. DC 20503. If a mens used to impose an information collect&
does not display a currently valid OMB control number the NRC may not conduct or sponsor. and a person is not required to respond to, the inionnation collection.
I Monticello Nuclear Generating Plant PROPOSED NUMBER I Region I l l CY 02 I ESTIMATED NUMBER OF EXAMINATIONS NRC-PREPARED ESTIMATED NUM8ER OF EXAMINATIONS LICENSEE-PREPARED
- I
~~
1 1
1 1
0 0
0 0
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSEDDATES I
- 3. INITIAL OPERATOR LICENSE EXAMINATIONS
~
0 0
0 PROPOSED NUMBER I PRIMARY DATE ALTERNATE DATE CY 02 1
09/02 to 09/06 Sep 03 Sep 04 Sep 05 N/A Oct 03 Oct 04 Oct 05 CY 05 -
~~
cy- 02 PROPOSED NUMBER I
NUMBER OF REACTOR OPERATORS c/- 03 4
FIRST I
L 6
SECOND THlRD FfRST SECOND THIRD 6
I ESTIMATED NUMBER OF CANDIDATES 6
0 9
0 10 t
L I
1 1
I I
NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 2
l 4
4 l
4 I
I I
I I
I I
NUMBER OF SENiOR REACTOR OPERATORS - UPGRADE I
1
. PROPOSED GENERIC FUNDAMENTALS EXAMINATJON (GFE) SCHEDULE Thii form was designed using ln?orms NRC FORM 536 (EZOCO)
PRINTEDONRECYCLEDPAPER
November 30, 2001 Mr. J. Forbes Site Vice-president Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
CALENDAR YEAR 2003 SCHEDULING OF NRC REGION Ill LICENSED OPERATOR EXAMINATIONS
Dear Mr. Forbes:
The purpose of this letter is to enlist your support in the scheduling of calendar year 2003 initial licensed operator examinations in NRC Region Ill. The enclosure of this letter lists requests received from Region Ill facility licensees for licensed operator examinations for that calendar year. A large number of those examination requests fall within the months of September through December 2003. In addition, Region Ill facility licensees have provided us with projected dates during which they would expect to conduct licensed operator requalification examinations during that year. This information indicates that the NRC operator licensing staff would need to conduct six of the eight calendar year 2003 Region I l l licensed operator requalification baseline inspections during those same months. Consequently, the projected workload for the Region Ill operator licensing examiners during the final quarter of calendar year 2003 will be difficult to accomplish.
We have contacted the other NRC regional and headquarters offices to ascertain the availability of qualified examiners from outside Region Ill. Based on current projections, we can accommodate the majority of the exams near the requested dates, but will have to schedule several exams approximately two months prior to or beyond the requested quarter.
Before we finalize the calendar year 2003 exam dates, we want to provide you the opportunity to re-evaluate your training and examination schedule and determine whether you can realign your request to outside the fourth calendar quarter of 2003. Please contact us to revise or reaffirm your request by calling Mr. David Hills (630-829-9733) of my staff within fifteen days of the date of this letter. We will proceed with scheduling the calendar year 2003 examinations after December 15, 2001
J. Forbes OFFICE Rlll Id Rlll A I I
NAME DEHiksd J G r o b w d DATE l l ~ / O l 1 I /a/c)l I
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at httD://www.nrc.nov/NRC/ADAMS/index. html (the Public Electronic Reading Room).
Sincerely, 3
John A. Grobe, Director Division of Reactor Safety Docket No. 50-263 License No. DPR-22
Enclosure:
List of 2003 Examinations Requested cc w/encl:
J. Purkis, Plant Manager R. Anderson, Executive Vice President Nuclear Asset Manager Site Licensing Manager Commissioner, Minnesota Department of Health J. Silberg, Esquire R. Nelson, President and Chief Nuclear Officer Shaw, Pittman, Potts, and Trowbridge Minnesota Environmental Control Citizens Association (MECCA)
Commissioner, Minnesota Pollution Control Agency D. Gruber, AuditorlTreasurer Wright County Government Center Commissioner, Minnesota Department of Commerce A. Neblett, Assistant Attorney General M. Mitchell, Training Department DOCUMENT NAME: G:DRS\\Monl136Oldrs.wDd
J. Forbes ADAMS Distribution:
WDR D FT CFL RidsNrrDipmlipb GEG HBC SXB3 DRPl I I DRSlll PLBI JRKI M. Bies (Concurrence Copy)
February 20, 2002 Mr. J. Forbes Site Vice-president Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637
Dear Mr. Forbes:
In response to your facility management letter dated September 20, 2001, and as augmented by discussions with Michael Mitchell of your staff on January 14, 2002, we have tentatively scheduled an initial licensing examination for your operator license applicants at the Monticello Nuclear Generating Plant during the weeks of September 15 and September 22, 2003.
Validation of the examination will occur at the station during the week of August 4, 2003. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.
As stated in your letter, your staff will develop the examination. To support the examination administration date, we have tentatively scheduled the date of July 21, 2003, to begin our review of your submitted examination.
Your letter indicated you are training approximately 12 candidates for the examination. Please inform us if the number of candidates declines below 10 as this will impact the examination schedule. Please also inform us at your earliest opportunity if you discover you are unable to support the examination on the scheduled dates.
Once your staff has determined a schedule for examination development, please have them contact the Chief Examiner to arrange for a suitable examination outline submittal date for NRC review. The intent is for the examination outline to be submitted early in the examination development process. This is to preclude the need to make significant changes to developed examination material as a result of the NRC review of the outline.
Hironori Peterson has been tentatively assigned as the Chief Examiner and can be reached at 630-829-9707.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination outlining examination security expectations, listing the materials required by the NRC to conduct the examination, reconfirming the examination dates, and reconfirming the number of candidates you have in the training program. If you have any questions concerning this information, please contact Dell R. McNeil of my staff at 630-829-9737.
OFFICE RIII:DRS I c/ RII I : DRS I d RIII:DRS IM NAME MABies:sd &.
DRMcNeil W DEHills PL-DATE 02/6y/02 021 19 IO2 02 h b 102 In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
I Sincerely, David E. Hills, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc:
J. Purkis, Plant Manager R. Anderson, Executive Vice President Nuclear Asset Manager Site Licensing Manager Commissioner, Minnesota Department of Health J. Silberg, Esquire R. Nelson, President and Chief Nuclear Officer Shaw, Pittman, Potts, and Trowbridge Minnesota Environmental Control Citizens Association (MECCA)
Commissioner, Minnesota Pollution Control Agency D. Gruber, AuditorITreasurer Wright County Government Center Commissioner, Minnesota Department of Commerce A. Neblett, Assistant Attorney General M. Mitchell, Training Department
J. Forbes ADAMS Distribution:
WDR DFT SXM 1 RidsNrrDipmlipb GEG HBC SXB3 DRPlll DRSlll PLBI JRKI DCT M. A. Bies, DRS
~~
~
~-
ccc_) U / f l & A k - c I..
Monticello Nuclear Operated by Nuclear Management Company, LLC July 9, 2002 10 CFR Part 55 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 MONTICELLO NUCLEAR GENERATING PLANT Docket No. DPR-22 License No. 50-263 Response to NRC Regulatory Issue Summary 2002-09 Preparation and Scheduling of Operator Licensinq Examinations Nuclear Management Company, LLC (NMC) is hereby providing a response to NRC Regulatory Issue Summary (RIS) 2002-09, Preparation and Scheduling of Operator Licensing Examination, for the Monticello Nuclear Generating Plant.
The completed NRC Form 536 is attached and provides NMCs voluntary response to the NRC RIS 2002-09. This response provides the NRC with Monticellos currently proposed schedules of examinations that are intended to be prepared and the current estimate of the number of applicants to be tested in both, the site examinations and the Generic Fundamentals Examinations in calendar years 2003 through 2006.
If you have any questions regarding this submittal please contact Bill Cheever, General Supervisor Operations Training at (763) 271-2629, or Doug Neve, Licensing Manager at (763) 295-1 353.
Jeffrey S. Forbes Site Vice President Monticello Nuclear Generating Plant
Attachment:
NRC Form 536 - Operator Licensing Examination Data cc:
Regional Administrator - I l l, NRC NRR Project Manager, NRC Sr. Resident Inspector, NRC 2807 West County Road 75 Monticello, Minnesota 55362-9637 Telephone: 763.295.51 51 0 Fax: 763.295.1454 JUL 1 8
1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER c y 3 3 c y 3 4 c y 9 cy*
ESTIMATED NUMBER OF EXAMINATIONS ESTIMATED NUMBER OF EXAMINATIONS 1
1 1
1 0
0 0
0 LICENSEE-PREPARED NRC-PREPARED
- 3. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER c y 3 3 C Y A 4 cy*
CY, 7
6 6
6 NUMBER OF REACTOR OPERATORS OPERATORS - INSTANT 5
2 2
2 OPERATORS - UPGRADE 0
1 2
2 OPERATORS - LIMITED 0
0 0
0 NUMBER OF SENIOR REACTOR NUMBER OF SENIOR REACTOR NUMBER OF SENIOR REACTOR PROPOSED DATES SEPT. 15-19, NOV. 01-05, NOV. 07-11, NOV.
06-10, PRIMARY DATE 2003 2004 2005 2006 NOV.
08-12, NOV.
14-18, NOV. 13-17, 2004 2005 2006 ALTERNATE DATE N/A
- . PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE MONTICELLO NUCLEAR GENERATING PLANT 50-263
~NRC FORM 536 (8-2000)
U.S. NUCLEAR REGULATORY COMMISSION 0 PE RAT0 R LICENSING EXAMINATION DATA I11 APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2002 Estimated burden per res onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. %is information collection is used to plan budgets and resources for operator examinations. Send comments re arding burden estimate to the Records Management Branch (T-6 E6) US. Nucfear Regulatory Commission Washington DC 20555-0001 0; by internet e-mail to bjsl@nrc. 04 and to the Disk Officer Office oflnformation and Re ulatory Affairs, NEOB-10202, (3150-0131), Office.of Management and judget Washington. DC 20503.
If a means used to impose an inforrnatlon collectro~
does not dlsplay a currently valid OM5 control number, the NRC may not conduct or sponsor. and a person is not required to respond to, the information collection.
PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES cy -03 cy -04 FIRST SECOND THIRD FIRST SECOND THIRD 0
6 0
0 6
0
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION 111 801 WARRENVILLE ROAD LISLE, ILLINOIS 60532-4351 May 15,2003 Mr. D. Wilson Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 755 Monticello, MN 55362-9637
Dear Mr. Wilson:
In a telephone conversation on May 2, 2003 between Mr. Gerald M. Allex and Mr. Hironori Peterson, arrangements were made for the administration of licensing examinations at the Monticello Nuclear Generating Plant the weeks of September 15 and 22, 2003. In addition, the NRC will make an examination validation visit to your facility the week of August 11, 2003.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8, Supplement I, of NUREG-I 021, "Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 19, 2003. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by July 14, 2003. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready to use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-I021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 31 50-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 7995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on May 31,2003.
The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJSI @NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (31 50-001 8), Office of Management and Budget, Washington, D.C. 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Allex has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. H. Peterson at 630-829-9707, or me at 630-829-9631.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.aov/readina-rm/adams.html (the Public Electronic Reading Room).
Sincere I y,
/RA/
Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 See Attached Distribution DOCUMENT NAME: G:\\DRS\\MONOS 603DRS.w~d OFFIClAL RECORD COPY
D. Wilson cc:
J. Purkis, Plant Manager J. Cowan, Chief Nuclear Officer J. Forbes, Senior Vice President D. Neve, Manager, Regulatory Affairs J. Rogoff, Esquire General Counsel W. Brunetti, President and CEO Nuclear Asset Manager Site Licensing Manager Commissioner, Minnesota Department of Health J. Silberg, Esquire R. Nelson, President Xcel Energy Inc.
Shaw, Pittman, Potts, and Trowbridge Minnesota Environmental Control Citizens Association ( M ECCA)
Commissioner, Minnesota Pollution Control Agency D. Gruber, Auditor, Wright County Board of Commissioners Commissioner, Minnesota Department of Commerce G. Wilson, Commissioner of Commerce P. Marker, Office of Attorney General C. Bomberger, Nuclear Asset Manager G. J. Lashinski, Training Department ADAMS Distribution:
WDR DCT DFT SXMl LMP RidsNrrDipmlipb GEG HBC SXB3 DRPlll DRSlll PLBl JRKl M. A. Bies, DRS
Committed to Nuclear Excellence -/
July 11, 2003 Monticello Nuclear Generatinq Plant Operated by Nuclear Management Company, LLC L-MT-03-050 I O CFR Part 55.40 Attention: Hironori (Pete) Peterson US Nuclear Regulatory Commission, Region Ill 801 Warrenville Road Lisle, Illinois 60532-4351 MONTICELLO,NUCLEAR GENERATING PLANT DOCKET 50-263 LICENSE NO. DPR-22 WRITTEN EXAMINATION FOR INITIAL LICENSING EXAMINATION TO BE CONDUCTED THE WEEK OF SEPTEMBER 15,2003 Reference I
- NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 8, Supplement 1 In accordance with the requirements of 10 CFR 55.40(b)(4), a power reactor facility licensee must receive NRC approval of their proposed written examination and operating tests. Further, 1 OCFR55.40(a) requires that examinations meet the requirements of Reference 1. Therefore, enclosed for your review are the proposed examination materials for the initial license examinations for our operator license applicants.
In accordance with 1 OCFR 55.49, Integrity of Examinations and Tests and Reference 1, Section ES-201, Attachment 1, Examination Security and Integrity Guidelines, the NMC requests that the enclosed materials be withheld from public disclosure until after the examinations are complete, and further that the enclosed materials only be viewed by the NRC examiner, Mr. Hironori (Pete) Peterson.
The proposed examination materials were prepared per the guidelines of Reference 1, sections ES-301 and ES-401. The proposed examination materials have been prepared by the Monticello facility for seven Reactor Operator license candidates, four instant Senior Reactor Operator license candidates, and one instant Senior Reactor Operator license candidate taking the written exam only.
Enclosed are the following items for your review:
Volume I Written Exam Volume I1 Volume I l l Volume IV EOP Flowcharts (candidate copy)
MNGP Administrative and Operating Procedures CD Category A, Administrative Topics and Category B, Control Room Systems and Facility Walk-through Category C, Integrated Plant Operations Technical Specifications (candidate copy)
Page 2 If you have any questions regarding the enclosed information please contact Gerald M.
Allex, Principal Instructor, (763-271 -2654 or 763-295-1 563), or John Fields (763-295-1663).
David L. Wilson Site Vice President Monticello Nuclear Generating Plant cc:
USNRC Document Control Desk (w/o attachments)
NRR Project Manager, NRC (w/o attachments)
Sr. Resident Inspector, NRC (wlo attachments)
Table of Contents Volume I Written Exam Volume II Volume I l l Volume IV EOP Flowcharts (candidate copy)
MNGP Administrative and Operating Procedures CD Category A, Administrative Topics and Category B, Control Room Systems and Facility Walk-through Category C, Integrated Plant Operations Tech n ical Specifications (candid ate copy)
ATTACHMENT 1 NUCLEAR MANAGEMENT COMPANY, LLC MONTICELLO NUCLEAR GENERATING PLANT DOCKET 50-263 July 11,2003 TABLE OF CONTENTS 2 pages follow 1-1
ATTACHMENT I TABLE OF CONTENTS Volume I Written Exam 0
0 0
ES-401-1, BWR SRO Examination Outline ES-401-2, BWR RO Examination Outline ES-401-7, Written Exam Quality Checklist (one for the SRO Examination and Written Exam Bank (128 questions with applicable references)
SRO Exam RO Exam Written Exam MatridAnswer Key Audit Exam Outlines one for the RO Examination)
Volume II Category A, Administrative Topics and Category B, Control Room Systems and Facility Walk-through 0
ES-301-1, Administrative Topics Outline (one for the SRO Examination and one ES-301-2, Control Room Systems and Facility Walk-Through Test Outline for the RO Examination)
(RO/SRO Examination)
Volume 111 Category C, Integrated Plant Operations 0
0 0
0 ES-301-6, Competencies Checklist 0
0 ES-301-3, Operating Test Quality Checklist ES-301-4, Simulator Scenario Quality Checklist ES-301-5, Transient and Event Checklist ES-D-1, Scenario Outline (1 for each scenario for 4 total)
ES-D-2, Operator Actions (1 for each scenario for 4 total)
Volume IV MNGP Technical Specification (candidate copy)
The following sections have been removed for examination purposes:
Section 1.0 DEFINITIONS Section 2.0 SAFETY LIMITS 0
Section 3.0/4.0 SURVEILLANCE REQUIREMENTS EOP Flowcharts (candidate copy)
All entry conditions have been removed.
1-2
ATTACHMENT I MNGP Administrative and Operating Procedures CD The following procedures have been copied to a CD for your use in exam review:
Administrative Work Instructions (AWI)
Emergency Procedures (Vol. A)
System Description and Operation (Vol. B) integrated Operation (Voi. C)
Special Equipment and Operations (Vol. D)
E-Manual (Electrical) (Vol. E)
Operations Work instructions (Owl)
M N G P Technical Specifications 1-3