ML040150155
| ML040150155 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 01/06/2004 |
| From: | Conicella N Public Service Enterprise Group |
| To: | Conte R NRC/RGN-I/DRS/OSB |
| Conte R | |
| References | |
| 50-354/04-301 50-354/04-301 | |
| Download: ML040150155 (1) | |
Text
ES-301 Administrative Topics Outline Facility: Hope Creek Examination Level: SRO(I1 Date of Examination: 1/5/04 Operating Test Number: 1 A. 1 A.2 Administrative Topidsubject Description A.3 A.4 Conduct of Operations Questions Conduct of Operations JPM Equipment Control JPM Radiation Control Questions Emergency Plan Questions Describe method of evaluation:
- 2. TWO Administrative Questions 2.1.25 (3.1) - Ability to obtain and interpret station reference materials such as graphs /
monographs / and tables which contain data.
4 QUESTION 1 : Given plant conditions. Determine the required Circulation Water System requirements for extreme cold weather. (BANK-ILOT NRC 2002 Modified) 2.1.25 (3.1) - Ability to obtain and interpret station reference materials such as graphs /
monographs / and tables which contain data.
QUESTION 2: Calculate time to establish Secondary Containment following a loss of Shutdown Cooling. (BANK-ILOT NRC 2002 Modified) 2.1.1 8 (3.0) - Ability to make accurate / clear and concise logs / records / status boards /
and reports.
JPM: Verify HC.OP-DL.ZZ-0026 log requirements for resuming Core Alterations.
(LSRO NRC 2003 Modified) 2.2.1 2 (3.4) - Knowledge of surveillance procedures.
JPM: Review Power Distribution Lineup Surveillance for Tech Spec compliance in abnormal alignment. (BANK -2002 ILOT Audit) 2.3.1 (3.2) - Ability to control radiation releases QUESTION 1: Choosing Primary Containment Vent Path. (NEW) 2.3.4 (3.1) - Knowledge of radiation exposure limits and contamination control I including permissible levels in excess of those authorized.
QUESTION 2: Non-emergency dose approval. (NEW) 2.4.41 (4.1) - Knowledge of the Emergency Action Level thresholds and classifications.
JPM: Given a set of conditions, classify an event and complete the initial contact message form. (NRN) 03HCREMED1 NRCADMOUTL Revised-l2/23/03, 7:47 AM
.doc NUREG-1021, ReGision 8