VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 January 7, 2004 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Serial No.:
NLOS/MM 03-621 Docket Nos.: 50-338 50-339 License Nos.: NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS I AND 2 ANNUAL STEAM GENERATOR INSERVICE INSPECTION
SUMMARY
REPORT Pursuant to Technical Specification 5.6.7.b for North Anna Power Station Units 1 and 2, Dominion is required to submit an Annual Steam Generator Inservice Inspection Summary Report to the NRC. This is to inform you that there were no eddy current inspections performed on the steam generators for North Anna Units 1 and 2 during 2003.
This letter does not establish any new commitments. Should you have any questions or require additional information, please contact Mr. Tom Shaub at (804) 273-2763.
Very truly yours, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc.
for Virginia Electric and Power Company A04/1
Serial No.: 03-621 NAPS Ann. SG ISI Summ. Report cc page 1 of 1 cc:
U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8-H112 Rockville, MD 20852 Mr. M. T. Widmann NRC Senior Resident Inspector North Anna Power Station Mr. Jackson E. Reasor, Jr.
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Boulevard Suite 300 Glen Allen, VA 23060