ML040140341

From kanterella
Jump to navigation Jump to search
Response to NRC Bulletin 2003-004, Rebaselining of Data in the Nuclear Materials Management and Safeguards System
ML040140341
Person / Time
Site: Pilgrim
(DPR-035)
Issue date: 01/05/2004
From: Bethay S
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BL-03-004
Download: ML040140341 (2)


Text

Entergy Nuclear Operations, Inc.

'~~En tergy Pilgrim Station

~~'En tergy 600 Rocky Hill Road Plymouth, MA 02360 January 5, 2004 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Response to NRC Bulletin 2003-04

REFERENCES:

1. NRC Bulletin 2003-04, 'Rebaselining of Data in the Nuclear Materials Management and Safeguards System"
2. Email dated December 9, 2003 from Donna Hinton (NAC International) on behalf of the NRC; subject: U.S. Nuclear Regulatory Commission (NRC)Bulletin 2003-04
3. Entergy Letter dated November 26, 2003 "Materials Balance Report DOE/NRC Forms 741, 742, 742C" (Reporting Identification Symbol:

YPK)

LETTER NUMBER:

2.04.002

Dear Sir or Madam:

Bulletin 2003-04 was issued to all Nuclear Regulatory Commission (NRC) licensees who have in their possession, or are licensed to possess, one or more of the following: foreign obligated natural uranium, depleted uranium, or thorium; uranium enriched in the isotope U-235, U-233, plutonium, plutonium-238, or who currently have unreconciled nuclear material balances with the Nuclear Materials Management and Safeguards System (NMMSS). The Bulletin requests a response from licensees within 90 days to report possessed quantities of nuclear materials of the types specified above.

This letter serves as the Pilgrim Nuclear Power Station (PNPS) response to NRC Bulletin 2003-04. This report is in accordance with the email issued on behalf of the NRC dated December 9, 2003, (Reference 2).

PNPS submits on an annual basis, a Material Balance Report and Physical Inventory Listing for the materials specified in Bulletin 2003-04. The most recent submittal was transmitted by letter, dated November 26, 2003, for the period ending September 30, 2003, (Reference 3). PNPS does not possess any quantities of government owned or foreign-obligated source materials as described in the Bulletin.

204002

\\.\\

t \\9A

Entergy Nuclear Operations, Inc.

Letter Number: 2.04.002 Pilgrim Nuclear Power Station Page 2 Should you have questions concerning this matter, please contact Bryan Ford at (508) 830-8403.

Sincerely, Steve Bethay Director, Nuclear Ass ssment MJG/dm cc:

U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Mr. Travis Tate, Program Manager Office of Nuclear Reactor Regulation Mail Stop: 0-88-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 204002