ML040130748

From kanterella
Jump to navigation Jump to search
Full Compliance with NRC Order for Compensatory Measures Related to Access Authorization
ML040130748
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/07/2004
From: Sheppard J
South Texas
To: Dyer J
Office of Nuclear Reactor Regulation, NRC/SECY/RAS
References
EA-02-0261, EA-03-038, NOC-AE-03001652
Download: ML040130748 (2)


Text

Nuclear Operating Company Sou1th Texas Proctlectric Gelratui Station PO. Box 289 Wadsworth TAas 77 483AAA January 7, 2004 NOC-AE-03001652 10 CFR 50.4 James E. Dyer Director, Office of Nuclear Reactor Regulations U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Secretary Office of the Secretary of the Commission U. S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555-0001 South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Full Compliance with NRC Order for Compensatory Measures Related to Access Authorization

Reference:

1). Letter, S. J. Collins to Holders of Licenses for Operating Power Reactors, "Issuance of Order for Compensatory Measures Related to Access Authorization" (EA-02-0261), January 7, 2003 This letter is provided, in accordance with Condition C.2 of Section III of Nuclear Regulatory Commission Order EA-03-038 (Reference 1). STP Nuclear Operating Company has achieved full compliance with the Order dated January 7, 2003.

If you should have any questions regarding this letter please direct them to Scott Head at (361) 972-7136.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on:

I 7/o'q

. J. Shepp rd President & Chief Executive Officer O:\\WP\\NL\\NRC-AP\\MISC-03001652 STI 31681942

NOC-AE-03001652 Page 2 of 2 cc:

(paper copy) cc:

(electronic copy)

U. S. Nuclear Regulatory Commission **

Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Bruce S. Mallett

  • Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Assistant General Counsel for Materials Litigation and Enforcement Office of General Counsel U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Physical Security Inspector, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Jeffrey Cruz U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 A. H. Gutterman, Esquire***

Morgan, Lewis & Bockius LLP L. D. Blaylock***

City Public Service David H. Jaffe ***

U. S. Nuclear Regulatory Commission R. L. Balcom ***

Reliant Energy, Inc.

A. Ramirez***

City of Austin C. A. Johnson AEP Texas Central Company Jon C. Wood ***

Matthews & Branscomb Office of General Counsel U. S. Nuclear Regulatory Commission Secretary of the Commission ***

U. S. Nuclear Regulatory Commission Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189

  • two copies
    • original and 1 copy
      • electronic copy O:\\WP\\NL\\NRC-AP\\MISC-03001 652 ST1 31681942