ML040130584

From kanterella
Jump to navigation Jump to search

November 2003 Monthly Operating Report for Wolf Creek
ML040130584
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/15/2003
From: Moles K
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, RA 03-0151
Download: ML040130584 (4)


Text

WNLF CREEK

-- 'NUCLEAR OPERATING CORPORATION Kevin J. Moles Manager Regulatory Affairs DEC 1 5 2003 RA 03-0151 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Docket No. 50-482: November 2003 Monthly Operating Report Gentlemen:

Attached to this letter is the November 2003, Monthly Operating Report for the Wolf Creek Generating Station.

Enclosed is a corrected page from the October 2003, Monthly Operating Report, Wolf Creek Nuclear Operating Corporation letter RA 03-0138. The Net Electrical Energy Generated (MWH) reported for the month of October 2003, is changed from 463,379.0 to 462,620.0.

This was the result of a calculation error that was discovered and corrected.

This correction resulted in changing the Year to Date totals for Net Electrical Energy Generated (MWH) from 8,095,265.0 to 8,094,506.0, -and the Cumulative Net Electrical Energy Generated (MWH) changed from 154,173,969.0 to 154,173,210.0.

This submittal is being made in accordance with the requirements of Wolf Creek Generating Station-Technical Specification 5.6.4, "Monthly Operating Reports."

This submittal also follows the guidance of Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have any questions regarding this report, please contact me at (620) 364-4126, or Ms. Jennifer Yunk at (620) 364-4272.

- Very KJM/rIg Attachment Enclosure cc:

J. N. Donohew (NRC), w/a, w/e

-D. N. Graves (NRC), w/a, w/e B. S. Mallett (NRC), w/a, w/e Senior Resident Inspector (NRC), wla, w/e RO. Box 411 / Burlington, KS 66839/ Phone: (620) 364-8831 An Equal Opportunity Employer MF/HC/VET

jstz
1.

I Attachment to RA 03-0151 Page 1 of 2 OPERATING DATA REPORT Report Number: 225 DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-482 Wolf Creek Generating Station December 12, 2003 J. L. Yunk (620) 364-4272 REPORT MONTH: November 2003 I 1. I Design Electrical Rating (MWe - Net):

I 1170 l

l 2.

Maximum Dependable Capacity (MWe - Net):

l 1167 This Month Year to Date Cumulative

3.

Number of Hours Reactor Critical:

0.0 6,903.3 137,039.1

4.

l Number of Hours Generator On-Line:

0.0 6,890.7 135,836.5

5.

Unit Reserve Shutdown Hours:

0.0 0.0 339.8

6.

Net Electrical Energy Generated MWH) 0.00 8,094,506.0 154,173,210.0 Wolf Creek Generating Station Monthly Operating Report November 2003 Page 1 of 2

Attachment to RA 03-0151 Page 2 of 2 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-482 Wolf Creek Generating Station December 12, 2003 J. L. Yunk (620) 3644272 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS/COMMENTS No.

Date S: SCHEDULED (Hours)

(1)

(2) 03-03 10/18/2003 S

720.0 C

4 Refueling Outage XIII continued.through entire month of November 2003.:

SUMMARY

The unit was in a regularly scheduled refueling outage from November 1, 2003 through November 30, 2003.

(1) REASON:

A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINTENANCE OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

(2) METHOD: 1. MANUAL

2. MANUAL SCRAM
3. AUTOMATIC SCRAM
4. CONTINUATION
5. OTHER Wolf Creek Generating Station Monthly Operating Report November 2003 Page 2 of 2

Attachment to RA 03-0138 Page 1 of 2 OPERATING DATA REPORT Report Number: 224 DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-482 Wolf Creek Generating Station November 11, 2003 J. L. Yunk (620) 364-4272 REPORT MONTH: October 2003 I 1.

Design Electrical Rating (MWe - Net):

l 1170 l

l2.

Maximum Dependable Capacity (MWe - Net):

1167 This Month Year to Date Cumulative

3.

Number of Hours Reactor Critical:

408.0 6,903.3 137,039.1

4.

Number of Hours Generator On-Line:

408.0 6,890.7 135,836.5

5.

Unit Reserve Shutdown Hours:

0.0 0.0 339.8

6.

Net Electrical Energy Generated (MWH) 462,620.0 8,094,506.0 154,173,210.0 Wolf Creek Generating Station Monthly Operating Report October 2003 Page 1 of 2