ML040120674
| ML040120674 | |
| Person / Time | |
|---|---|
| Site: | Oregon State University |
| Issue date: | 12/30/2003 |
| From: | Klein A Oregon State University |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-82-039, GL-84-018 | |
| Download: ML040120674 (1) | |
Text
WHEN SEPARATED FROM ENCLOSURES, HANDLE THIS DOCUMENT AS DECONTROLLED RADIATION CENTER OREGON STATE UNIVERSITY 100 Radiation Center, Corvallis, Oregon 97331.5903 Telephone 541-737-2341 Fax 541-737.0480 December 30,2003 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Reference:
Oregon State University TRIGA Reactor (OSTR),
Docket No. 50-243, License No. R-106
Subject:
10 CFR 50.54(p) Report of Changes to the OSTR Physical Security Plan Which Do Not Decrease the Effectiveness of the Plan Gentlemen:
As a result of our annual review of the OSTR Physical Security Plan, certain changes to the plan were determined to be necessary. This letter represents our formal report of the changes governed by 10 CFR 50.54(p). Based on our evaluation of these revisions, we have concluded that none of the specific changes in the attached enclosure reduces the plan's effectiveness.
In keeping with the instructions in USNRC generic letters 84-18 and 82-39, specific information regarding the Physical Security Plan changes are included as a separate enclosure (Enclosure 1) to this letter. Enclosure 2 provides the necessary replacement pages for your copy of the Physical Security Plan. All changes and updates to the Physical Security Plan have been reviewed by the OSTR physical security staff and approved by the Reactor Operations Committee. It was concluded by both groups that the safeguards effectiveness of the OSTR physical security program is not reduced by adoption of these changes.
If there are any questions regarding the information submitted, please let me know. In accordance with 10 CFR 2.790(d) and any other applicable parts of the USNRC's regulations, we hereby request that Enclosure 1, Enclosure 2, and this letter, when it is attached to either or all of these enclosures, be withheld from public disclosure.
I declare under penalty of perjury that the foregoing is true and correct. Executed on December 30, 2003.
Yours sincerely, Andrew C. Klein Director cc:
Al Adams, U.S. Nuclear Regulatory Commission S 0oo Craig Bassett, U.S. Nuclear Regulatory Commission David Stewart-Smith, Oregon Office of Energy (w/o enclosures)
John Ringle, Chairman, Reactor Operations Committee (w/o enclosures)