Text
PUBLIC MEETING WITH POINT BE BEACH ACH BEA CH NUCLEAR PLANT Nuclear Regulatory Commission Region III
Meeting Purpose
- Inform Public of the results of the NRC Inspection Procedure (IP) 95003 Inspection at Point Beach
- NRC staff available to answer questions from the Public 2
Meeting AgendaAgenda
- Introductions
- Regulatory Oversight Process
- Results of IP 95003 Inspection at Point Beach
- Point Beach/NMC Presentation
- Questions and Answers 3
NRC Personnel Geoffrey Grant Deputy Regional Administrator, Region III Steven Reynolds Acting Director, Division of Reactor Projects, Region III Eric Leeds Deputy Director, Division of Licensing Project Management, Office of Nuclear Reactor Regulation Tony Vegel Chief, Branch 7, Division of Reactor Projects, Inspection Team Leader 4
NRC Personnel (cont)
Mike Kunowski Project Engineer - Assistant Team Leader Ken Riemer Chief, Plant Support Branch, Division of Reactor Safety, Region III Deirdre Spaulding Project Manager, Office of Nuclear Reactor Regulation Paul Krohn Point Beach Senior Resident Inspector Mike Morris Point Beach Resident Inspector 5
Point Beach/NMC Introduction 6
NRC Mission Regulate the Nations civilian use of Nuclear Material to ensure adequate protection of Public Health and Safety.
7
NRC NRC Performance Goals
- Maintain safety and protect environment
- Enhance public confidence
- Improve:
- effectiveness
- efficiency
- realism of processes and decision-making
- Reduce unnecessary regulatory burden 8
NRC NRC Oversight A Activities ctivities
- Provide assurance plants are:
- Operating safely
- Complying with regulations
- Inspections focused on key safety areas
- Objective indicators of performance
- Assessment program triggers regulatory actions 9
Reactor Oversight Process SAFETY SIGNIFICANCE GREEN - very low WHITE - low to moderate YELLOW - substantial RED - high http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html 10
Point Beach Auxiliary Feedwater/Instrument Air Red Inspection Finding
- Identified by Point Beach staff in November 2001
- NRC Special Inspection (Event Follow-Up Inspection) Dec. 2001 -
Feb. 2002
- Red Finding - July 12, 2002 - but possible Old Design Issue
- Second Special Inspection -
Sept. 2002 - March 2003 11
Auxiliary Feedwater/Instrument Feedwater/Instrument Air Red Inspection Finding (Cont)
Cont)
- Determined to not be an Old Design Issue
- April 2, 2003 - Final Determination:
Red Issue
- April 2003 Agency Action Review Meeting - Decision to perform IP 95003 inspection at Point Beach 12
Point Beach Auxiliary Feedwater/
Feedwater/Recirculation Line Orifice Plugging Issue
- October 29, 2002 - Second Potential Common Mode Failure of Auxiliary Feedwater Pumps identified during routine system test
- Failure Mechanism - Plugging of the recirculation line flow orifices
- Inadequate Corrective Actions for first Auxiliary Feedwater issue contributed to the significance of the second issue 13
Auxiliary Feedwater/
Feedwater/Recirculation Line Orifice Plugging Issue (Cont)
Cont)
- IP 95003 Inspection reviewed Point Beach corrective actions for Auxiliary Feedwater orifice plugging issue
- December 11, 2003 - Final Significance Determination: Unit 1 - Yellow Issue; Unit 2 - Red Issue 14
Inspection Procedure (IP) 95003 Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellows, or One Red Finding Input.
Intent: Provide the NRC with supplemental information regarding licensee performance, as necessary to determine the breadth and depth of safety, organizational, and programmatic issues.
15
IP 95003 Inspection Objectives
- 1) Provide insights into overall causes of Performance Deficiencies
- 2) Evaluate Programs and Processes
- 3) Evaluate licensee ability to identify, evaluate, and correct problems
- 4) Extent of Risk Significant Issues
- 5) Provide NRC recommendation for further Regulatory Action 16
- More diagnostic than baseline procedures
- Includes reviews of programs and processes not reviewed during baseline
- Reviews aspects of strategic performance areas that are known to be a problem as well as those aspects that are not known to be problems
- Results of the 95003 used in deciding what additional actions should be taken 17
The Point Beach 95003
- Three Phases
- 1) Corrective Action Team (CAT)
- 2) Emergency Preparedness Team (EPT)
- 3) Engineering, Operations, and Maintenance Team (EOMT) 18
Corrective Actions Team (CAT)
- Review the Process, Programs, and Procedures for Identifying Problems
- Five Inspectors
- Two Weeks Onsite (July 28, 2003 - August 8, 2003) 19
Corrective Action Team
- Reviewed several hundred Corrective Action documents
- Interviewed plant staff
- Reviewed Excellence Plan 20
Corrective Action Team Summary of Results
- Adequate Corrective Action Program
- Inconsistent Implementation of Corrective Action Program:
- Actions not completed
- Actions not timely
- Excellence Plan - Encompasses major areas requiring performance improvement 21
Corrective Action Team Summary of Results (Cont)
First and Second Auxiliary Feedwater Red Issues
- Adequate investigation of events
- Root cause evaluation for second finding was thorough
- Appropriate corrective actions identified
- Inconsistent implementation of corrective actions 22
Emergency Preparedness Team (EPT)
- Ensure the Emergency Preparedness Program Complies with Regulations and Follows Commitments
- Four Inspectors
- Two Weeks (August 4-15, 2003) 23
Emergency Preparedness Team (EPT)
Reviewed
- Facilities and Equipment
- Emergency Preparedness Procedures
- Emergency Preparedness Exercise 24
EPT Summary of Results
- Adequate Implementation of Emergency Preparedness (EP) Program
- Successful EP Exercise Observed
- Some Challenge Areas:
- EP Staff Experience and Training
- Maintenance of EP Licensing Basis
- Understanding EP Regulatory Requirements 25
EPT Summary of Results (Cont)
Findings:
- Apparent Violation - Failure to Maintain a Standard Emergency Action Level Scheme
- Three Preliminary Green Findings
- One Potential Severity Level IV Violation regarding performance indicators
- One Unresolved Item regarding Protective Action Recommendations 26
Engineering, Operations, and Maintenance Team Inspection (EOMT)
- Review the Processes, Programs, and Procedures for Engineering -
Particularly, Design Engineering
- Eight Inspectors
- Three Weeks of Inspection (September 2003) 27
Engineering, Operations, and Maintenance Team Inspection (EOMT) (contd)
- Corrective Action Implementation
- Auxiliary Feedwater System
- Design
- Component Cooling Water System
- 125-Volt Direct Current System 28
Engineering, Operations, and Maintenance Team Inspection (EOMT) (contd)
- Human Performance
- Procedure Quality
- Equipment Performance
- Configuration Control 29
Engineering, Operations, and Maintenance Team Inspection Summary of Results
- Component Cooling Water System:
Design and licensing basis understood and controlled
- 125-Volt DC System:
- Design calculations control deficiencies 30
Engineering, Operations, and Maintenance Team Inspection Summary of Results (Cont)
- 125-Volt DC System: (Cont)
- Control of Design Basis is a challenge
- Design is Robust
- System is operable 31
Engineering, Operations, and Maintenance Team Inspection Summary of Results (Cont)
Corrective Actions Multiple Examples of untimely or inadequate implementation of corrective actions 32
Engineering, Operations, and Maintenance Team Inspection Summary of Results (Cont)
Preliminary Inspection Findings:
Seven Green Findings (Very Low Safety Significance) -
2 Design Control 1 Fire Protection 1 Test Control 1 Procedures 1 Corrective Actions 33 1 Environmental Qualification
Inspection Procedure (IP) 95003 Inspection Overview of Results Objective #1 - Provide insights into overall causes of Performance Deficiencies
- Causes for Red Findings
- Lack of understanding of design
- Corrective Action Program weaknesses
- Weak Operations/Engineering interface 34
IP95003 Inspection Overview of Results (Cont)
- Causes for Emergency Preparedness Performance Problems
- Lack of Understanding of Requirements
- Management Oversight 35
IP95003 Inspection Overview of Results (Cont)
Objective #2 - Evaluate Programs and Processes
- Operations and Maintenance Programs were Adequate
- Operations/Engineering Interface remains a challenge 36
IP95003 Inspection Overview of Results (Cont)
- Engineering
- Operability Determinations (long standing)
- Modification Process Rigor
- Electrical Design Control Weaknesses
- Quality and Understanding of Electrical Design Calculations 37
IP95003 Inspection Overview of Results (Cont)
Objective #3 - Evaluate Corrective Action Process
- Corrective Action Program is sound
- Implementation of Program is a challenge
- Identification - Good
- Assessing Problems - Adequate
- Fixing Problems - Inconsistent 38
IP95003 Inspection Overview of Results (Cont)
Objective #4 - Extent of Risk Significant Issues The Team did not identify any systems that could not perform safety function 39
IP95003 Inspection Overview of Results (Cont)
- Verified Auxiliary Feedwater System -
- Component Cooling Water System - Good control of design and licensing basis
- 125-Volt DC system
- Operable
- Design control a challenge 40
IP95003 Inspection Overview of Results (Cont)
Objective #5 - Recommendation for further Regulatory Action by NRC
- Plan to Conduct Additional Inspections Above Baseline
- Plan to Confirm that Corrective Actions are being taken and that performance improves 41
IP95003 Inspection Overall Conclusion Point Beach is being operated Safely Challenge Areas -
- Corrective Action Implementation
- Engineering Design Control Continued Supplemental Regulatory Oversight is Warranted 42
Inspection Inspection Report
- Expected Expected issuance -
early January 2004
- Publicly Available -
Through Th rough Throu gh NRC Web S Site ite 43
- Verification of Excellence Plan Implementation
- Follow-Up Inspections 44
POINT BEACH PRESENTATION PRESENTATION 45
NRC CLOSING CLOSING REMARKS REMARKS 46
QUESTIONS QUESTIONS ?
47
Contacts for Additional Information
- Regional Public Affairs Officer
- Jan Strasma or Viktoria Viktoria Mitlyng
- Phone: (630) 829-9663 or 829-9662
- E-mail: opa3@nrc.gov
- Website: http://www.nrc.gov 48
Contacts for Additional Information (cont)
- Point Beach Resident Inspector Office
- Paul Krohn, Senior Resident Inspector
- Mike Morris, Resident Inspector
- Phone: (920) 755-2309 49