ML040020092
| ML040020092 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 12/30/2003 |
| From: | NRC/NRR/DLPM |
| To: | |
| References | |
| TAC MC1114 | |
| Download: ML040020092 (1) | |
Text
SDV Vent and Drain Valves 3.1.8 3.1 REACTIVITY CONTROL SYSTEMS 3.1.8 Scram Discharge Volume (SDV) Vent and Drain Valves LCO 3.1.8 APPLICABILITY:
Each SDV vent and drain valve shall be OPERABLE.
MODES 1 and 2.
ACTIONS
NOTES------------------------------------
- 1. Separate Condition entry is allowed for each SDV vent and drain line.
- 2. An isolated line may be unisolated under administrative control to allow draining and venting of the SDV.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more SDV vent A.1 Isolate the 7 days or drain lines with associated line.
one valve inoperable.
B. One or more SDV vent B.1 Isolate the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or drain lines with associated line.
both valves inoperable.
C. Required Action and C.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
I GRAND GULF
- 3. 1-26 Amendment No. 4-19, 161