MONTHYEARML1201700872012-02-28028 February 2012 Letter to Tolbert Termination of Facility Operating License No. R-52 for the University of Arizona Research Reactor at the Nuclear Reactor Laboratory ML12003A2372011-12-12012 December 2011 University of Arizona Nuclear-related Material Disposition ML11346A3002011-12-0101 December 2011 Final Status Survey Report and Request for License Termination for the University of Arizona Research Reactor ML11319A1012011-11-0707 November 2011 Oak Ridge Institute for Science & Education Independent Confirmatory Survey Report for the University of Arizona Nuclear Reactor Laboratory, Tuscon, Az ML11265A0552011-09-12012 September 2011 Univ of Arizona - Annual Report (July 1, 2010 - August 31, 2011) ML17284A1202011-09-0101 September 2011 Univ. of Arizona, Tucson - Submittal of Annual Defueling & Decommissioning Chronology Report Covering for the Period 07/01/2010 Through 08/31/2011 ML11234A1642011-08-18018 August 2011 Changes to RAIs and Final Status Survey Plan for University of Arizona Nuclear Reactor Laboratory IR 05000113/20110012011-07-0505 July 2011 IR 05000113-11-001; 06/21-24/2011; University of Arizona; Inspection Report ML11168A0592011-05-25025 May 2011 Final Status Survey Plan Submission for Decommissioning the University of Arizona'S Research Reactor ML1104705922011-04-15015 April 2011 University of Arizona - Issuance of Amendment No. 20 to Facility License No. R-52 for the University of Arizona Research Reactor Regarding Decommissioning Plan Approval ML1110401762011-04-15015 April 2011 University of Arizona - Change in Project Management and Project Manager for the University of Arizona Research Reactor ML11111A1802011-03-31031 March 2011 University of Arizona, Decommissioning the University of Arizona Research Reactor ML1029804132011-02-16016 February 2011 University of Arizona - Issuance of Amendment No. 19 to Facility License No. R-52 for the University of Arizona Research Reactor (Tac No. ME3989) ML1033704482010-11-22022 November 2010 Revised Quality Assurance Program for the University of Arizona Research Reactor ML1029300342010-10-13013 October 2010 University of Arizona'S - Post-Shutdown Radiological Characterization Report ML1029201342010-10-0808 October 2010 University of Arizona - Supplements to License Revision Request on 05/20/10 ML1027804832010-09-23023 September 2010 Annual Report for License R-52, Docket 50-113, University of Arizona ML1027102692010-09-20020 September 2010 Revision to Possession Only License for the University of Arizona Research Reactor ML1023603562010-08-13013 August 2010 Possession Only License for the University of Arizona Research Reactor ML1014504102010-05-20020 May 2010 Possession Only License for the University of Arizona Research Reactor IR 05000113/20102012010-04-28028 April 2010 IR 05000113-10-201, on April 6-7, 2010, University of Arizona, Selected Aspects of the University of Arizona (the Licensee) Class II Research Reactor Facility Safety Programs Including Organization and Staffing; Operations Logs and Records; ML1009200892010-03-26026 March 2010 Response to Request for Additional Information Regarding Decommissioning of University of Arizona Nuclear Reactor Laboratory ML1005506142010-02-25025 February 2010 University of Arizona, Request for Additional Information Regarding Decommissioning ML0926502832009-09-11011 September 2009 University of Arizona Annual Report for July 1, 2008 Through June 30, 2009 ML0917608702009-07-28028 July 2009 Initial Examination Report, 50-113/OL-09-01, University of Arizona ML0917610102009-07-28028 July 2009 Initial Examination Results Letter, 50-113/OL-09-01, University of Arizona ML0918106982009-07-0707 July 2009 University of Arizona, Change of Facility Project Manager Eff. 4/1/2009 to William Schuster ML0914800902009-05-21021 May 2009 Statement of Intent to Obtain Decommissioning Funding for the University of Arizona Research Reactor ML1006209262009-05-21021 May 2009 University of Arizona, Research Reactor, Operating License Termination Request After 05/22/2010 Expiration IR 05000113/20092022009-04-10010 April 2009 IR 5000113-09-202, on 03/09/2009 - 03/12/2009, for University of Arizona Nuclear Reactor Laboratory IR 05000113/20092012009-04-0909 April 2009 IR: University of Arizona Nuclear Reactor Laboratory - NRC Routine, Announced Inspection Report No. 50-113/2009-201 ML0907100272009-03-17017 March 2009 Initial Examination Corporate Notification Letter No 50-113/OL-05-01, University of Arizona ML0824705612008-08-21021 August 2008 Annual Report for University of Arizona, Tucson, for 07/01/2007 Through 06/30/2008 IR 05000113/20082012008-01-23023 January 2008 University of Arizona - NRC Routine Inspection Report No. 50-113/2008-201 ML0709302912007-10-26026 October 2007 Change of Facility Project Manager University of Arizona, Docket 50-113 ML0726810952007-08-25025 August 2007 Annual Report Covering the Period of July 2006 Through June 30, 2007 for License R-52, University of Arizona, Docket 50-113 ML0707501402007-04-30030 April 2007 Issuance of Order Imposing Fingerprinting and Criminal History Records Check Requirements for Unescorted Access to Certain Research and Test Reactors ML0702200022007-01-26026 January 2007 National Organization of Test, Research and Training Reactors(Trtr) Input on Fingerprinting Requirements for Unescorted Access to Research and Test Reactors ML0629800772006-10-23023 October 2006 E-mail to Research and Test Reactor from M. Mendonca Draft Directors Decision on Uncontrolled/Unmonitored Releases IR 05000113/20062012006-09-19019 September 2006 NRC Routine Announced Inspection Report No. 50-113/2006-201 ML0624302742006-09-12012 September 2006 Initial Examination Results Letter No. 50-113/OL-06-01, University of Arizona ML0624302612006-09-12012 September 2006 Initial Examination Report No. 50-133/OL-06-01, University of Arizona IR 05000113/20062022006-09-0808 September 2006 University of Arizona - NRC Security Inspection Report 50-113/2006-202 ML0624905152006-08-25025 August 2006 Transmittal of Annual Report Covering the Period of July 2005 Through June 30, 2006, for the Activities of Triga Mark I Reactor at the University of Arizona, Tucson, Arizona ML0612302662006-05-0808 May 2006 Letter to Dr. John G. Williams from Phillip Young Initial Examination Corporate Notification Letter No. 50-113/OL-06-01, University of Arizona ML0604703562006-03-0303 March 2006 Decommissioning Considerations Regarding University of Arizona'S Nuclear Reactor Laboratory IR 05000113/20052012005-12-0808 December 2005 IR 05000113-05-201, 12/08/2005, University of Arizona ML0527101392005-10-0707 October 2005 RAI Letter- Security Measures- Williams ML0524204702005-08-15015 August 2005 Annual Report for the University of Arizona, July 1, 2005 Through June 30, 2005 ML0523501782005-08-15015 August 2005 Response to July 19, 2005 Enclosed Order (EA-05-007) 2012-02-28
[Table view] Category:Licensee 30-Day Written Event Report
MONTHYEARML0336000242003-12-11011 December 2003 Technical Specifications Required Written Report, Transmitted within Thirty Days Concerning 10CFR50.36 (c)(3) ML0216502112002-05-28028 May 2002 Required Report, Transmitted within 30 Days. University of Arizona Deficiency Report for Defiency Discovered on 05/20/2002, in Implementation of University of Arizona Operator Re-qualification Program as Required in 10 CFR 55 2003-12-11
[Table view] Category:Written Event Report (30 or 60 day)
MONTHYEARML0336000242003-12-11011 December 2003 Technical Specifications Required Written Report, Transmitted within Thirty Days Concerning 10CFR50.36 (c)(3) ML0216502112002-05-28028 May 2002 Required Report, Transmitted within 30 Days. University of Arizona Deficiency Report for Defiency Discovered on 05/20/2002, in Implementation of University of Arizona Operator Re-qualification Program as Required in 10 CFR 55 2003-12-11
[Table view] |
Text
-
Nuclear Reactor Laboratory THE UNIVERSIrY OF John G. Williams, Director Engineering Building (20) e-mail: wiw()engr.arizona.edu P. O. Box 210020 1 voice: (520) 621-9729 Tucson, Arizona 85721-0020 TUCSON ARmZoNA FAX: (520) 621-8096 December 11, 2003 To: U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mailstop P1-37 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 From: John G. Williams, Director, Nuclear Reactor Laboratory, University of Arizona, Tucson, AZ 85721-0020 Re: Technical Specifications required written report, transmitted within thirty days; Facility License R-52, Docket 50-113. This item is concerning 10CFR50.36 (c) (3).
Technical Specifications for Facility License R-52, the University of Arizona, requires in section 6.7 c.4 a written report to the Commission of, "Any observed inadequacies in the implementation of administrative or procedural controls." This report fulfills that requirement in the case of a failure to properly implement Section 2.1 "ADMITTANCE TO UNIVERSITY OF ARIZONA RESEARCH REACTOR LABORATORY" Item 1 "Entry Authorization List" of procedure UARR 100.
UARR 100 Section 2.1, Item 1 "Entry Authorization List" states: "Those persons listed on the University of Arizona Research Reactor Entry Authorization List may enter the Reactor Laboratory themselves, and may authorize the entry of other persons (visitors) unless excluded by the Reactor Supervisor or the Reactor Operator on duty. Authorization of entry shall be in person. Such authorization shall be made only if, in the judgement of the person authorizing the entry: a) there is a valid reason for the entry, b) the visitors present no hazard to themselves, the facility, or reactor operations by their presence in the laboratory, and c) an escort or suitable number of escorts, is assigned from the persons designated on the Authorized Entry List for supervising the visitor(s) while in the Reactor Laboratory."
Description of the Occurrence During the span of the days November 17 - 20, 2003, an inspector from the Nuclear Regulatory Commission (NRC) was present to perform a facility inspection. Craig Bassett is the University of Arizona facility inspector for the NRC. At approximately 1333 on November 18, 2003 Mr. Bassett requested access to the NRL to review plant-operating records. Earlier that same day the Reactor Supervisor, Mike Gavelek, filled out the appropriate paperwork to allow a visitor into the NRL. This paperwork included UARR 166 "Guidelines for Tours and Professional Visits" and form T-1 6 "Visitor Log" referenced on page 6 of UARR 100. Mr. Bassett was also issued a personal radiation detection device.
Per UARR 100, the Reactor Supervisor is required either to escort or provide an escort for the visitor while in the NRL. The Reactor Supervisor left Mr. Bassett unescorted in the NRL for approximately 30 C:\NRL\Reports\occurl 103.doc
minutes. At approximately 1500, after Mr. Bassett had already exited the NRL, the Reactor Supervisor realized that he should not have left the inspector in the NRL unescorted. The Reactor Supervisor immediately attempted to contact the Reactor Director to inform him of the situation. At approximately 1630 the Reactor Supervisor informed the Reactor Director of the situation and the NRC Inspector was subsequently informed of the inadequacy of administrative or procedural controls at 1715 on the same day.
Cause of the Occurrence The failure to comply with UARR 100 Section 2.1 on November 18, 2003 occurred because of a poor thought process on the part of the Reactor Supervisor. His trust, personal knowledge and taking into account the security clearance of the inspector distracted him from following UARR 100 to the letter. It was the Reactor Supervisor who subsequently realized his mistake, and reported it.
Possible Consequences The obvious possible consequences are the security implications of an unescorted visitor, ranging from destruction of property to theft of material. In this instance, however, the visitor was personally known to licensee personel, was known to be on official business, and was known to be trustworthy. Therefore no negative outcome could be expected.
Remedial Actions On the morning of November 19, 2003, the Reactor Director instructed the Reactor Supervisor to perform a complete check of the facility following the incident of the unescorted visitor. The check was completed prior to operations. There was no damaged or missing equipment noted and no abnormalities found in the NRL. This was conveyed in a memo from the Reactor Supervisor, attached to this document.
The performance of this check in no way infers that the University of Arizona NRL Staff believes that Mr. Bassett would do anything to cause harm or damage to the NRL or its staff. It was done to demonstrate appropriate remedial action in response to a visitor being left unescorted.
The Reactor Director conducted an in depth discussion with the Reactor Supervisor regarding UARR 100 and its application with regard to visitors. This has corrected any deficiency that the Reactor Supervisor may have had in regards to admitting visitors in to the NRL.
The name of Mr. Bassett, being the designated NRC inspector for this facility, has been added to the NRL "Standing Authorized Entry List". In the future he can be left unescorted in the facility, if there is a need to do so.
I believe that these actions will prevent a recurrence of any similar oversight of the requirements of UARR 100.
This event was opened and closed as a Non Cited Violation by the facility inspector designated 50-113/2003-201-01 J.,fT Williams, Director, Nuclear Reactor Laboratory C:ANRL\Reports\occurl 103.doc
copies to:
Events Assessment, Generic Communications and Non-Power Reactors Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 The V.P. for Research, University of Arizona Richard C. Powell The Director of the Arizona Research Laboratories Michael A. Cusanovich Members of the Reactor Committee The Reactor Supervisor Michael L. Gavelek C:\NRL\Reportskoccurl 103.doc
Nuclear Reactor Laboratory E UNIVERSITY OF John G. Williams, Director Engineering Building (20) e-mail: jgwlengr.arizona.edu P. 0. Box 210020 Tucson, Arizona 85721-0020 ARIZONA voice: (520) 621-9729 FAX: (520) 621-8096 TUCSON AZONA November 19, 2003 To: John G. Williams, Director, Nuclear Reactor Laboratory, From: Michael Gavelek Reactor Supervisor Re: Memo documenting complete check of NRL following unescorted visitor incident.
This memo is to inform you that I completed a thorough check of the NRL following the unescorted visitor incident of November 18, 2003.
A complete inventory of the fuel was done and none was found to be missing or disturbed. All door locks and padlocks were found to be undisturbed. All instrumentation was found to be untouched.
This check was completed prior to any operations.
C:NRL\Reports\occurl 103memo.doc