November 2003 Monthly Operating Report for Turkey Point Units 3 and 4
ML033560256
Person / Time
Site: Turkey Point  
(DPR-031, DPR-041)
Issue date: 12/12/2003
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2003-302
Download: ML033560256 (3)


Text

FPL DEC 1 2 2003 L-2003-302

.10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - November 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours Terry O. or1 Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

I DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-250 Turkey Point Unit 3 11/02/2003 Linda Tudor (305) 246-6408 Reporting Period November, 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 7249.8 201789.2 No. of hours generator was on line (service hours) 720 7207.8 199416 Unit reserve shutdown hours 0

0 121.8 Net Electrical Energy (MWH) 518556 4961554 130320631 UNIT SHUTDOWNS No.

Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)

(1)

Shutting S=Scheduled Down (2)

N/AN/A N/A NIA N/A N/A NIA (1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G -Operational Error (Explain)

H -Other (2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of November 2003.

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-251 Turkey Point Unit 4 11/02/03 Linda Tudor (305) 246-6408 Reporting Period November, 2003 Design Electrical Rating (MWe-Net) 720.-

-r a - I-.- __

Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 642.1 7313.1 198675.8 No. of hours generator was on line (service hours) 618.2 7289.2 194234.4 Unit reserve shutdown hours 0

0 577.2 Net Electrical Energy (MWH) 421178 5018871 127977961 UNIT SHUTDOWNS No.

Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)

(1)

Shutting S=Scheduled Down (2) 20030023 11/01/2003 S

101.8 C

N/A RF21 (1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/LUcense Examination F-Administrative G - Operational Error (Explain)

H - Other (2) Method 1 - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summarv Of Monthiv Overatina Experience The unit was placed on-line on November 5, 2003 and has operated at essentially 100% for the remainder of the month.