VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRairuA 23261 January 27, 2003 Re: 10CFR 2.202
- 0 CFR 50.4 U.S. Nuclear Regulatory Commission Serial No.:
03-067 Attention: Document Control Desk NL&OS/MAE:
R1 Washington, D.C. 20555-0001 Docket Nos.:
50-280 50-281 License Nos.:
DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 ANSWER TO ORDER FOR COMPENSATORY MEASURES RELATED TO ACCESS AUTHORIZATION DATED JANUARY 7, 2003 On January 7, 2003, the Nuclear Regulatory Commission (NRC) issued an Order requiring compensatory measures related to access authorization for all operating nuclear power reactor licensees.
The Order stated that following the events of September 11, 2001, the NRC issued a number of Safeguards and Threat Advisories to its licensees in order to strengthen licensees' capabilities and readiness to respond to a potential attack on a nuclear facility.
As a result of its consideration of licensees' access authorization programs as part of the comprehensive security review, the Commission has determined that certain compensatory measures are required to be implemented by licensees as prudent measures to improve access authorization at operating power reactors.
The Order required that licensees immediately start implementation of the requirements in the Order, respond to specific actions within twenty (20) days of the date of the Order, and complete implementation of requirements identified in the Order by July 7, 2003, with the exception of compensatory measure B.1.1, which are to be implemented no later than April 7, 2003, and C.1.6 and C.1.8, which is to be completed no later than January 7, 2004.
In accordance with Section IV of the Order and 10 CFR 2.202, Virginia Electric and Power Company (Dominion) hereby submits its answer to the Order. Attachment 1 to this letter summarizes the subsequent actions made in the response to the Order. to this letter provides a response to each of the items stated in to the Order.
Dominion consents to the Order as described in Attachments 1 and 2, and does not request a hearing.
ATTACHMENTS I AND 2 CONTAIN SAFEGUARDS INFORMATION.
UPON SEPARATION THIS PAGE IS DECONTROLLED.
Attachments 1 and 2 to this letter contain Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
If you have any questions, please contact us.
Very truly yours, Eugene S. Grecheck Vice President - Nuclear Support Services - Summary of Subsequent Action Items From Attachment 2 (Safeguards Information) - Response To Compensatory Measures for Access Authorization in Current Threat Environment (Safeguards Information)
ATTACHMENTS I AND 2 CONTAIN SAFEGUARDS INFORMATION.
UPON SEPARATION THIS PAGE IS DECONTROLLED.
I cc:
U. S. Nuclear Regulatory Commission ATTN: Mr. Glenn Tracy Mail Stop T-4A9 Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 Secretary, Office of the Secretary of the Commission (w/o Aft. 1 and 2)
U. S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, D. C. 20555 Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Assistant General Counsel for Materials Litigation and Enforcement (w/o Aft. 1 and 2)
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 U. S. Nuclear Regulatory Commission Region II Regional Administrator P. O. Box 2257 Atlanta, Georgia 30303-3415 Mr. C. Gratton (w/o Aft. 1 and 2)
NRC Senior Project Manager Surry Power Station Mr. R. A. Musser (w/o Att. 1 and 2)
NRC Senior Resident Inspector Surry Power Station ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION.
UPON SEPARATION THIS PAGE IS DECONTROLLED.
SN: 03-067 Docket Nos.: 50-280/281
Subject:
Response to Security Order COMMONWEALTH OF VIRGINIA
)
)
)
COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Eugene S. Grecheck who is Vice President-Nuclear Support Services of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this A day of
,w a) li 2003.
My Commission Expires:
Notary Public (SEAL)
ATTACHMENTS I AND 2 CONTAIN SAFEGUARDS INFORMATION.
UPON SEPARATION THIS PAGE IS DECONTROLLED.