I-ExeIe nA Exelon Nuclear Limerick Generating Station P.O. Box 2300 Pottstown, PA 19464 www.exeloncorp.com Nuclear T.S. 6.9.1.6 December 12,2003 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Limerick Generating Station, Units 1 arid 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353

Subject:

Monthly Operating Report for November 2003 Attached is the monthly operating report for Limerick Units 1 and 2 for the month of November 2003 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of NRC Generic Letter 97-02. The attached monthly operating report data has also been entered into the INPO Consolidated Database for the month of November 2003 for Units 1 and 2.

If you have any questions or require additional information, please do not hesitate to contact us.

Sincerely, Bryan C. Hanson Plant Manager-LGS P 3,. /-o ATu>.

Attachments cc:

H. Miller, Administrator, Region I, USNRC A. Burritt, LGS USNRC Senior Resident Inspector ABLY-

bcc:

R. DeGregorio - GML 5-1 B. Hanson - GML 5-1 C. Mudrick - SSB 3-1 E. Kelly - SSB 3-1 K. Kemper - SSB 2-4 S. Gamble - SSB 2-4 R. McCall - SSB 2-3 J. Toro - SMB 1-2 G. Lee - SSB 3-1 J. Grimes - KSA 2N J. Humphreys - KSA 3G D. Dyckman (PABRP) SSB 2-4

Unit:

Docket No:

Date:

Completed by:

Telephone:

Limerick 1 50-352 12/12/03 Greg Lee (610) 718-3707 A.

OPERATING DATA REPORT REPORTING PERIOD-November 2003

[

Design Electrical Rating (MWe-Net) 11191.00 Maximum Dependable Capacity (MWe-Net) 1134.00 1

Month Year to Date Cumulative Hours Reactor Critical (Hours) 720.00 7,954.07 137,822.47 Hours Generator On-Line (Hours) 720.00 7,928.10 135,837.20 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00 Net Electrical Enerav (MWh) 840,060 9,183,533 140,952,357 B.

UNIT SHUTDOWN No.

Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)

Off-line Duration (hrs)

None During November

SUMMARY

Unit 1 began the month of November 2003 at 100.0% of rated thermal power (RTP).

On November 2r4 at 22:02 hours, reactor power was reduced from 100.0% RPT to 94.4% RTP for channel bow testing.

On November 3r0 at 05:37hours, reactor power was restored to 99.9% RTP. At 22:01 hours, reactor power was reduced from 99.9% RTP to 98.2% RTP for channel bow testing.

On November 4m at 05:23 hours, reactor power was restored to 99.9% RTP. At 22:03 hours, reactor power was reduced from 99.9% RTP to 98.6% RTP for channel bow testing.

On November 5"n at 03:20 hours, reactor power was restored to 99.9% RTP.

Unit 1 ended the month of November 2003 at 100.0% RTP.

Type Reason F-Forced A-Equipment Failure (Explain)

S-Scheduled B-Maintenance or Test D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-COntie ation )

5-Other (Explain)

C.

SAFETY/RELIEF VALVE OPERATION Date Valves Actuated l No. &Type of Actuation l Plant Condition l Description of Event I

l l None During November

Unit:

Docket No:

Date:

Completed by:

Telephone:

A.

OPERATING DATA REPORT REPORTING PERIOD-November 2003 1 Design Electrical Rating (MWe-Net) 11191.00 I

Maximum Dependable Capacity (MWe-Net) 1134.00 Limerick 2 50-353 12/12/03 Greg Lee (610)718-3707 Month Year to Date Cumulative Hours Reactor Critical (Hours) 720.00 7,578.60 113,706.10 Hours Generator On-Line (Hours) 720.00 7,508.72 111,943.72 Unit Reserve Shutdown Hours (Hours) 0.00 0.00 0.00 Net Electrical Energy (MWh) 842,747 8,509,010 120,143,253 B. UNIT SHUTDOWN No.

Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)

Off-line Duration (hrs)

None during November

SUMMARY

Unit 2 began the month of November 2003 at 99.9% of rated thermal power (RTP).

On November 11 at 22:02 hours, reactor power was reduced from 100.0% RTP to 83.9% RTP for channel bow testinq.

On November 12 ' at 11:24 hours, reactor power was restored to 99.5% RTP.

Unit 2 ended the month of November 2003 at 100.0% RTP.

Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)

F-Administrative G-Operational Error (Explain)

C. SAFETY/RELIEF VALVE OPERATION Date Valves Actuated No. & Type of Actuation Plant Condition Description of Event I

None During November